RFC-0010_Item_911.pdf

PDF 81 KB Posted

Attached to
USNS GRUMMAN T-AO 195 Regular Overhaul and Dry-Docking (ROH/DD)
Solicitation number
N32205-16-R-4001
Issued by

About this file

RFC-0010 Item 911

View the file

Other files

File Type Posted
N32205-16-R-4001-0009_USNS_GRUMMAN_ROH.pdf PDF
N32205-16-R-4001-0008_USNS_GRUMMAN_ROH.pdf PDF
N32205-16-R-4001_Amendment_0007.pdf PDF
RFC-0011_Item_1004.pdf PDF
N32205-16-R-4001-0006_USNS_GRUMMAN_ROH.pdf PDF
J-2_Category_A_Items_REV_11.05.15.xls XLS spreadsheet
N32205-16-R-4001-0005_USNS_GRUMMAN_ROH.pdf PDF
RFC-0008_Item_514_ _515.pdf PDF
RFC-0006_Item_103.pdf PDF
RFC-0005_Item_508.pdf PDF
RFC-0007_Item_101.pdf PDF
RFC-0009_Item_615.pdf PDF
N32205-16-R-4001-0004_USNS_GRUMMAN_ROH.pdf PDF
RFC-0003_Item_303.pdf PDF
RFC-0004_Item_508.pdf PDF
RFC-0002_ITEM_302.pdf PDF
RFC-0001_Item_021.pdf PDF
N32205-16-R-4001-0003_USNS_GRUMMAN_SOLICITATION.pdf PDF
J-2_Category_A_Items_REV_10.26.15.xls XLS spreadsheet
N32205-16-R-4001-0002.pdf PDF
J-2_Category_A_Items_REVISION_1.xls XLS spreadsheet
N32205-16-R-4001-0001_Amendment_to_RFP.pdf PDF
N32205-16-R-4001USNS_GRUMMAN_ROH-DD_RFP.pdf PDF
J-7_MSC_Ship_Repair_Facility_Survey.pdf PDF
N104-16-R-4001_J A_Redacted.pdf PDF
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.pdf PDF
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-12_Past_Performance_Data.docx DOCX document
J-11_Dry_Dock_Evaluation_Form.docx DOCX document
J-4_GRUMMAN_GFP.pdf PDF
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1_1_2-27-14).pdf PDF
J-10_Interport_Differential.pdf PDF
J-8_Request_for_Spec_Clarification.doc DOC document
J-6_WI_015_CDRL.pdf PDF
J-3_CAT_B_ITEMS.xlsx XLSX spreadsheet
J-2_Category_A_Items.xls XLS spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-16-R-4001

USNS GRUMMAN (T-AO 195)

ATTACHMENT J - 8

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.:911

PARAGRAPH / SECTION NO:Various

TITLE: SPUR LINE CUTTERS

QUESTION:

1. Paragraphs 4.2 – 4.2.2 lists Spurs cutter and rope guard anodes as Government

Furnished Material (GFM). Paragraph 7.3.1 states to furnish new line cutter system identified in paragraph 3.2.1 and install the new system in accordance with reference 2.1.2. Are the Spurs cutter systems GFM? Are the anodes GFM?

What paragraph installs the anodes? There is no paragraph 2.1.2?

2. Paragraph 7.2 has a note that the removal of the rope guards is addressed in paragraph 7.3.3 of work item 910, Stern Tube Seal Maintenance. Work item 910 is titled Stern Tube Seal Replacement and paragraph 7.3.3 does not address rope guard removal?

3. Paragraph 7.6.1 refers to reference 2.1.1 and 2.1.2. Reference 2.1.2 was not identified or provided?

4. Paragraph 7.6.2 requires “as built” drawings reflecting modifications and installations. Are there modifications to be accomplished that are not addressed in the work item?

ANSWER:

1. Paragraphs 4.2 – 4.2.2 Spur line cutters were incorrectly listed Government

Furnished Material (GFM) and should have been identified as Contractor

Furnished Material (CFM). Line Item 7.3.1 stands to furnish and install new spur line cutters. Work item also incorrectly make reference to paragraph 2.1.2. Please ignore. There is no paragraph 2.1.2. Replacing of anodes is covered in “B Item

913 Zinc Anodes.

2. Paragraph 7.2 incorrectly references removal of rope guards as covered in Work

Item 910. Removal of rope guards is more accurately covered in paragraph 7.3.2

N32205-16-R-4001

USNS GRUMMAN (T-AO 195)

ATTACHMENT J - 8

of Work Item 909 “CPP SYSTEM CHECKS AND 15 YEARS TAILSHAFT

INSPECTION (ABS, USCG)”

7.3.2 Under contractor furnished manufacturer rep's instruction, follow the detailed procedures as listed and stated in References 2.1 through 2.4 applicable to T-

AO 187 class to draw port and starboard side propellers, tail shafts and stern tube shafts for inspection and examination by ABS and USCG.

Reference 2.2 NAVSEA Drawing No. 243-6240999, “Propulsion Shafting

Handling Procedure” more accurately provides details in the “Procedures” section on removal and re-installation of Rope Guards.

3. Work item also incorrectly make reference to paragraph 2.1.2. Please ignore.

There is no paragraph 2.1.2.

4. There are no anticipated modifications to be accomplished.