RFP-RFQ_QandA__3-Answers.docx

DOCX document 32 KB Posted

Attached to
USNS SUPPLY (T-AOE 6) Emergency Voyage Repair
Solicitation number
N32205-16-R-4206
Issued by

About this file

Responses to Specification and Questions 3

View the file

Other files

File Type Posted
16-R-4206-0005.doc DOC document
16-R-4206-0004.doc DOC document
16-R-4206-0002.doc DOC document
16-R-4206-0003.doc DOC document
RFP-RFQ_QandA__3-Answers.docx DOCX document
RFP-RFQ_QandA__2_-_response.docx DOCX document
16-R-4206-0001_AMENDMENT_0001.doc DOC document
RFP-RFQ_QandA__1.docx DOCX document
J-13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
DD Form 1423-1 SWI-010 Sep12.pdf PDF
DD Form 1423-1 SWI-022 Sep12.pdf PDF
DD Form 1423-1 SWI-008 Sep12.pdf PDF
J - 3 Category B Items - SUPPLY 16-R-4206.xls XLS spreadsheet
DD Form 1423-1 SWI-003 Sep12.pdf PDF
DD Form 1423-1 SWI-013 Sep12.pdf PDF
DD Form 1423-1 SWI-001 14Sep12.pdf PDF
DD Form 1423-1 SWI-017 Sep12.pdf PDF
DD Form 1423-1 SWI-015 Sep2012.pdf PDF
DD Form 1423-1 SWI-023 Sep12.pdf PDF
J - 10 Interport Differential.doc DOC document
J -12 Past Performance Data.doc DOC document
DD Form 1423-1 SWI-011 T-AOE Sep12.pdf PDF
N32205-16-R-4206_SUPPLY_EVR.doc DOC document
DD Form 1423-1 SWI-016 14Sep12.pdf PDF
J - 2 Attachment 16-R-4206 SUPPLY.xlsx XLSX spreadsheet
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
DD Form 1423-1 SWI-006 Sep12.pdf PDF
16-R-4206_Redacted_J A_1.PDF PDF
DD Form 1423-1 SWI-020 14Sep12.pdf PDF
J - 14 Technical Data Non-Disclosure.docx DOCX document
DD Form 1423-1 SWI-007 Sep12.pdf PDF
DD Form 1423-1 SWI-012 Sep12.pdf PDF
DD Form 1423-1 SWI-019 Sep12.pdf PDF
DD Form 1423-1 SWI-024 Sep12.pdf PDF
DD Form 1423-1 SWI-014 Sep12.pdf PDF
DD Form 1423-1 SWI-021 Sep12.pdf PDF
DD Form 1423-1 SWI-004 Sep12.pdf PDF
DD Form 1423-1 SWI-018 Sep12.pdf PDF
J-4 USNS SUPPLY EVR SGFP REPORT.pdf PDF
DD Form 1423-1 SWI-002.pdf PDF
J - 7 MSC Ship Repair Facility Survey.doc DOC document
USNS_SUPPLY_16-R-4206_SYNOPSIS.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

USNS SUPPLY (T-AOE 6) EVR N32205-16-R-4206

QUESTIONS AND ANSWERS #3

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation. (If answer doesn’t change solicitation)

WI 011 FURNISH GENERAL SERVICE (T-AOE)

1. Amendment 0001 provided a revised work item. The revised work item crossed out sixty (60) motors in the list of motors requiring heat lamps identified as Enclosure 2.2.1 and leaving one hundred (100) motors requiring heat lamps. Paragraph 7.1.11.1 allows for one hundred and sixty (160) heat lamps. Please clarify?

ANSWER: The list was cut down to 100

WI 520 REPLACE LUBE OIL STEAM HEATER

2. The work item does not provide sufficient information to estimate what is needed for the fabrication and installation of the foundation for the new GFM heaters. From - Does it require a few pads on the deck? To – Does it require a several hundred pound girder foundation along with a shell access to rig into the space?

The work item does not provide sufficient information to estimate what is needed to plumb the new GFM heaters into the existing pipe system. What pipe size? What pipe material? How much pipe? What pipe fittings? Are any valves required? What type valves?

The work item does not provide sufficient information to estimate what the electrical requirements are for this installation. What type of cable? How much cable?

The work item specifically addresses that the design will not be completed until after the vessel arrives per paragraph 7.6.3.

Please provide direction on what is expected with respect to our bid estimate, given the lack of information provided?The List of Materials in the drawing referenced as paragraph 2.5 identifies (16) line items as GFE – Government Furnished Equipment. Paragraph 4.1 identifies GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES as None. Please clarify?

ANSWER: WI revised and references added to assist contractor in providing quote for install.

A. GFM heaters weigh approx. 150LBs each. Rigging will be down the escape trunk to each main space. Units are 24"Wx24"Lx36"H. Foundation modifications will be limited to modifying currently installed foundation.

B. 7.6.3 Contractor is to supply a working drawing to be approved by MSCREP 10 days. Pipe size and material are listed in the reference drawings for removals, replacement piping will be similar to original install and will be installed as per MSCREP.

C. Cabling is to be ABS approved cable, Cable will be required to support 440VAC and 150amps 3 phase, 4 conductor cable. Also stated in the spec during ship check all information is available and is to be used to create a working drawing.

D. Correct as per section 7.6.3 the contractor is to complete a working drawing using GTR 5 as direction.

E. Question does not apply, there is no reference 2.5 in this work item. There was a question similar to this that related to WI 109 and was answered.

WI 501 PAINT MIXING ROOM VENT MODS – Paragraph 2.1.1

3. Work Item 501 Paint Mixing Room Vent Mods, Reference 2.1.1 MSC DWG 514-8495679 Rev B, Paint Mixing Room Ventilation Mods-HVAC Modification;

On Sheet 4 of 17 for Removals; there are Red X outs for Section 31-D, Section 26-D, and Plan 30-A with a comment on Plan 30-A Ignore this removal. Are we to Ignore Section 31-D, Section 26-D, and Plan 30-A?

On Sheet 6 of 17 for Installation there are Clouded Areas that say Ignore Installation. Are we to ignore the installations even though the materials are still listed in the Bill of Materials?

On Sheet 7 of 17 for Installation there are Clouded Areas same as Sheet 6 of 17. Are we to ignore the installations even though the materials are still listed in the Bill of Materials?

On Sheet 8 of 17 for Installation there is a X out for the whole Drawing. Are we to ignore the installations even though the materials are still listed in the Bill of Materials?

On Sheet 9 of 17 for Installation there is a X out for the whole Drawing.. Are we to ignore the installations even though the materials are still listed in the Bill of Materials?

On Sheet 10 of 17 for Installation there is a X out for Section 80-D, Section 78-D, and Elevation 75-D. Are we to ignore the installations even though the materials are still listed in the Bill of Materials?

On Sheet 11 of 17 for Installation there is a X out for the whole Drawing.. Are we to ignore the installations even though the materials are still listed in the Bill of Materials?

ANSWER:

Are we to Ignore Section 31-D, Section 26-D, and Plan 30-A? Yes

On Sheets 6, 7, 8, 9, 10, and 11 of 17 for Installation there are Clouded Areas same as Sheet 6 of 17. Are we to ignore the installations even though the materials are still listed in the Bill of Materials? Yes; ingnore installation With the exception of the heater which is the subject of a separated question contractor shall quote all material in LOM

WI 505 VENT REPAIR AMR PUMPROOM – Paragraphs 2.1.1 & 2.1.3

4. Work Item 505 Vent Repair, AMR Pumproom, Reference 2.1.1 NAVSEA Drawing 512-6362917, HVAC Drawings, and 2.1.3 NAVSEA Drawing 500-6361985, Composite Arrangement A2-188 1ST Plat-16Ft Flat Fr 105-165 CTR;

Work Item Section 505 Section 7.3 Notes Fabricated duct to be Grade 304 or better stainless steel. Define fabricated duct is it only the rectangular ductwork or rectangular and round? What is the thickness of the Grade 304 Stainless Steel to be?

ANSWER: Change the word fabricated to replaced; replaced section of rectangular duct are to be 20 Gauge, and replaced sections of round duct is to be 24 Gauge.

WI 506 VENT DUCT REPAIR – Paragraph 2.1.1

5. Work Item 506 Vent Duct Repair, Reference 2.1.1 NAVSEA Drawing 500-6361276, Rev E, Composite Arrangement A2-183 01 Lvl, Fr 328-367 CTR;

Work Item Section 506 Section 7.3.4 - Notes All sections shall be Grade 304 or better stainless steel. What is the thickness of the Grade 304 Stainless Steel to be?

Work Item Section 506 Section 7.3.4 a. Notes Renew all effected, disturbed and soiled insulation an lagging. Please advise the insulation and lagging materials?

ANSWER: Thickness shall be a minimum of 0.118”. Insulation shall be installed per 6360816 Rev F supplied for other Specs in this work package

WI 508 02 LEVEL VENT DUCT REPAIR – Paragraphs 2.1.1, 2.1.3 & 2.1.4

6. Work Item 508 02 Level Vent Duct Repair, Reference 2.1.1 NAVSEA Drawing 512-6362917, HVAC Diagram, 2.1.3 NAVSEA Drawing 500-6361295, Comp Arrgmt, 03 Level, Frame 295-359, 2.1.4 NAVSEA Drawing 500-6361296, Comp Arrgmt, 03 Level, Frame 359-435, 2.1.5 NAVSEA Drawing 500-6361297, Comp Arrgmt, 03/04 Level, Frame 435-455

Work Item 508 Section 3.1.1 What is duct size, Material thickness and type?

Work Item 508 Section 3.1.2 What is duct size, Material thickness and type?

Work Item 508 Section 3.1.3 What is Material thickness and type?

Work Item 508 Section 3.1.4 What is Material thickness and type?

Work Item 508 Section 3.1.5 What is Material thickness and type?

Work Item 508 Section 3.1.6 What is Material thickness and type?

Work Item 508 Section 3.1.7 What is duct size, Material thickness and type?

Work Item 508 Section 3.1.8 What is duct size, Material thickness and type?

ANSWER:

WI 0508 updated to provide info on sizes. One additional

Material was specified in para 7.1.2 to be 5/16” thk SSTL, it has been revised to be 11 Gauge SSTL, grade 304 or better.

WI 801 HABITABILITY SPACES VENTILATION SYSTEMS CLEANING – Paragraph 9.0

7. Work Item 801 Section 9.0 Notes Contractor Shall Prove Gaylord Wash Down Systems, Fire Suppression, and Vent Closure Systems are Fully Operational Prior to and After Work is Complete. Do we need to have any of the noted systems certified by Gaylord or Gaylord designated Representative after completion?

ANSWER: The person attesting to the proper operation of the system(s) should be qualified to make the inspection; a technician certified to inspect Gaylord equipment would be acceptable. It is recommended that this check be performed in conjuction with Galley equipment checks

WI 501 PAINT MIXING ROOM VENT MODS – Paragraph 2.1

8. Our vendor has an issue with the Electric Duct Heaters called out for Work Item 501 see as follows:

In Work Item 501 Reference 2.1.1 Drawing MSC DWG 514-8495679 Rev B, Paint Mixing Room Ventilation MODS- HVAC Modification, Section 7.3.3 c. referencing installation of heater.

Reference 2.1.1 Drawing MSC DWG 514-8495679 Rev B, Paint Mixing Room Ventilation MODS- HVAC Modification, Sheet 3 Bill of Materials (BOM) calls out BOM# 7 Qty (1) Heater, Duct Type, Electric, Size 28EH, TY H, 30” x 9 ¼”, 25.5kw, 440v 3PH, Series EP2, Indeeco EH-28H, Explosion Proof. However, please see the below note explaining why Indeeco NO QUOTED the heater. They feel that there is an error in the selection more than likely it is the KW rating for the size of the room.

It appears that someone is confused about what they are asking for. Our vendor has the following questions/comments.

· Mil-Spec heaters size 28EH, Type H are standard HVAC duct type heaters with only a manual reset thermal cutout for control. The heaters are wired to a remote control panel supplied by others (unfortunately) and the remote thermostats is tied into the control circuit in the remote control panel.

· A standard TFZ-28H duct heater per MIL-PRF-22594/MIL-H-22594 is rated at 27.3 kW

· The Mil-Spec heaters are in no way considered Explosion-Proof, not even to EP2 criteria.

We solicited some help from our vendor and using the physical size of a 28H Mil-Duct Heater (30” x 9.25”) and approximately 1100 FPM they can only supply about 4.0 kW in EP2 design. In order to get to about 25 kW within EP2 guidelines they would need approximately 3500 CFM and an open area duct size in the range of 30” x 24”.

Please provide guidance?

ANSWER: Provide statement concerning issue in solicitation. Do not quote heater in proposal. Once final characteristics are known government to issue guidance.

File details come from the government source that posted it. Updated .