N32205-13-R-3017_Amendment_0005.doc

DOC document 81 KB Posted

Attached to
USNS CARL BRASHEAR (T-AKE 7) Regular Schedule Overhaul/Dry-Docking
Solicitation number
N32205-13-R-3017
Issued by

About this file

Amendment 0005 for ROH/DD of the USNS CARL BRASHEAR

View the file

Other files

File Type Posted
CLARIFICATION_QUESTION-RESPONSE-4.docx DOCX document
N32205-13-R-3017-0004.doc DOC document
N32205-13-R-3017-0003.doc DOC document
N32205-13-R-3017-0002.doc DOC document
0909_A_RENEW_MGCC_ANODES_rev.docx DOCX document
0903_A_Polish_Bow_Thruster_Propeller.doc DOC document
CLARIFICATION_QUESTION-RESPONSE-3.docx DOCX document
CLARIFICATION_QUESTION-RESPONSE-2.docx DOCX document
N32205-13-R-3017-0001.doc DOC document
CLARIFICATION_QUESTION-RESPONSE.docx DOCX document
J-ATTACHMENTS.zip ZIP file
N32205-13-R-3017.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C-1

GENERAL

The Contractor shall prepare for and accomplish the voyage repairs, overhaul, or alterations of the USNS CARL BRASHEAR (T-AKE 7) as specified herein and in accordance with the Work Package as provided in Attachment J-1.

1.

Eligible contractors must be capable of performing the full scope of the solicitation within their own facilities, utilizing their own shops and work force or be capable of subcontracting for these elements beyond their managerial, technical, or physical capability or capacity. Contractors must assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

2.

Eligible contractors must be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, MSRA, ABR, or ISO Certifications that would further emphasize the contractor's ability to perform the work. To be determined responsible, a prospective contractor must submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award. The contractors' proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess a Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR) or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.

This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.

The contractors’ proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:

a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.

b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package

e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards

h. Safety/security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.

j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place in which the CLASS size ship can access and be berthed at

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

4.

The government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been modified:

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the ``Web Based Training'' link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

INVOICE

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

GOVERNMENT

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official

N32205

Issue By

Admin

Inspect By

Ship To Code

N62387

Ship From Code

Mark For Code

Service Approver

Service Acceptor

Accept at Other

LPO

DCAA Auditor

Other

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the ``Send Additional Email Notifications'' field of WAWF once a document is submitted in the system.

NOT APPLICABLE

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

MSCHQ_WAWF@navy.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, "Leave Blank."

In some situations the WAWF system will pre-populate the "Pay DoDAAC," "Admin By DoDAAC" and "Issue By DoDAAC." The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the "Inspection" and "Acceptance" defaults of "destination" for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the "Send More Email Notifications" link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact's (TPOC) or Contracting Officer's Representative's (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

INVOICE REQUIREMENTS/REPORT OF EXPENDITURES

1. Invoices must be sent to MSC for certification and authorization for payment. Bi-weekly progress and final payment invoices for value of progress (less 10% except for final invoice (5% for small business)) must be signed by Contractor Project Manager and authenticated by MSC Principal Port Engineer and On Scene Administrative Contracting Officer prior to submission for payment. MSC Accounts Payable shall pay invoice within thirty (30) calendar days of receipt of authenticated invoice.

2. At a minimum, the following information must appear on the face of each invoice:

a.

Invoice Number (No more than 18 alpha numeric characters) b.

Invoice date (format MM/DD/YYYY) c.

Contract Number d.

Vessel Name e.

Port (if applicable) f.

Vessel Status (FOS, RAV, ROS) g.

Vessel Project Number h.

Vessel Task Number

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

252.217-7004
Job Orders and Compensation
MAY 2006
252.217-7010
Performance
JUL 2009

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS

The following have been modified:

L-4

NOTICE TO OFFERORS (FEB 2000)

(a) Sealed proposals will be received at the Contracting Office and will be opened at the hour and at the date specified in the solicitation for the performance of the work specified in the solicitation and in accordance with the terms of the Master Agreement for Repair and Alteration of Vessels, as amended through the date of this Solicitation.

(b) Any drawings and specifications referenced in this solicitation are an integral part of the solicitation.

(c) The work shall be completed on or before close of business on the completion date of the period indicated in Section F.

(d) Liquidated damages as specified in Section F shall be payable by the Contractor to the Government in accordance with FAR Clause 52.211-11.

(e) In submitting a solicitation response for Ship Repair, a vendor must cite the above solicitation number and each amendment thereto, if any, and must respond to each certification in this solicitation.

(f) The Government cannot guarantee that an application for a security clearance (if required) can be processed in the time between the closing and the time of award.

L-5 INSPECTION OF VESSEL / PRE-PROPOSAL CONFERENCE -

Inspection for the USNS CARL BRASHEAR will take place at Everett, WA on 25 April 2013 at 0900. Inspection is not mandatory and shall be at the offeror’s expense.

All offerors who plan to inspect the vessel must be registered with MSC NLT 19 April 2013. Participants shall be required to fax the following information on company letterhead prior to the deadline: Name of each individual who will be attending, Social Security Number, Date of Birth, Place of Birth, Citizenship and clearance level (if any) showing the granting agency and date of clearance. Offerors must provide a list of specific attendees only. DO NOT SUBMIT “BLANKET” LISTS. The request should state that the individual will be attending a shipcheck for USNS CARL BRASHEAR. The information must be provided to Doug Jones via facsimile transmission to (757) 443-5982 or via E-mail douglas.jones3@navy.mil. Personnel who fail to pre-register will, at best, experience protracted delays in accessing the vessel. A second inspection will NOT be scheduled.

L-6 SHIP & BASE ACCESS (SEP 2011)

Vendors are responsible for correctly submitting forms/applications. Vendors are encouraged to monitor email using “Request a Read Receipt” function and to confirm receipt of facsimile transmissions.

Due to enhanced security measures, ship and base access is required for pre-award ship visits (e.g. ship-check) and for contract performance. Specifically the following permissions are required:

1. El Paso Intelligence Center (EPIC) personnel screening requirement

2. Base/Repair Facility Access Request

3. Vehicle Access Request

4. Ship Access List (vendor-provided)

All forms are available for download on the MSC contracts webpage at http://www.msc.navy.mil. Click on “Contracts” in the upper right corner. “EPIC template” is under “Reference” subheading. Click on “Online Library of Common Documents” for all other forms.

1. EPIC: Required for access to MSC vessels. Complete EPIC form strictly adhering to format requirements and forward to (CONUS East Coast repairs) MSC(underscore)EPIC(underscore)EAST@navy.mil and (CONUS West Coast and HI repairs) MSC.SSUSD.EPIC@NAVY.MIL. EPIC personnel screening requests are desired seven calendar days prior to performance start date. Requests will be managed as expeditiously as circumstances permit. Vendor will be notified by MSC of personnel who are denied access to the vessel.

2. Base/Repair Facility Access: Permit is required to access Navy facilities. Base/Repair Facility Access Request is desired seven days prior to ship check or performance start date. Submit forms per the document instruction and to the Port Engineer. A courtesy copy (CONUS West Coast performance locations only) to Ermanno Magliulo, Engineering Director, at ermanno.magliulo@navy.mil will be appreciated.

RAPIDGate® is being implemented for access to DoD facilities in CONUS, HI, Guam and Puerto Rico. Vendor is responsible to acquire RAPIDGate® status and destination base individual access badge(s) activation prior to performance start date. Delays that may result from inadequate planning are contractor responsibility. Vendor instructions and program information is available at http://www.RAPIDGate.com or tel. 877.727.4342. RAPIDGate® access requires (in succession) (1) Individual Base Commander approval for vendor to access base, (2) Successful vendor RAPIDGate® company annual enrollment, (3) Company employee individual enrollment and possession of RAPIDGate® identification badge for single base or multiple base (enterprise) access. Vendor is responsible to confirm that each employee held annual RAPIDGate® badge is active for the specific facility and performance period in accordance with RAPIDGate® User Agreement (http://www.RAPIDGate.com).

Additional access permissions may be required such as Navy Base Point Loma “Enclave Access request form”.

3. Vehicle Access: Required for vehicle access to Navy facilities. Follow supplemental instructions on Base Access forms or base-specific vehicle access forms.

4. Ship Access List* (Vendor-Provided): On company letterhead attachment via email, the vendor is required to provide the ship master (courtesy copy the Port Engineer) with an accurate, current list of performing personnel prior to being admitted aboard the vessel. Under no circumstances will a hand-delivered list be accepted.

T-AKE email address:

MASTER@AKE#.NAVY.MIL

(example: master@ake8.navy.mil, where “8” is the hull number).

All other hulls address:

MASTER.SHIPNAME@MSC.NAVY.MIL

(example: master.sioux@msc.navy.mil).

*When access to classified information or material may be required please contact Port Engineer for special instructions.

(End of Ship & Base Access template)

L-7 CONTRACTOR ACCESS TO MSC SHIPS

1. El Paso Intelligence Center (EPIC) clearance is required to gain gangway access to all USNS vessels. EPIC clearance is separate from base access.

2. If required for a ship check, or upon receipt of a contract award, the contractor must request an EPIC form from James Phillips via email at: james.b.phillips2@navy.mil. The completed form shall be returned via email.

3. When the EPIC clearance is received, MSC Command Security will promulgate a letter for base access for cleared personnel and forward it to base security.

4. EPIC requests typically require five business days for clearance.

(End of Summary of Changes)