Q&A #1 _ Solicitation N32205-17-R-4703
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N32205-17-R-4703
QUESTIONS AND ANSWERS #1
The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.
1. Item 011 paragraph/section 7.1.1.1: It is the contractor’s experience that the requirement of +/- 5 volts within 450 volts of shore power is impossible on the USNS Spearhead- Class vessels with a standard 480 volt shore power connection, because the vessel is unable to pull enough load to maintain proper voltage. The contractor would like to request that the general services item be amended to +/- 5% of 450 volts, which will allow for the ship to take standard shore. If not, the item will require the use of a dedicated rental generator to accomplish.
ANSWER: Please provide a portable generator to maintain voltage at 450 +/- 5 volts.
2. Item 205: This item describes the replacement of the Grease Interceptor for the Galley/Scullery drains. However the item itself is the T-SCIF installation. Please clarify if the item title and abstract or the SOW are correct.
ANSWER: WI 205 Statement of Work (SOW) has been modified. Revised WI 205 will be provided via AMRDEC Safe. T-SCIF Installation is addressed under WI 701.
3. Item 107 reference 2.2: Reference provided is 8496409 Rev-. Required reference is 8496409 Rev B. Please provide the reference to be used.
ANSWER: WI 107, paragraph 2.2 does not list drawing number 8496409. Please use the reference drawing provided, MSC Standard Drawing 803-7080803.
4. Item 0507 reference 2.3: The reference drawing provided is 541-8443260 Rev J. The WI reference is 541-8443260 Rev F. Please provide the reference to be used.
ANSWER: Utilize Drawing No. 541-8443260 Rev J.
5. Item 0513 paragraph/section no. 4.0 and 7.4: Paragraphs 4.0 and 7.4 contradict each other. 4.0 states that there is no GFM or GFE, however 7.4 states that the contractor is to replace the existing winch with an owner furnished dual braking winch unit. Please clarify SOW.
ANSWER: GFM is provided through Appleton for the crane modification.
6. Item 0601 paragraph/section no. 7.2.1 and 7.5.3: Is the intent to deploy both MES slides or to deploy only the STBD slide?
ANSWER: The intent is to deploy ONLY the STBD slide.
7. Solicitation N32205-17-R-4703 Section L-5: Request for an extension on ship inspection for subcontractors, original date of ship inspection has past.
ANSWER: Ship check / inspection date has been rescheduled and will take place at Joint Expeditionary Base Little Creek, Norfolk, VA on Friday September 15, 2017 at 0800. Inspection is not mandatory and shall be at the offeror’s expense. Offerors who plan to inspect the vessel must be registered with MSC Norfolk NLT 13 September 2017.
8. Item 0205 paragraph/section no. 2.2.1: Please Provide Enclosure 2.2.1 - 4 Drawer Multi-Lock Shipboard CL 6S Letter Size.
ANSWER: WI 205 SOW has been modified. Revised WI 205 will be provided via AMRDEC Safe.
9. Item 0205 and 0701: Work Items 205 & 701 seems to duplicate work in the same space/location. Can you please confirm if these two items are the same work and if so, which Item will be worked?
ANSWER: WI 205 SOW has been modified. Revised WI 205 will be provided via AMRDEC Safe. T-SCIF Installation is addressed under WI 701.
10. Item 0205: Specification item does not address the installation of a grease interceptor. Please advise.
ANSWER: WI 205 SOW has been modified. Revised WI 205 will be provided via AMRDEC Safe.
File details come from the government source that posted it. Updated .