N32205-15-R-1007
USNS LARAMIE (T-AO 203)
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR: ___ _____________ __
SPECIFICATION ITEM NO.: __803_________________
PARAGRAPH / SECTION NO:_7.3_________ ___ ___
TITLE: ___06 LVL AIR HANDLER REPAIRS____ __
QUESTION:
Paragraph 7.3 states “Contractor is to prep (to SSPC-SP-11) and paint the interior surfaces of the air handlers in paragraph 3.0 prior to installing new insulation”.
Is the intent to paint the interior surfaces of the air handlers or paint the exterior surfaces of the air handlers under the insulation?
ANSWER:
SURFACE PREP AND PAINT THE INTERIOR OF THE AIR HANDLER AFTER INSULATION HAS BEEN REMOVED, PRIOR TO INSTALLATION OF THE NEW EQUIVALENT OR HIGHER GRADE ACOUSTIC INSULATION.