N32205-15-R-1007
USNS LARAMIE (T-AO 203)
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR: ___ _____________ __
SPECIFICATION ITEM NO.: __1003_________________
PARAGRAPH / SECTION NO:_7.3.8_________ ___ ___
TITLE: _STA 8 SADDLE WINCH GEARBOX REPAIR___ _
QUESTION:
Paragraph 7.3.8 states “…If welding will not bring shaft into correct tolerances. Manufacture new shaft in accordance with reference 2.2.”.
Is the intent for cost of manufacturing a new shaft to be covered on a change order?
ANSWER:
Yes. If a new shaft is required to be manufactured, that will be covered under a Change Order.
ATTACHMENT J - 8