N1048 -Small School Banner-Platinum Specs 9.7.2021 JH.doc

DOC document 25 KB Posted

Attached to
ISAC - School Banners
Solicitation number
22-691ISAC-COLAC-B-25081
Issued by
Illinois

About this file

This document is a specification for a contract to produce 30 Financial Aid Application Completion Small School Banners-Platinum for the Illinois Student Assistance Commission (ISAC). The banners are to be 12" x 6" rectangles with a sewn top for a wooden dowel, which is included. The banners are to be printed with the text "2021 Financial Aid Application Completion"-Platinum and the ISAC logo using PMS2925, PMS3025, Rich Black, and Platinum ink on high quality matte white nylon. ISAC will provide the artwork in a high resolution PDF format. The delivery timeframe is 10 days after proof approval, with the proof required within 5 days of receiving the artwork.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements, or other salient information beyond the product specifications and delivery timeline.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION – N1048-Platinum Financial Aid Application Completion Small School Banners-Platinum

QTY:

FORM#

N/A

TITLE:

Financial Aid Application Completion Small School Banner-Platinum

DESC:

12” x 6” rectangle shaped recognition banner with top sewn for wooden dowel, with wooden dowel included

BRAND:

TBD

COLOR:

High quality matte white nylon

INK:

PMS2925, PMS3025, Rich Black and Platinum

IMPRINT:

“2021 Financial Aid Application Completion”-Platinum and ISAC logo

ARTWORK:

ISAC to furnish artwork in high resolution PDF format 2021_small_ school_Banner_platinum.pdf

PROOF

Electronic proof required Email electronic proof to:

Julie Henschel Julie.Henschel@illinois.gov

DEL:

9:00 a.m. – 3:00 p.m. M-F

Proof:

5 days after receipt of artwork

Product:

10 days after proof approval

Revised Spec: Julie Henschel 9/7/2021

File details come from the government source that posted it. Updated .