RFC-0004_Item_508.pdf

PDF 76 KB Posted

Attached to
USNS GRUMMAN T-AO 195 Regular Overhaul and Dry-Docking (ROH/DD)
Solicitation number
N32205-16-R-4001
Issued by

About this file

RFC-0004

View the file

Other files

File Type Posted
N32205-16-R-4001-0009_USNS_GRUMMAN_ROH.pdf PDF
N32205-16-R-4001-0008_USNS_GRUMMAN_ROH.pdf PDF
N32205-16-R-4001_Amendment_0007.pdf PDF
RFC-0011_Item_1004.pdf PDF
RFC-0010_Item_911.pdf PDF
N32205-16-R-4001-0006_USNS_GRUMMAN_ROH.pdf PDF
J-2_Category_A_Items_REV_11.05.15.xls XLS spreadsheet
N32205-16-R-4001-0005_USNS_GRUMMAN_ROH.pdf PDF
RFC-0008_Item_514_ _515.pdf PDF
RFC-0006_Item_103.pdf PDF
RFC-0005_Item_508.pdf PDF
RFC-0007_Item_101.pdf PDF
RFC-0009_Item_615.pdf PDF
N32205-16-R-4001-0004_USNS_GRUMMAN_ROH.pdf PDF
RFC-0003_Item_303.pdf PDF
RFC-0002_ITEM_302.pdf PDF
RFC-0001_Item_021.pdf PDF
N32205-16-R-4001-0003_USNS_GRUMMAN_SOLICITATION.pdf PDF
J-2_Category_A_Items_REV_10.26.15.xls XLS spreadsheet
N32205-16-R-4001-0002.pdf PDF
J-2_Category_A_Items_REVISION_1.xls XLS spreadsheet
N32205-16-R-4001-0001_Amendment_to_RFP.pdf PDF
N32205-16-R-4001USNS_GRUMMAN_ROH-DD_RFP.pdf PDF
J-7_MSC_Ship_Repair_Facility_Survey.pdf PDF
N104-16-R-4001_J A_Redacted.pdf PDF
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.pdf PDF
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-12_Past_Performance_Data.docx DOCX document
J-11_Dry_Dock_Evaluation_Form.docx DOCX document
J-4_GRUMMAN_GFP.pdf PDF
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1_1_2-27-14).pdf PDF
J-10_Interport_Differential.pdf PDF
J-8_Request_for_Spec_Clarification.doc DOC document
J-6_WI_015_CDRL.pdf PDF
J-3_CAT_B_ITEMS.xlsx XLSX spreadsheet
J-2_Category_A_Items.xls XLS spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-16-R-4001

USNS GRUMMAN (T-AO 195)

ATTACHMENT J - 8

REQUEST FOR SPECIFICATION CLARIFICATION

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.:508

PARAGRAPH / SECTION NO:7.3.1 e.

TITLE: REPLACE ZONE 3 AFF PIPING REPLACEMENT, REV 1

QUESTION:

The paragraph identified above states to remove and replace with new 200 feet of 8” piping and directs you to reference 2.1.1 (NAVSEA Drawings #555-6241219 Foam

System Diagram) “page 6 plan view 22A”. There is no plan view 22A on sheet 6 nor on any other page or sheet of the provided drawing reference. Please clarify?

In addition, the enclosure provided that is identified as a list of contractor furnished material has no pipe or fitting listed that are 8”. Please clarify?

ANSWER:

Reference 2.1.1 is NAVSEA Drawing # 555-6241210 rev G ‘Foam System Diagram’ not

6241219. The Enclosure identifying CFM for Zone 3 mistakenly omitted the 8” pipe.

This material is to be bid as written in 7.3.1.e as CFM and is Seamless Carbon Steel, ASTM A-106, Grade B, Extra Heavy pipe.

Paragraph 7.3.1 e is in error & should read:

“Remove and replace with new 100 feet of 8” Zone 3 piping between frames 60 to approx. frame 54. See reference 2.1.1, Page 6, Partial Plan View 45-D. All piping material specifications are identified in Ref. 2.1.1”

File details come from the government source that posted it. Updated .