Attachment_B_-_Basic_Pricing_Data.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Maritime Support Vessel Federal contract opportunity
Solicitation number
N32205-17-R-3520
Issued by
Department of the Navy Military Sealift Command

About this file

ATTACHMENT B - BASIC PRICING DATA

View the file

Other files for this federal contract opportunity

Other files attached to Maritime Support Vessel, newest first.
File Type Posted
17-R-3520_Amendment_0005.docx DOCX document
Attachment_B_-_Basic_Pricing_Data_Rev_1.xlsx XLSX spreadsheet
N3220517R3520_Amend_0004.pdf PDF
Attachment_A_-_GFP_List_Amend_0004.pdf PDF
QA_2017-11-02_Final.pdf PDF
Q&A_10.17.17.docx DOCX document
17-R-3520_Amendment_0003.docx DOCX document
Q&A_10.13.17.docx DOCX document
17-R-3520_Amendment_0002.docx DOCX document
Attachment_A_-_GFP_List_Amend_0002.docx DOCX document
Attachment_E_-_Tech_Eval_Sheet_Amend_0001.xlsx XLSX spreadsheet
Q&A_10.11.17.docx DOCX document
17-R-3520_Amendment_0001.docx DOCX document
Attachment_D_-_DD_254_Continuation_Sheet.docx DOCX document
Attachment_C_-_Crew_Complement.docx DOCX document
Attachment_P_-_PAST_PERFORMANCE.docx DOCX document
N32205-17-R-3520.docx DOCX document
Attachment_G_-_201001475.txt TXT text file
Attachment_D_-_DD_254.pdf PDF
Attachment_F_-SF_LLL.pdf PDF
Attachment_E_-_Tech_Eval_Sheet.xlsx XLSX spreadsheet
Attachment_G_-_201408006.txt TXT text file
Attachment_A_-_GFP_List.DOCX DOCX document
Attachment_G_-_201408015.txt TXT text file
Synopsis_17-R-3520_MSV.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Pricing Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 116 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 5

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 335-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 212 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Fuel Consumption Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-17-R-3520

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below and enter in the corresponding price per metric ton for that fuel type in Column G. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel Type (Specify)Price per Metric TonTotal
NAFuel Underway (10kts transit)65MGO/MDO:709.43$ - 0
Other Fuel Type (if necessary)
NAFuel Underway (7kts OPAREA transit)432MGO/MDO:709.43$ - 0
Other Fuel Type (if necessary)
NAFuel Underway (2 kts OPAREA transit)1642MGO/MDO:709.43$ - 0
Other Fuel Type (if necessary)
NAIn-Port Idle (Auxiliaries only)22MGO/MDO:709.43$ - 0
Other Fuel Type (if necessary)
Total2161
TOTAL:$ - 0
Notes:
Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and appropriate fuel conversion factors.
Net bbls shall be calculated at 60°F for all grades and all engines/auxiliaries utilized while underway over moderate-weather passages at the speeds, ranges and grades indicated.
The rates to be used are as follows:
MGO/MDO:per metric ton$709.43
IFO-180:per metric ton$444.03
IFO-380:per metric ton$440.07
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.51 barrels per metric ton
IFO-180:6.60 barrels per metric ton
IFO-380:6.62 barrels per metric ton

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE
PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSTOTAL PER DIEM/PERIOD
BASE PERIOD$ - 0365$ - 0
OPTION 1$ - 0365$ - 0
OPTION 2$ - 0366$ - 0
OPTION 3$ - 0365$ - 0
OPTION 4$ - 0365$ - 0
Option 5$ - 0335$ - 0
TOTAL EVALUATED FUEL$ - 0

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ - 0

File details come from the government source that posted it. Updated .