2.02b_Attachment_1_PWS.pdf

PDF 116 KB Posted

Attached to
Longshoring Services
Solicitation number
N0060418Q4018
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

NAVSUP FLCPH, OCEAN TERMINALS DIVISION

LONGSHORING SERVICES

1. BACKGROUND

1.1. The NAVSUP Fleet Logistics Center Pearl Harbor (FLCPH) provides wide-ranging logistics and supply support services to joint warfighters, allied forces, and coalition partners in the Mid-Pacific and beyond. The Ocean Terminals Division provides a wide range of ocean transportation services to the Department of Defense (DOD) operating forces and provides Longshoring (Stevedoring) services, and container freight station and shipping documentation services. FLCPH’s customer base extends across the joint environment to include all branches of service and defense personnel wherever there is a U.S.

presence in the world.

2. OBJECTIVE/SCOPE

2.1. The objective of this Performance Work Statement (PWS) is to acquire firm fixed priced, non-personal Longshoring services under an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract to support pier operations for the Ocean Terminals Division.

2.2. Services will be ordered upon the execution of Task Orders issued by the Naval Supply Systems Command (NAVSUP) Fleet Logistics Center (FLCPH) Contracting Officers.

2.3. The Contactor shall provide all personnel, equipment, and supervision to provide services in accordance with best commercial practices.

2.3.1. TASK ORDER MANAGEMENT

2.3.1.1. The Contractor shall provide project management services by providing an on-site lead that will provide oversight for all contractor provided services and be the primary point of contact during all aspects of the operations.

2.3.1.2. The Contractor shall provide a primary point-of-contact (POC) for each task order who can address all administrative matters concerning task order services with the Contracting Officer’s Representative (COR). Administrative matters include documentation for base access and invoicing.

2.3.1.3. The Contractor shall have the ability to provide services within twenty (24) hours’ notice of the issuance of the task order award. The COR will notify the Project Manager within twenty-four (24) hours of a change in the period of performance after task order award. Any period of performance change in the task order that would increase cost shall be accomplished via a modification issued by the Contracting Officer.

2.3.1.4. The Contractor shall respond to a request for quote within twenty-four (24) hours and acknowledge their capability to provide the requested services.

2.3.2. OPERATION PLANNING MEETINGS

2.3.2.1. The Contractor shall attend government operational planning meetings (estimated as an initial, mid, and final) to ensure a safe, efficient, and economical operation. These meetings are for the planning of the allocation of labor, reviewing port storage plans, pre-stow plans, and vessel discharge plans. The meetings shall be scheduled with sufficient upfront notice provided to the Contractor.

2.3.3. LONGSHORING SERVICES

2.3.3.1. Vessel Load Services: For Roll on/Roll off (RORO) and Lift on/Lift off (LOLO)

2.3.3.1.1. The Contractor shall move all cargo from its place of rest either by RORO via the vessel ramp or LOLO via the vessel cranes and lash the cargo in its final stow location onboard the vessel per the approved stow plans furnished by the Government. The movement of cargo excludes the driving of military vehicles including aircraft. The loading shall be in accordance with CFR Title 49, parts 100- 185 and the International Maritime Dangerous Goods Code (IMDGC), and the Integrated Computerized Deployment System (ICODES).

2.3.3.1.2. The Contractor shall lash the cargo onto the vessel. Double lashings shall be used for athwart ship stowage.

2.3.3.1.3. The Contractor shall install government furnished tarpaulin covers to cargo for both RORO and LOLO services.

2.3.3.1.4. The Contractor shall report all damages to the cargo and ship immediately to the

COR. A written damage report shall be submitted to the COR no later than the next business day.

2.3.3.1.5. The Contractor shall perform written cargo tallies to identify the type and location of the cargo loaded. This report shall be provided to the COR at the end of the shift.

2.3.3.2. Vessel Discharge Services: For Roll on/Roll off (RORO) and Lift on/Lift off (LOLO)

2.3.3.2.1. The Contractor shall unlash and move cargo from the stowed location to its temporary place of rest either by RORO via the vessel ramp or LOLO via the vessel cranes and onto the mode of surface transport, to include tractor trailers, and guiding vehicles. The movement of cargo excludes driving military vehicles including aircraft discharged from vessels.

2.3.3.2.2. The Contractor shall remove tarpaulin covers from trailers for both RORO and LOLO services.

2.3.3.2.3. The Contractor shall remove and dispose of all debris generated by the operation.

2.3.3.2.4. The Contractor shall store unused dunnage, lashing, and securing material aboard the vessel as instructed by the COR.

2.3.3.2.5. The Contractor shall report all damages to the cargo and ship immediately to the

2.3.3.2.6. The Contractor shall perform written cargo tallies to identify the type and location of

2.3.3.3. Offload of Cargo: Inland Modes of Transportation

2.3.3.3.1. The Contractor shall unsecure and remove cargo from modes of inland transportation to its designated place of rest. This includes the removal and reinstallation of transporter components (i.e., sideboards, rails and tarpaulins).

2.3.3.3.2. The Contractor shall check cargo entering the pier to include secondary loads for data accuracy on Military Shipping Labels (MSL) and all necessary forms and placards, and suitability for multi-modal transport. The Contractor shall notify the COR immediately if the forms and labels are not on the cargo.

2.3.3.3.3. The Contractor shall report all damages to the cargo and ship immediately to the

2.3.3.3.4. The Contractor shall perform written cargo tallies to identify the type and location of

2.3.3.4. Onload of Cargo: Inland Modes of Transportation

2.3.3.4.1. The Contactor shall secure and load cargo to modes of inland transportation from its designated places of rest. This includes the removal and reinstallation of transporter components (i.e., sideboards, rails and tarpaulins).

2.3.3.4.2. The Contractor shall report all damages to the cargo and ship immediately to the

2.3.3.4.3. The Contractor shall perform written cargo tallies to identify the type and location of

2.3.3.5. Yard Management

2.3.3.5.1. The Contractor shall manage the staging yards in accordance with (IAW) yard utilization and vessel pre-stow plans provided by the Government. The Contractor shall segregate cargo IAW staging plans which may require segregating cargo into staging areas (e.g., cargo segregation by type, height, vessel/deck/hold, sensitive items, frustrated cargo, hazardous materials, by port of debarkation, etc.).

2.3.3.5.2. The Contractor shall ensure lane assignment of cargo as it comes into the staging area from an off load or comes into the staging areas onto a surface transport vessel.

2.3.3.5.3. The Contractor shall stage cargo to minimize the amount of time and movements for cargo that is in the staging areas to be sent to the pier.

2.3.3.5.4. The Contractor shall use fire lanes IAW CFR Title 29, Safety and Health Regulations for Longshoring.

2.3.3.5.5. The Contractor shall segregate cargo IAW applicable DOD and all other applicable laws, rules, and regulations.

2.3.3.6. Post Vessel Operations (Vessel Load/Vessel Discharge and Offload/ On Load of Cargo)

2.3.3.6.1. The Contractor and COR shall perform a one hundred percent (100%) in-stow inspection of each hold/deck at the completion of the operation.

2.3.3.6.2. The Contractor shall remove dunnage and lashing gear from the surface mode(s) of transportation and properly secure it in the storage areas or on the vessel as instructed by the COR. Additionally, the Contractor shall ensure work areas where surface modes of transportation were loaded and unloaded are free of wood splinters, nails, lashing gear material and other residue generated during operations.

3. ENVIRONMENTAL CONTROLS

3.1. The Contractor shall comply with all applicable Federal and State of Hawaii environmental laws and regulations, whichever is more stringent, in performing services.

3.2. The Contractor shall notify the COR immediately upon the discovery of any possible contamination or noncompliance with environmental procedures by any activity or source. This includes any leakage or spillage of hazardous substances on the ground or any leakage or spillage that entered the drainage system of the harbor. The Contractor shall have an Environmental Compliance Officer who shall also be notified.

3.3. The Contractor shall coordinate with emergency responders and secure the scene to stop the release, contain the spills, and assist in decontaminating personnel. The Government will request mutual aid from local authorities if required. The Contractor shall assist the Government during any investigation by furnishing an incident report or related documentation to the COR within twenty-four (24) hours.

3.4. The Contractor shall clean up and dispose of hazardous material spills or leakages caused by the Contractor and shall be held liable for all clean-up costs in the event of accidental or deliberate discharge caused by the Contractor.

3.5. The Contractor shall submit a written Emergency Response Plan to the COR after the issuance of a task order and before the start of the period of performance which details handling hazardous substances and spills.

4. SAFETY REQUIREMENTS

4.1. The Contractor shall ensure compliance with all applicable Occupational, Safety, and Health Administration (OSHA), State of Hawaii, and Federal laws, regulations, and policies for all activities related to work accomplishment (including safety, fire, and security laws, regulations, and policies), and enforce the use of personal protective equipment (PPE) and the application of safe Longshoring practices to prevent injuries and material damages. The Contractor is responsible for the safety of their employees during all contractor operations.

4.2. The Contractor shall attend mandatory safety briefings prior to the start of each operation and during shift turnover for all personnel involved in the operation.

4.3. The Government reserves the right to require the Contractor to remove any employee from performance whom the Government deems to be unsafe or in violation of OSHA or Federal laws. The COR will notify the Project Manager immediately upon observing any safety violation.

4.4. In the event of an accident, the Contractor shall record and report to the COR all available facts relating to each instance of injury or incident to a Contractor, Government, or third party personnel. An accident report shall be made orally to the COR within thirty (30) minutes after the Contractor becomes aware of the occurrence, and submitted in writing the next business day to the COR. In all instances where an accident or incident occurs, the Contractor shall work with the COR during any investigation including preparation and submission of reports IAW Federal and State of Hawaii laws, regulations, and policies.

5. SECURITY REQUIREMENTS

5.1. The services performed under this contract are unclassified.

5.2. The Contractor’s personnel are required to possess or obtain a Transportation Workers Identification Card (TWIC) in order to access Commercial Ports. Contractors are not authorized to provide services without a TWIC.

5.3. The Contractor is responsible for obtaining base access to Joint Base Pearl Harbor-Hickam (JBPHH) and must have Defense Bio-metric Identification System (DBIDS) credentials issued by the Nimitz Pass & ID Office. DBIDS is a force protection program designed to manage personnel, property and installation access. The Nimitz Pass & ID office is open 24 hours, seven days a week to accommodate DBIDS requests and is located at 1250 South Drive, Bldg. 3455, outside Nimitz Gate. The Contractor may retrieve fillable forms from www.cnic.navy.mil/om/dbids.html. The Contractor shall submit all forms to the COR within ten (10) working days prior to the period of performance for all individuals to gain access to JBPHH. While the Government shall sponsor the Contractor for base access after award it is the Contractor’s responsibility to obtain the DBIDS credentials.

5.4. The Government may provide day pass sponsorship as requested through the Nimitz Pass & ID Office for any short fused services issued within 24 hours.

5.5. The Contractor shall not allow a person who has been banned or restricted by any authority from the premises to have access to the pier, equipment, or other material related to operations.

5.6. Services will be discontinued per notification by the COR during force protection conditions (FPCON) Charlie and Delta as base access is restricted due to force protection conditions. The contractual operations will resume when the FPCON level is reduced to Level Bravo or lower.

6. CONTRACTOR-FURNISHED ITEMS AND SERVICES

6.1. The Contractor’s personnel shall possess current licenses and certifications and the Contractor shall have the necessary equipment required to conduct Longshoring operations. The Contractor shall be responsible for transporting their equipment within the pier to and from as needed.

6.2. Some pier locations may require the Contractor to provide cranes and material handling equipment (MHE) as well as trucks/chassis to support operations.

6.3. The Contractor shall maintain all equipment in operable condition. All equipment shall, as minimum, meet mechanical inspection standards of OSHA, State of Hawaii, and Federal laws, regulations, and policies, whichever is more stringent. The Contractor shall immediately replace, at their expense, any contractor-furnished equipment as a result of a breakdown. The Contractor will not charge the Government detention time due to a breakdown or any other failure of the Contractor furnished equipment.

7. INCIDENTAL GOVERNMENT FURNISHED ITEMS

7.1. Services rendered and all materials, including records, files, documents, and work papers provided to the Contractor by the Government shall be considered Government property. All information furnished to Contractor shall be FOR OFFICIAL USE ONLY (FOUO). The Contractor is required to be knowledgeable of the Operational Security (OPSEC) Program as information determined as FOUO or included as part of the OPSEC Critical Information List (CIL) is not releasable to the public or other http://www.cnic.navy.mil/om/dbids.html personnel who do not have an official need to know. All information furnished to the Contractor shall be returned at the end of services.

8. DETENTION TIME

8.1. The Contractor shall be reimbursed a pre-negotiated detention rate for work stoppage, or an inability to start services due to causes beyond their control. Examples are breakage of vessel equipment, inclement weather (i.e., unsafe conditions due to torrential rain, limited visibility, lightning, high winds endangering crane operations, etc.), vessel non-readiness, or non-arrival of cargo.

8.1.1. The Contractor shall, without limitation, absorb the cost of the first thirty (30) minutes of detention time.

8.1.2. The Contractor shall provide written documentation of detention time to the COR. The COR shall verify and document all detention time claims at the end of each work shift and provide the documentation to the Contracting Officer. The Contracting Officer will require sufficient documentation from the Contractor, to include the proof of the costs incurred over the thirty (30) minute period, and sufficient information in accordance with the Contract Cost Principles and Procedures in the Federal Acquisition Regulations (FAR) Part 31.

9. CONTRACTOR PERSONNEL REQUIREMENTS

9.1. When performing services associated with this PWS, Contractor personnel shall make clear to all individuals they dealing with that they are Contractor employees and not DOD personnel when working in any situation where their contractor status is not obvious to third parties. Contractor employees shall clearly identify themselves as a Contractor (i.e. company shirt, pin, visible company identification, etc.) in a visible location as to who their employer is, to avoid creating an impression that they are Government officials.

9.2. The Contractor shall not make any commitment which commits the expenditure of US Government resources.

9.3. The Contractor performing services shall be required to comply with all US Navy rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit.

9.4. The Contractor shall not provide personal services. If Contractor employees are directed by any Government employee at any time to perform services not covered under this contract, the Contractor shall immediately notify the COR.

9.5. The Contactor shall have demonstrated experience in managing commercial Longshoring services and provide experienced personnel to handle 24/7 operations if required.

10. PERIOD OF PERFORMANCE

10.1. The contract period of performance will be a twelve (12) month base period and four (4) 12-month option periods. The Contractor shall be required to perform services as issued in the task order to include weekends and holidays, 365 days a year, 24 hours a day.

10.2. The specific performance periods and locations will be defined in the task order.

11. PLACE OF PERFORMANCE

11.1. The primary place of performance is FLC Pearl Harbor, building 9478, Kilo Piers 3, 5, 7, 10, 11 and

Hotel Piers 1, 2, 3, 4, and designated staging areas located on Joint Base Pearl Harbor-Hickam. If travel is required to support operations at places other than the primary place of performance, then the contractor will have an opportunity to quote travel costs per the Joint Travel Regulations (JTR).

11.2. Ocean Terminal’s operational areas of responsibility shall also include all areas and related facilities within the geographical limits within the State of Hawaii. Below is a list of locations of military, commercial, and private port facilities throughout the State of Hawaii where services may be performed. The specific place of performance will be designated in the task order.

• Pearl Harbor Naval Base

• Naval Magazine - West Loch Whiskey 1 thru 5

• Barbers Point Kalealoa Port

• Honolulu Port

• Port Allen (Kauai)

• Nawiliwili (Kauai)

• Kaunakakai (Molokai)

• Kahului (Maui)

• Hilo (Hawaii)

• Kawaihae (Hawaii)

• Kaumalapau (Lanai)

12. PERFORMANCE REQUIREMENTS SUMMARY AND DELIVERABLES

12.1. The Contractor’s performance requirements are summarized into performance objectives and are defined in Table A below. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement.

TABLE A

PERFORMANCE

OBJECTIVE

PARAGRAPH ACCEPTABLE

QUALITY LEVEL

SURVEILLANCE

METHOD

The Contactor shall provide all personnel, equipment, and supervision to provide services in accordance with best commercial practices.

2.3. 100% Compliance COR Inspection

The Contractor shall provide task order management.

2.3.1 99% Compliance COR Inspection

The Contractor shall provide Longshoring services.

2.3.3 100% Compliance COR Inspection

The Contractor shall provide services in compliance with Environmental controls.

3.0 100% Compliance COR Inspection

The Contractor shall provide services in accordance with safety requirements.

4.0 100% Compliance COR Inspection

The Contractor shall provide services in accordance with

5.0 100% Compliance COR Inspection security requirements.

12.2. The Contractor shall provide the following deliverables:

TABLE B

PWS

SECTION

DESCRIPTION FORMAT DISTRIBUTION DUE DATE

2.3.3.1.4 2.3.3.2.5 2.3.3.3.3 2.3.3.4.2

Damage Report.

The report must contain all of the information as stated government format.

Government Provided Format

Send to COR via e-mail

Next Business Day per Task Order

2.3.3.1.5.

2.3.3.2.6 2.3.3.3.4 2.3.3.4.3

Cargo Tally Report.

The report must contain all of the information as stated in the government format.

Government Provided Format

Hand Delivered At the end of the shift per the Task Order

3.5. Emergency

Response Plan.

The plan must contain a process to handle hazardous substances and spills, and the controlling and cleaning of any substance that is not in the water.

Government Approved Contractor Format (Word, PDF, Excel)

Send to COR via email

After issuance of the Task Order and before the start of the Period of Performance

4.4 Accident Report.

The report must contain a narrative containing all available facts relating to the incident or injury.

Government Approved Contractor Format (Word, PDF, Excel)

Send to COR via e-mail.

Next Business Day per Task Order

13. QUALITY ASSURANCE

13.1. The Contractor shall implement a Quality Control Plan (QCP) that identifies, and results in the correction of potential and actual problems to ensure the quality of deliverables and performance. This may require the contractor to attend periodic progress meeting called by the COR and Contracting Officer to address service issues during the period of performance.

13.2. The Government will provide the Contractor with a copy of the Government’s Quality Assurance Surveillance Plan (QASP). The Government’s QASP will evaluate the contractor’s performance under each task order in accordance with the QASP. This plan is primarily focused on what the Government must do to ensure that the contractor has performance in accordance with the performance standards.

14. ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)

14.1. The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Fleet Logistics Center Pearl Harbor via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

• W, Lease/Rental of Equipment;

• X, Lease/Rental of Facilities;

• Y, Construction of Structures and Facilities;

• D, Automatic Data Processing and Telecommunications, IT and Telecom-

Telecommunications Transmission (D304) and Internet (D322) ONLY;

• S, Utilities ONLY;

• V, Freight and Shipping ONLY.

14.2. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.dmdc.osd.mil/Login.aspx.

14.3. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

15. CONTRACTING OFFICER’S REPRESENTATIVE (COR)

15.1. Contracting Officer Representative (COR): A COR will be appointed by a separate letter and identified in the contract award. The letter of appointment issued to the COR will state the responsibilities and limitations of the COR and a copy will be sent to the Contractor.

15.2. Alternate Contracting Officer Representative (ACOR): An ACOR will be appointed by a separate letter and identified in the contract award. A letter of appointment issued to the ACOR will state the responsibilities and limitations of the ACOR. In the absence of the COR, the ACOR is the technical representative of the Contracting Officer in the administration of the contract and can perform the same duties as the COR.

16. APPENDIX

16.1. Appendix A: Applicable Documents/Publication

16.2. Appendix B: Glossary of Terms/Definitions

16.3 Appendix C: Contractor Unclassified Access to Federally Controlled Facilities https://doncmra.dmdc.osd.mil/Login.aspx https://doncmra.nmci.navy.mil/

APPENDIX A – APPLICALBE DOCUMENTS & PUBLICATIONS

FEDERAL AND DEPARTMENT OF DEFENSE REGULATIONS

• Code of Federal Regulations, 29 CFR, Labor, Part 4, Labor Standards for Federal Service Contracts Code of Federal Regulations, 29 CFR, Labor, Part 1910, Occupational Safety & Health

• Code of Federal Regulations, 29 CFR, Labor, Part 1917, Marine Terminals

• Code of Federal Regulations, 29 CFR, Labor, Part 1918, Safety and Health Regulation for Longshoring

Code of Federal Regulations, 40 CFR, Protection of Environment

• Code of Federal Regulations, 46 CFR, Shipping. Part 146

• Code of Federal Regulations, 49 CFR, Transportation, Parts 100-185

• Federal Acquisition Regulation (FAR), Volume I, Parts 1 to 51, September 2001

• Federal Acquisition Regulation (FAR), Volume II, Parts 52, 53, & Index, September 2001 Defense Federal

Acquisition Regulation Supplement (DFARS), 17 August 1998

• DoD Directive 4140.01, DoD Supply Chain Material Management Policy, 14 December 2011 DoD Manual

4140.01-M-1, Compliance for Defense Packaging: Phytosanitary Requirements for Wood Packaging Material (WPM), 7 September 2007

• Defense Transportation Regulation DTR 4500.9-R Part II - Cargo Movement

• Part III - Mobility

• Part V - DoD Customs & Border Clearance Policies & Procedures

• Part VI - Management & Control of Intermodal Containers & System 463L Pallets

• DoD Instruction 5100.76, Safeguarding Conventional Arms, Ammunitions and Explosives (AA+E), 20

May 2010 DoD Manual 5100.76, Physical Security of Sensitive Conventional Arms, Ammunition and Explosives,

• 17 April 2012

• DoD Directive 5200.1-R, Information Security Program Regulation, 14 January 1997 DoD Instruction

6055.04, DoD Traffic Safety Program, 20 April 2009, Ch 1, 2 April 2010

• DoD Instruction 6055.09- STD Ammunition and Explosives Safety Standards, 29 February 2008 Army

Federal Acquisition Regulation Supplement (AFARS)

• AR 5-20, Competitive Sourcing Program, 27 June 2008

• AR 40-5, Preventive Medicine, 25 May 2007

• AR 56-4, Management of Army Intermodal Container Systems, 2 March 2007

• AR 190-11, Physical Security of Arms, Ammunition, and Explosives, 15 November 2006 AR 190-13, Army Physical Security Program, 25 February 2011

• AR 190-45, Law Enforcement Reporting, 30 March 2007.

• AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive), 30 September 1993 AR

200-1, Environmental Protection and Enhancement, 13 December 2007

• AR 380-5, Department of the Army Information Security Program, 29 September 2000 AR 385-10, Army

Safety Program, 23 August 2007

• AR 525-13, Antiterrorism, 11 September 2008

• AR 530-1, Operations Security (OPSEC), 19 April 2007

• AR 600-55, Army Driver and Operator Standardization Program (Selection, Training, Testing, and

Licensing), 18 June 2007

• AR 700-141, Hazardous Material Information System, 13 August 2007

• AR 735-5, Policies and Procedures for Property Accountability, 28 February 2005 DA PAM 5-20, Competitive Sourcing Implementation Instructions, 27 June 2008 DA PAM 385-40, Army Accident Investigations and Reporting, 6 March 2009 DA PAM 385-64, Ammunition and Explosive Safety Standards, 24 May 2011

• DA PAM 385-65, Explosive and Chemical Site Plan Development and Submission, 1 February 2008 DA PAM 700-32, Packaging of Army Material, 15 January 2008

• DA PAM 710-2-1, Using Unit Supply System, 31 December 1997

• SDDC Regulation 15-1, Procedure of Disqualifying and Placing Transportation Service Providers (TSPs) in Non- Use, 10 January 2012

• SDDC Regulation 55-38, Loss and Damage Reporting and Analysis System, 2 April 1990

• SDDC Regulation 55-53, Reporting Ocean Cargo Manifesting Performance (RCS MTMC-IT-12(R2)), 2

April 1990 SDDC Regulation 56-69, Terminal Operations, 5 Aug 1989 w/ch 3, 22 November 1995SDDCR

350-3, MTMC

• Remedial Action Project Program, 8 October 2010

• SDDC Regulation 380-2, SDDC Operations Security (OPSEC) Program, 19 July 2005

• SDDC Regulation 380-5, Military Surface Deployment and Distribution Command (SDDC) Information

Security Program, 26 March 2010

• SDDC Regulation 385-10, Safety Program, 29 March 2005

• SDDC Regulation 715-1, Economy Act Actions and Other Contract Offloads, 16 June 2007 SDDC PAM

55-4, Transportation Service Provider (TSP) Qualifications, 1 December 2008 ATTP 3-39.32, Physical Security, 3 August 2010

• ATTP 4-10, Operational Contract Support Tactics, Techniques & Procedures, 20 June 2011 ATTP 4-15, Army Water Transport Operations, 11 February 2011

• FM 3-35, Army Deployment and Redeployment, 21 April 2010

• FM 5-19, Composite Risk Management, 21 August 2006

• FM 55-30, Army Motor Transport Units and Operations, 27 June 1997 FM 55-60, Army Terminal

Operations, 15 June 1996

• FM 55-80, Army Container Operations, 13 August 1997

• TC 4-13.17, Cargo Specialist’s Handbook, 12 May 2011

• International Maritime Dangerous Goods Code (IMDGC) Regulations, Books 1 thru 3 JP 4-01, Joint

Doctrine for the Defense Transportation System, 19 March 2003

• JP 4-01.2, Sealift Support to Joint Operations, 22 June 2012

• JP 4-01.5, Joint Tactics, Techniques, and Procedures for Transportation Terminal Operations, 9 April 2002

JP 4-09, Distribution Operations, 5 February 2010

• MIL-HDBK-138B, Container Inspections, 1 January 2002

• MIL-STD-129P, Marking for Shipment and Storage w/Change 4, 19 September 2007 SDDC TEA

Pamphlet 55-20, Fourth Edition, Tiedown Handbook for Truck Movements SDDC TEA Pamphlet 55-21, Fourth Edition, Lifting And Tiedown of Helicopters SDDC TEA Pamphlet 55-22, Third Edition, Lashing Handbook for Marine Movements https://www.tea.army.mil/pubs/nr/deploy/fgpamphlets/PAM_55- 22_lashing.pdf

• SDDC TEA Pamphlet 55-22, Third Edition, Lifting Handbook for Marine Movements

• https://www.tea.army.mil/pubs/nr/deploy/fgpamphlets/PAM_55-22_lifting.pdf

• SDDC TEA Pamphlet 55-24, Third Edition, Vehicle Preparation Handbook for Fixed Wing Air

Movements SDDC TEA Pamphlet 55-23, Second Edition, Tiedown Handbook for Containerized Movements, September 2003 TB-43-0142, Safety Inspection and Testing of Lifting Devices, 28 February

• TB 55-46-1, Standard Characteristics for Transportability of Military Vehicles TM 38-410, Storage and Handling of Hazardous Materials, 13 January 1999

• TM 55-607/NAVSEA OP 3221, Loading and Storage of Military Ammunition and Explosives Aboard Breakbulk Merchant Ships, 27 December 1988

• US Department of Transportation, 2012 Edition, Emergency Response Guidebook (ERG)

• International Plant Protection Convention (IPPC), Revision of ISM No. 15, International Standards of

Phytosanitary Measures: Regulation of Wood Packaging Material in International Trade (2009). See:

https://www.ippc.int/file_uploaded/1240490152156_ISPM_15_Revised_2009_E.pdf https://www.tea.army.mil/pubs/nr/deploy/fgpamphlets/PAM_55-22_lashing.pdf https://www.tea.army.mil/pubs/nr/deploy/fgpamphlets/PAM_55-22_lashing.pdf https://www.tea.army.mil/pubs/nr/deploy/fgpamphlets/PAM_55-22_lifting.pdf https://www.ippc.int/file_uploaded/1240490152156_ISPM_15_Revised_2009_E.pdf

APPENDIX B – GLOSSARY OF TERMS & DEFINITIONS

• Athwart Ship - Across the vessel. From side to side; at right angles to the keel.

• Cargo - Material moving within the Defense Transportation System.

• Classified - Official information or matter in any form or of any nature which requires protection in the interest of national security.

• Containers - Cargo containers including military vans (MILVANS) and commercial containers 20 feet in length and greater.

• Container Chassis - The trailer used to carry and transport containers.

• Container Crane - The rail mounted pier crane used to load and discharge containers to and from railroad cars, trucks, and container chassis.

• Contracting Officer - A Government official with authority to enter into, administer, and/or terminate

Government contracts.

• Contracting Officer Representative (COR) - A US Government representative authorized to coordinate services within the scope of the contract.

• Contractor Furnished Equipment - Equipment provided by the contractor for the purposes of conducting work.

• Detention Time - (Sometimes referred to as Standby Time or Waiting Time) is the time lost as a result of a stoppage, or inability to start due to causes beyond the control and without the fault or negligence of the Contractor’s, including but not limited to, a breakdown of the ship’s equipment or Government furnished gear, inclement weather, non-arrival of ship, non-readiness of the ship, non-arrival of cargo, or non-availability of equipment to be furnished by the Government.

• Direct Labor - All of the categories of labor provided for in the man-hour rate schedule of the order.

• Dunnage – Cordwood, planks, or other material used solely to protect goods stowed on a vessel.

• Government Furnished Equipment - The equipment, facilities, and supplies to be furnished by the

Government for contractor use during the performance of this contract

• Hazardous Materials (HAZMAT) – A substance or material that the U.S. Secretary of Transportation has determined is capable of posing an unreasonable risk to health, safety, and property when transported in commerce, and has designated as hazardous under section 5013 of Federal (U.S.) hazardous materials transportation law (49 United States Code 5103). The term includes hazardous substances, hazardous wastes, marine pollutants, elevated temperature materials, materials designated as hazardous in the Hazardous Materials Table (see 49 CFR 172.101), and materials that meet the defining criteria for hazard classes and divisions in part 173 of subchapter C of this chapter.

• Hold - Space below decks used for stowing cargo. More specifically, a space between the lowest deck and the bottom of the ship or tank tops.

• Lashing - Fastening made by passing a rope, cord, or the like around an object or objects to prevent movement in a direction horizontal to the decks.

• Loading - Placing cargo into or onto vessels, railcars, trucks, dromedary boxes or trailers for transport.

Loading Plan - Stowage diagram of cargo loaded in a vessel.

• Long Ton – A weight of 2,240 pounds. Commonly referred to as “weight ton”, “long ton”, or “LT”.

Longshoreman - Usually applied to men employed in the handling of cargo in vessels when loading or unloading. Loss - The act of losing or failing to maintain possession of an item.

• Materiel-Handling Equipment - Mechanical devices for handling of cargo and other items with greater ease and economy, e.g., a forklift.

• Military Surface Deployment and Distribution Command (SDDC). The Army component command of United States Transportation Command that provides cargo, passenger, and personal property traffic management services to all Department of Defense components. The single manager operating agency for military traffic, land transportation, and common user ocean terminals.

• Minimum Time - The time, in addition to the period actually worked, for which the Contractor is required to pay his employees to comply with the minimum time requirements of collective bargaining agreements under which the Contractor is obliged to compensate his employees.

• Onboard - On or in a vessel.

• Performance Requirements Summary - The listing of critical performance indicators, standards, and acceptable quality levels used in evaluating the contractor's performance.

• Pier - Wharf running at an angle with the shoreline that provides berthing spaces on both sides for ships.

• Quality Control Plan - A formal document prepared by the contractor that contains specific performance standards, methods, and frequency of inspections, assignment of responsibility, and manner of record preservation to support the Quality Control Inspection Program.

• Required Delivery Date - A calendar date that specifies when materiel is actually required to be delivered to the requisitioner.

• Revenue Ton - The basis upon which a compensatory reimbursement is calculated for cargo handling.

Commodities payable on a tonnage basis are paid on the basis of a Revenue Ton. For the purposes of payment, a Revenue Ton is the larger of either Measurement Ton or Long Tons for each operation accomplished.

• Segregation (Sorting) of Cargo - The breaking out of discharge cargo and separating or assembling it into piles, bays, bins, or areas, by consignee as shown on the manifests or other documents, or for loading by transportation conveyance.

• Staging Area – A location within the port facility at which cargo is stored in preparation for loading aboard ship (loading); or after discharge, where it is stored awaiting movement to inland destination.

• Stevedore - A person who contracts to load or unload a vessel. Stiffener - Angle bar or stringer fastened to a surface to strengthen it.

APPENDIX C – CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED

FACILITIES

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR

CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES

Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:

• Must be either a United States (U.S.) citizen or a U.S. permanent resident with a minimum of 3 years legal residency in the U.S. (as required by the Deputy Secretary of Defense DTM 08-006 or its subsequent DoD INST) and

• Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the CSR must submit for all employees each of the following:

• SF-85 Questionnaire for Non-Sensitive Positions

• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

• Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed NACI or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM.

Failure to provide the required documentation at least thirty (30) days prior to the individual's start date may result in delaying the individual's start date.

* Consult with your CSM and IA manager for local policy when IT-III (non-sensitive) access is required for non- U.S. citizens outside the U.S..*

1. BACKGROUND
2. OBJECTIVE/SCOPE
2.3.1. TASK ORDER MANAGEMENT
2.3.2. OPERATION PLANNING MEETINGS
2.3.3. LONGSHORING SERVICES
3. ENVIRONMENTAL CONTROLS
4. SAFETY REQUIREMENTS
5. SECURITY REQUIREMENTS
6. CONTRACTOR-FURNISHED ITEMS AND SERVICES
7. INCIDENTAL GOVERNMENT FURNISHED ITEMS
8. DETENTION TIME
9. CONTRACTOR PERSONNEL REQUIREMENTS
10. PERIOD OF PERFORMANCE
11. PLACE OF PERFORMANCE
12. PERFORMANCE REQUIREMENTS SUMMARY AND DELIVERABLES
13. QUALITY ASSURANCE
14. ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)
15. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
16. APPENDIX
APPENDIX A – APPLICALBE DOCUMENTS & PUBLICATIONS
APPENDIX B – GLOSSARY OF TERMS & DEFINITIONS
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES

File details come from the government source that posted it.