J-2_Category_A_Items_REVISION_1.xls

XLS spreadsheet 68 KB Posted

Attached to
USNS GRUMMAN T-AO 195 Regular Overhaul and Dry-Docking (ROH/DD)
Solicitation number
N32205-16-R-4001
Issued by

About this file

Category A Work Items-Revision 1

View the file

Other files

File Type Posted
N32205-16-R-4001-0009_USNS_GRUMMAN_ROH.pdf PDF
N32205-16-R-4001-0008_USNS_GRUMMAN_ROH.pdf PDF
N32205-16-R-4001_Amendment_0007.pdf PDF
RFC-0011_Item_1004.pdf PDF
RFC-0010_Item_911.pdf PDF
N32205-16-R-4001-0006_USNS_GRUMMAN_ROH.pdf PDF
J-2_Category_A_Items_REV_11.05.15.xls XLS spreadsheet
N32205-16-R-4001-0005_USNS_GRUMMAN_ROH.pdf PDF
RFC-0008_Item_514_ _515.pdf PDF
RFC-0006_Item_103.pdf PDF
RFC-0005_Item_508.pdf PDF
RFC-0007_Item_101.pdf PDF
RFC-0009_Item_615.pdf PDF
N32205-16-R-4001-0004_USNS_GRUMMAN_ROH.pdf PDF
RFC-0003_Item_303.pdf PDF
RFC-0004_Item_508.pdf PDF
RFC-0002_ITEM_302.pdf PDF
RFC-0001_Item_021.pdf PDF
N32205-16-R-4001-0003_USNS_GRUMMAN_SOLICITATION.pdf PDF
J-2_Category_A_Items_REV_10.26.15.xls XLS spreadsheet
N32205-16-R-4001-0002.pdf PDF
N32205-16-R-4001-0001_Amendment_to_RFP.pdf PDF
N32205-16-R-4001USNS_GRUMMAN_ROH-DD_RFP.pdf PDF
J-7_MSC_Ship_Repair_Facility_Survey.pdf PDF
N104-16-R-4001_J A_Redacted.pdf PDF
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.pdf PDF
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-12_Past_Performance_Data.docx DOCX document
J-11_Dry_Dock_Evaluation_Form.docx DOCX document
J-4_GRUMMAN_GFP.pdf PDF
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1_1_2-27-14).pdf PDF
J-10_Interport_Differential.pdf PDF
J-8_Request_for_Spec_Clarification.doc DOC document
J-6_WI_015_CDRL.pdf PDF
J-3_CAT_B_ITEMS.xlsx XLSX spreadsheet
J-2_Category_A_Items.xls XLS spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS- 0$ - 0$0
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVES- 0$ - 0$0
003APPROACH, BERTH, AND MOORING REQUIREMENTS- 0$ - 0$0
004TESTING AND QUALITY ASSURANCE- 0$ - 0$0
005ELECTRICAL SAFETY PROCEDURES REQUIREMENTS- 0$ - 0$0
006HEAVY WEATHER PLAN- 0$ - 0$0
007COLD WEATHER PLAN- 0$ - 0$0
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM- 0$ - 0$0
011FURNISH GENERAL SERVICES (T-AO)- 0$ - 0$0
012TELEPHONE SERVICES- 0$ - 0$0
013PROJECT PLANNING & PRODUCTION STATUS MONITORING REPORTS- 0$ - 0$0
014PREPARATION OF WEIGHT AND MOMENT REPORT- 0$ - 0$0
015INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS- 0$ - 0$0
016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM- 0$ - 0$0
017HANDLING SHIP'S STORES- 0$ - 0$0
018DELIVERY AND REDELIVERY OF VESSEL- 0$ - 0$0
019SHIPBOARD ACCESS AND SECURITY- 0$ - 0$0
020GAS FREE CERTIFICATES- 0$ - 0$0
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES- 0$ - 0$0
022DOCK TRIALS AND SEA TRIALS- 0$ - 0$0
023HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY- 0$ - 0$0
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY- 0$ - 0$0
SUBTOTAL 000 - 099- 0$ - 0$0
100HULL STRUCTURES
101Steel, Fr. 60 Roller Curtain Door Trough Covers & Preservation$ - 0$0
102Steel, RAS & FAS Kingpost Brackets (T-ALT 0819)$ - 0$0
103Preservation, JP5 Pump Room Bilge and Tank Tops (VR13-083)$ - 0$0
104Preservation, Ships Potable Water Tanks$ - 0$0
105Preservation, Tank Deck Overhead (Fr 55-60)$ - 0$0
106Preservation Non Skid FR 33-45 Starboard Side$ - 0$0
110Preservation, Aft House Ladders$ - 0$0
112Preservation, Cargo Tanks 5 P/S and 3C$ - 0$0
SUBTOTAL 100 - 199- 0$ - 0$0
200MAIN PROPULSION
201Port Main Engine 12K Hour Overhaul- 0$ - 0$0
202Port PTO Coupling Overhaul- 0$ - 0$0
SUBTOTAL 200 - 299- 0$ - 0$0
300ELECTRICAL
301Annual, Cleaning of Switchboard & Motor Controllers- 0$ - 0$0
302Annual, Circuit Breaker Maintenance & Repairs- 0$ - 0$0
303AC Motors (Various)- 0$ - 0$0
304Cargo System Wire Replacement- 0$ - 0$0
305Cargo Console System Mechanical Support- 0$ - 0$0
306Cargo Console System Painting- 0$ - 0$0
307Cargo Console System, Installation- 0$ - 0$0
SUBTOTAL 300 - 399- 0$ - 0$0
400COMMUNICATION & NAVIGATION
401Annual, SVDR Recertification (ABS)- 0$ - 0$0
402Annual, Magnetic Compass Inspection and Alignment (ABS)- 0$ - 0$0
403Annual, GMDSS Recertification (ABS)- 0$ - 0$0
404Annual, DTS Service- 0$ - 0$0
405Annual, ECDIS & Radar Service (ABS)- 0$ - 0$0
406Annual, Navigat X Gyro System PM- 0$ - 0$0
407Annual, GPETE Calibration- 0$ - 0$0
408Annual, Doppler Speed Log Maintenance- 0$ - 0$0
409Annual, Fathometer Dual Transducer Maintenance- 0$ - 0$0
SUBTOTAL 400 - 499- 0$ - 0$0
500MACHINERY, AUXILIARY SYSTEMS
501Annual, Oil Content Monitors Recalibration (ABS)- 0$ - 0$0
502Annual, Incinerator Service (ABS)- 0$ - 0$0
503Annual, Auxiliary Boiler PM (ABS)- 0$ - 0$0
504Inspection and Overhaul of Tank Vent Valves (ABS)- 0$ - 0$0
505Annual, Piping & Waster Pieces- 0$ - 0$0
506No. 4 SSDG 50K Overhaul- 0$ - 0$0
507No 2. UNREP HP Compressor, Overhaul (VR12-047)- 0$ - 0$0
508AFFF Piping, Zone 3- 0$ - 0$0
509AC Chillers, No 1 and 3, Replace- 0$ - 0$0
510No. 3 & 4 SSDG Turbochanger Overhauls- 0$ - 0$0
511Misc Pump Overhauls- 0$ - 0$0
512INSTALL NEW LATHE- 0$ - 0$0
513INSTALL NEW MILLING MACHINE,- 0$ - 0$0
514INSTALL NEW EVAPORATORS (T-ALT)- 0$ - 0$0
515INSTALL NEW LO PURIFIERS (T-ALT)- 0$ - 0$0
516Biennial, Unfired Pressure Vessels & Relief Valves- 0$ - 0$0
SUBTOTAL 500 - 599- 0$ - 0$0
600OUTFIT, FURNISHINGS AND HABITABILITY
601Annual, Lifeboat Davit Inspections (ABS)- 0$ - 0$0
602Annual, Port RHIB Davit and Winch Inspections (ABS)- 0$ - 0$0
603Annual, Elevator Recertification (ABS)- 0$ - 0$0
604Annual, RHIBs Insp, Service & Repairs (ABS)- 0$ - 0$0
605Annual, Lifeboats Inspections & New Hooks (ABS)- 0$ - 0$0
606Annual, Life Raft Recertification (ABS)- 0$ - 0$0
607Annual, SCBA Compressor, Service (ABS)- 0$ - 0$0
608Annual, SCBA Equipment, Inspections- 0$ - 0$0
609Annual, Domestic Reefer Box Cleaning- 0$ - 0$0
610Annual, SR Decking & Bulkhead (VR15-00X)- 0$ - 0$0
611Annual, Galley Equipment Service- 0$ - 0$0
612Annual, Overhaul of Fire Fighting Equipment (ABS)- 0$ - 0$0
613MSD Room Decking- 0$ - 0$0
615Annual. Stbd RHIB Davit Recert & Davit Steel Repairs- 0$ - 0$0
616Annual Inspection of of Fire and AFFF Hoses- 0$ - 0$0
617Accom Ladders Tests and Winch Replacements- 0$ - 0$0
620Engine Room ERC AC UNITS, Replace- 0$ - 0$0
SUBTOTAL 600 - 699- 0$ - 0$0
800HEATING, VENTILATION, & AIR CONDITIONING
801Annual, Galley Ventilation and Gaylord Hood Cleaning- 0$ - 0$0
802Annual, Laundry Vent Cleaning- 0$ - 0$0
SUBTOTAL 800 - 899- 0$ - 0$0
900DRY DOCKING
901Dry-Docking and Undocking Vessel- 0$ - 0$0
902Underwater Hull & Freeboard Preservation- 0$ - 0$0
903Preservation, Anchors, Chains and Chain Locker- 0$ - 0$0
904Overhauling Sea Valves (ABS)- 0$ - 0$0
905Marine Growth Inhibit Anode Replacement- 0$ - 0$0
906Rudder and Stern Frame Inspections (ABS, USCG)- 0$ - 0$0
907Bilge Keel Cleaning, Preservation and Inspection- 0$ - 0$0
908Cathodic Protection System Maintenance- 0$ - 0$0
909CPP System Checks and 15 Year Tailshaft Inspection- 0$ - 0$0
910Stern Tube Seal Maintenance- 0$ - 0$0
911Spur Line & Net Cutters, Replace- 0$ - 0$0
915UT READINGS / HULL SURVEY- 0$ - 0$0
SUBTOTAL 900 - 999- 0$ - 0$0
1000UNREP GEAR
1001ASD Shrouds, Fabricate & Replace- 0$ - 0$0
1002Winch Foundations, UT Readings- 0$ - 0$0
1003Preservation, Ram Tensioner Sheave Blocks- 0$ - 0$0
1004HP Air Flasks, Relief Valves- 0$ - 0$0
1006Saddle Winch Refurbishment- 0$ - 0$0
1007Replen Pump Motor Bearings, Sta 4 High Line & 8 Spanwire- 0$ - 0$0
1011Preservation, Under Winch Booth- 0$ - 0$0
SUBTOTAL 1000 - 1099- 0$ - 0$0
Total Cat "A"- 0$ - 0$0

&LUSNS GRUMMAN (T-AO 195)&CCONTRACTOR PRICE BREAKDOWN

&"Arial,Bold"CATEGORY "A" ITEMS&RN40442-16-R-4001

&CATTACHMENT J-2

File details come from the government source that posted it. Updated .