Revised WI 116
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 521-8495205_B.pdf | ||
| Request_for_Spec_Clarification-0007.doc | DOC document | |
| MCLEAN_Amndmt_0003_Zip_File.zip | ZIP file | |
| Revised_Solicitation_Amndmt_0002.doc | DOC document | |
| 0416_A_VDR_UPGRADE_G1_to_G4_Amend_1.doc | DOC document | |
| 0313_A_Shipyard_Support_for_UPS_Replacement.doc | DOC document | |
| 0110_A_Anchor_Windlass_Foundation_Mod_Amend_1.docx | DOCX document | |
| N32205_16_R_4306_J A_1.PDF | ||
| MCLEAN_J_Zip.zip | ZIP file | |
| MCLEAN_Solicitation_FY16_ROH_DD.doc | DOC document | |
| MCLEAN_Synopsis.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS WILLIAM MCLEAN
(T-AKE 12)
| HULL STRUCTURE | RFP NO. N32205-16- R-4306 | |
| 27 April 2016 | ||
| ITEM NO. 0116 | Category “A” | MSC/N756/PJR |
PRESERVATION OF HOUSE
1.0 ABSTRACT
1.1 This item describes the requirement to preserve the entire house structure including all vertical ladders, inclined ladders/stairs, ladder grating, handrails, platform/walkway structures, decking, grating, brackets, supports, foundations, piping, louvers, screens, and other appurtenances/attachments.
2.0 REFERENCES
2.1 Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition.
2.2 Steel Structures Painting Council, System and Specifications, Volume 2, Eight Edition.
2.3 SSPC SP11, Power Cleaning to Bare Metal
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity:
3.1.1 Location: Highlight defines house (superstructure)area to be painted.
a. Front of House to Aft Bulkhead of Hanger (Frame 58 to Frame 78)
b. Main Deck to the top of the 07 Level (Port and Starboard of House)including vertical surfaces inboard at UNREP station 7 and 8 Note: Freeboard areas from Main Deck to the top of the 07 Level (Port and Starboard) are covered by Work Item 0906.
| c. | Stack |
| d. | Main Deck to the top of the 07 Level (Aft of House) |
| e. | Main Deck to the top of the 07 Level (Forward of House) |
| f. | Vertical ladders, inclined ladders/stairs, ladder grating, stair wells, vestabules, handrails, platform/walkway structures, lifeboat platforms, decking, overhead, overhang, grating, brackets, supports, hangers, angle iron, channel iron, flat bar, foundations, piping, louvers, screens, and other appurtenances/attachments, etc. |
3.1.2 Quantity:
| House Flats | 46122 | |||
| Grate/Walkways | 2053 | |||
| Grate/Walkways | 2371 | |||
| Grate/Walkways | 3393 | |||
| Walkways | 2222 | |||
| Handrails/stairwells | 5280 | |||
| STBD Stairwell | 2025 | |||
| Grating/Walkway | 1911 | |||
| Stairwell/Vestibule | 1998 | |||
| Piping/Brackets-Est | 2306 |
TOTAL House 69681 sqft.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES
4.1 Government Furnished Equipment (GFE): None
4.2 Government Furnished Material (GFM)
4.2.1 Amercoat 240 (Red Oxide)
4.2.2 Amercoat 240 (Haze Gray)
4.2.3 Amercoat T10 Solvent
4.2.4 Amercoat 65 Solvent
4.2.5 Amershield (Haze Gray)
4.3 Government Furnished Services (GFS)
4.3.1 PPG Paint Representative
5.0 NOTES
5.1 The Contractor and all Subcontractors, regardless of tier, must consult the General Technical Requirements (GTRs) to determine applicability to this work item. In performance of this work item, the Contractor and all Subcontractors must comply with the requirements of all applicable GTRs.
5.2 The Contractor and all Subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item.
5.3 This ship contains High Voltage (HV) electrical systems. The Contractor and all Subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a Contractor or Subcontractor approach, work on, or enter a High Voltage area without proper authorization.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED
7.1 Preservation shall include the entire house structure including all Vertical ladders, inclined ladders/stairs, ladder grating, stair wells, vestabules, handrails, platform/walkway structures, lifeboat platforms, decking, overhead, overhang, grating, brackets, supports, foundations, piping, hangers, louvers, screens, angle iron, channel iron, flat bar, and other appurtenances/attachments, etc.
7.2 Contractor shall remove and re-install all ladders/stairs, handrails, platform/walkway structures, decking, grating, brackets, supports, foundations, piping, louvers, screens, and other appurtenances/attachments to clean and prepare all areas that have surface degradation and require surface preparation and coating/painting.
7.3 Contractor shall provide all scaffolding, crane services, bucket lifts, etc. necessary to perform the following work.
7.4 The Contractor shall erect scaffolding from the Main Deck on the Port and Starboard side, and the main deck and 02 Level forward of the house, where necessary, to the top of the 08 Level.
7.5 Temporarily install and maintain protective coverings on all deckhouse windows and Bridge windows and plug all overboard discharges in way of painting surfaces. Remove coverings upon completion and final acceptance.
7.5.1 Mask all normally unpainted surfaces.
7.5.2 Prior to the start of productive work, protective coverings shall be inspected and approved by the MSC Port Engineer.
7.6 Prior to water jetting, hull markings shall be marked recorded and photographed for reference.The entire house shall be water washed with fresh water using 2,500 to 3,000 PSIG to remove all salt water contamination. Upon completion of water washing a Chloride test shall be performed on a sample area per the PPG Paint Representatives instructions.
7.7 The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.
7.8 If contamination is found, additional tests shall be made to determine the extent of contamination and to prove the success of remediation.
7.9 Contractor shall mechanically clean or abrasive blast all areas of surface degradation to a SSPC SP11 profile, using Reference 2.3 as guidance.
7.10 Surface areas where no evidence of corrosion exist
abrade vertical flat bulkhead surfaces by light sanding and treat surfaces with Prep 88 surface cleaner or substitute approved by the MSC Paint Rep.
7.11 The surfaces shall be inspected and approved by the PPG Paint Representative and the MSCREP prior to the application of each coat of primer or paint.
7.12 Coating Application
7.12.1 No coating shall be applied until the PPG Paint Representative and MSCREP have approved the coating curing time and surface preparation.
7.12.2 All coatings shall be applied in accordance with the manufacturer’s recommendations. This includes temperature, humidity, and cure time limitations.
7.12.3 Primer: Apply the following primer to power tool cleaned surfaces.
| a. | One (1) coat of Amercoat 240, (Red Oxide) at 5-6 mils DFT. |
| b. | One (1) coat of Amercoat 240 (Haze Gray) at 5-6 mils DFT. |
| c. | Grating, screens, and ladders shall have two full coats primer and topcoat. |
7.12.4 Stripe coats shall be applied to all weldments, crevices, corners, edge treads, pitted surfaces, and other areas not conducive to proper coverage. Stripe coats shall extend a minimum of 1” from each edge of the area being stripe coated.
a. One (1) stripe coat “using a brush” of Amercoat 240 (Red Oxide), at 5-6 mils DFT.
b. Use Amercoat T10 solvent only.
7.12.5 Topcoat: Apply one (1) full coat of Amershield (Haze Gray), 3-4 mils DFT once all surfaces have been prepared.
a. Use Amercoat 65 solvent only.
7.13 Manufacturer’s Representative
7.13.1 A Paint Manufacturer’s Technical Representative will be in attendance, on the government’s account, to observe the surface preparation and coating application and to advise the MSCREP of Contractor’s efforts.
8.0 GENERAL REQUIREMENTS: None additional.