17-R-4703-0001.docx
DOCX document 53 KB Posted
- Attached to
- USNS YUMA Post Shakedown Availability & Dry Dock Federal contract opportunity
- Solicitation number
- N32205-17-R-4703
About this file
Amendment N32205-17-R-4703-0001
View the file
Other files for this federal contract opportunity
Show all 50
USNS YUMA Post Shakedown Availability & Dry Dock has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-17-R-4703
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0001AA
The CLIN extended description has changed from:
USNS YUMA (T-EPF 8) PSA/DD MSC FUNDED CAT "A" WIsCAT "A" WORK ITEMS 010, 011, 012, 013, 014, 015, 016, 017, 018, 019, 020, 021, 022, 023, 101, 102, 103, 105, 106, 107, 108, 109, 110, 201, 202, 203, 204, 205, 301, 302, 303, 304, 305, 306, 307, 401, 402, 501, 502, 503, 504, 505, 506, 507, 508, 509, 510, 511, 513, 514, 515, 516, 517, 518, 601, 602, 603, 604, 605, 606, 609, 610, 701, 702, 801, 802, 803, 804, 805,901, 902, 903, 904, 905, 906, 907, 1002, 1003
To:
USNS YUMA (T-EPF 8) PSA/DD MSC FUNDED CAT "A" WIsCAT "A" WORK ITEMS 010, 011, 012, 013, 014, 015, 016, 017, 018, 019, 020, 021, 022, 023, 101, 102, 103, 105, 106, 107, 108, 109, 110, 201, 202, 203, 204, 205, 301, 302, 303, 304, 305, 306, 307, 401, 402, 501, 502, 503, 504, 505, 506, 507, 508, 509, 510, 511, 513, 514, 515, 516, 517, 518, 601, 602, 603, 604, 605, 606, 609, 610, 701, 702, 801, 802, 803, 804,901, 902, 903, 904, 905, 906, 907, 1002, 1003
The following have been modified:
Section B - Supplies or Services and Prices
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0011 $______________
The contractor shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.
CLAUSES INCORPORATED BY FULL TEXT
Section B - Supplies or Services and Prices
PART 1 - THE SCHEDULE
The contractor shall follow the instructions stated below when completing Section B:
CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” Wis.
CLINs 0002 & 0003: Indicate the Fully-Burdended Labor Rate (FBLR) (e.g., General and Administrative (G&A), Profit, Supervision, and/or support functions) and the ODC Profit and G&A rate. These rates will be used in evaluating the contractor’s proposal and shall be the rate for pricing changes negotiated under the H-3 Clause – AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Offerors shall include a fully burdened labor rate to be used in negotiating changes. The rate must include all costs for negotiating changes, including but not limited to, G&A, overhead, profit, etc. The offeror shall insert rates below that it agrees to use in negotiating changes for new or additional work. These rates shall prevail throughout the duration of the contract. The number of man-hours and ODC base are estimates for evaluation purposes and the actual distribution and amounts of man-hours and ODC may be higher or lower than those stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount may be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical Work | ||
| Electronic Work | Shipfitting | ||
| Lagging | Painting | ||
| Boiler making | Pipefitting | ||
| Sheet metal Work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General Labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & Warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded manhour rate and not separately priced.
The rates proposed for profit and G&A on CLIN 0002 and 0003 above shall be the same rates used by the contractor in its responses to the Request For Contract Change Order (CCO) Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs should be included under CLIN 0001.
CLINs 0004 through 0011 – The offeror shall complete CLIN 0004 through 0011 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” WIs.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C-1 GENERAL
1. The Contractor shall prepare for and accomplish the voyage repairs, overhaul, or alterations of the USNS YUMA (T-EPF 8) as specified herein and IAW the Work Item (WI) package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
(b) Ensuring the timely procurement of Contractor-Furnished Material/Contractor-Furnished Property (CFM/CFP) and the timely reporting, receipt, storage, installation, and accountability of Government-Furnished Material/Government-Furnished Property (GFM/GFP) (IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004).
(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the Contract Data Requirements List (CDRL) and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variance based on the Time Phased Sequencing Network (TPSN) submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.
(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and Long Lead Time Material (LLTM) for use in the availabilities from the date of award.
(j) Managing all subcontractors performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR), or International Organization for Standardization (ISO) Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.
This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.
The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:
a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.
b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package
e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards
h. Safety/security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.
j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
· Pier, with services in place in which the CLASS size ship can access and be berthed at
· Structural Shop
· Machine Shop
· Pipe Shop
· Electrical/Electronic Shop
· Carpentry Shop
· Rigging Equipment
· Dry-dock – when required for docking of vessel in performance of the specification
(c) The government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.
C – 2 List of Standard Work Items included for this solicitation:
SECTION 000 GENERAL REQUIREMENTS
| NOT SEPERATELY PRICED (NSP) REQUIREMENTS | Category | |
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP |
| 006 | HEAVY WEATHER PLAN | NSP |
| 007 | COLD WEATHER PLAN | NSP |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP) | NSP |
CATEGORY “A” WORK ITEMS
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | A |
| 011 | FURNISH GENERAL SERVICES | A |
| 012 | TELEPHONE SERVICES | A |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | A |
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | A |
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | A |
| 016 | FIRE PROTECTION AND SHIP’S SAFETY PROGRAM | A |
| 017 | HANDLING SHIP’S STORES | A |
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | A |
| 019 | SHIPBOARD ACCESS AND SECURITY | A |
| 020 | GAS FREE CERTIFICATES | A |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | A |
| 022 | DOCK TRIALS AND SEA TRIAL | A |
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY | A |
CATEGORY “B” WORK ITEMS
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (B) | B |
| 030 | CONTINUATION OF SERVICES (B) | B |
SECTION 100 HULL STRUCTURE
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 101 | INSTALL NAVIGATION RUNNING LIGHTS | 028 | A |
| 102 | MODIFY FORE PEAK STRUCTURE | 072 | A |
| 103 | REPLACE AMR HATCH WITH SCUTTLE | 033 | A |
| 104 | INSTALL NONSKID ON AFT MAIN DECK | N/A | A |
| 105 | STRUCTURAL INSPECTION | N/A | A |
| 106 | DEADWEIGHT SURVEY | N/A | A |
| 107 | INSTALL HULL LEVEL ACCESS CATWALK | 006 | A |
| 108 | STARBOARD MOORING FAIRLEAD | 062 | A |
| 109 | TOW MODIFICATION | 026 | A |
| 110 | BILGE PRESERVATION | N/A | A |
| CATEGORY “B” WORK ITEMS | T-ALT | Category | |
| 111 | HULL CRACK REPAIR IWO MPDE | N/A | B |
| 112 | WELD MISC ALUMINUM STRUCTURE | N/A | B |
SECTION 200 PROPULSION MACHINERY
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 201 | MODIFY FUEL SERVICE SYSTEM | 046 | A |
| 202 | HEAT EXCHANGE CLEANING | N/A | A |
| 203 | REDUCTION GEARS MAINTENANCE | N/A | A |
| 204 | WJ STEERING PANEL SHOCK MOUNTS | 129 | A |
| 205 | GREASE INTERCEPTOR REPLACEMENTS | 105 | A |
SECTION 300 ELECTRICAL
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 301 | ADDITIONAL ELECTRICAL OUTLETS | 004 | A |
| 302 | INSTALL NIGHT OPS LIGHTING IN MISSION BAY | 014 | A |
| 303 | CLEAN SHIP’S SVC SWITCHBOADS AND LOAD CENTERS | N/A | A |
| 304 | FREEZE PROTECTION PIPE HEAT TRACE INSULATION | 069 | A |
| 305 | FREEZE PROTECTION MISSION BAY | 069 | A |
| 306 | 24V BUS LINK ISOLATOR | 052 | A |
| 307 | WJ JUNNCTION BOXES | 099 | A |
SECTION 400 COMMUNICATION AND NAVIGATIONAL AIDS
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 401 | RENEW NAVIBS RADIO SAFETY SURVEY | N/A | A |
| 402 | INSTALL SHIP SECURITY ALERT SYSTEM | 078 | A |
SECTION 500 AUXILIARY SYSTEMS
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 501 | PERFORM ANNUAL STERN RAMP MAINTENANCE | N/A | A |
| 502 | RIDE CONTROL SYSTEM INSPECTION | N/A | A |
| 503 | PERFORM HVAC AND REEFER SYSTEM MAINTENANCE | N/A | A |
| 504 ANNUAL MSD UNITS MAINTENANCE | N/A | A | |
| 505 | ANNUAL SEWAGE PLANT MAINTENANCE | N/A | A |
| 506 | INSTALL CHT AND POTABLE CONNECTIONS AT MISSION BAY | N/A | A |
| 507 | INSTALLATION OF FUEL SENSORS AND TRANSMITTERS | 010 | A |
| 508 | INSTALL FIREMAIN CROSSOVER ISOLATION VALVE | 005 | A |
| 509 | INSTALL SHAFT SEAL FLOW INDICATORS | 022 | A |
| 510 | MODIFY DFM BUNKERING PIPING | 063 | A |
| 511 | INSTALL FIREMAIN COOLING WATER CROSS-OVER | 066 | A |
| 513 | SUPPORT STORE CRANE MODIFICATION AND ANNUAL MAINT | 074 | A |
| 514 | STERN RAMP UPGRADES | 107 A | |
| 515 | REPLACE FIREMAIN CHECK VALVES | 077 | A |
| 516 | OVERHAUL FIRE PUMPS | N/A A | |
| 517 | CHT PIPING MOD | 093 A | |
| 518 | WASTE OIL TRANSFER PUMP STRAINER | 054 A |
SECTION 600 OUTFIT, FURNISHINGS AND HABITABILITY
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 601 | M.E.S. & LIFE RAFT CERTIFICATION | N/A | A |
| 602 | SCBA ANNUAL CERTIFICATION | N/A | A |
| 603 | H.E.F. SYSTEM ANNUAL CERTIFICATION | N/A | A |
| 604 | RESCUE BOAT AND DAVIT ANNUAL INSPECTION | N/A | A |
| 605 | FIREFIGHTING SYSTEM ANNUAL CERTIFICATION | N/A | A |
| 606 | PROVIDE SUPPORT FOR HAB AND GALLEY MODS | 013 | A |
| 609 | INSTALL RESCUE BOAT DAVIT BRACKETS | 091 | A |
| 610 | LIFE VEST ANNUAL SERVICING | N/A | A |
SECTION 700 SPONSOR EQUIPMENT
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 701 | ADAPTIVE FORCE PACKAGE T-SCIF INSTALLATION | 122R | A |
| 702 | AFP ANTENNA INFRASTRUCTURE INSTALLATION | 151R | A |
SECTION 800 HVAC
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 801 | CLEAN GALLEY EXHAUST DUCTS | N/A | A |
| 802 | CLEAN LAUNDRY EXHAUST DUCTS | N/A | A |
| 803 | HVAC SEA WATER STRAINER REPLACEMENT | N/A | A |
| 804 | TOPSIDE DECK COATING | 088 | A |
SECTION 900 DRYDOCK
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 901 | DRYDOCKING AND UNDOCKING VESSEL | N/A | A |
| 902 | RENEW ZINC ANODES | N/A | A |
| 903 | INSPECT SEA VALVES AND SEA CHEST | N/A | A |
| 904 | CATHODIC MONITORING SYSTEM INSPECTION AND MAINT | N/A | A |
| 905 | REMOVE AND INSPECT WATERJET ASSEMBLY | N/A | A |
| 906 | INSPECT AND REPAIR UW HULL COATING | N/A | A |
| 907 | HULL MARKINGS TO SUPPORT UWILD CERTIFICATION | 002 | A |
| CATEGORY “B” WORK ITEMS | T-ALT | Category | |
| 908 | PAINT WATER JET INLET TUNNELS | N/A | B |
| 909 | REPLACE SEA CHEST VALVE FLANGES | N/A | B |
| 910 | REMOVE AND INSPECT PS WATERJETS AND SEAT RINGS | N/A | B |
| 911 | BLAST AND PAINT UW HULL | N/A | B |
SECTION 1000 UNDERWAY REPLENISHMENT GEAR
| CATEGORY “A” WORK ITEMS | T-ALT | Category | |
| 1001 | REPLACE FAS STATION HARDWARE | N/A | A |
| 1002 | WEIGHT TEST FLIGHT DECK NETS | N/A | A |
| 1003 | FAS SP PHONE JUMPER & AMBER LIGHTS | 042 | A |
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .