Attachment 1 Contract Surveillance Plan.docx

DOCX document 35 KB Posted

Attached to
NAWCAD Structures Division Structural Life Monitoring and Air Vehicle Airworthiness Certification
Solicitation number
N0042124R0042
Issued by

About this file

This document is a Contract Surveillance Plan (CSP) for a non-performance based Indefinite Delivery/Indefinite Quantity (IDIQ) contract with Cost-Plus-Fixed-Fee (CPFF) Contract Line Items (CLINs) and Cost-Reimbursable CLINs for Other Direct Costs (ODCs) with a five-year ordering period. The contract is for engineering and technical support services in the areas of Structural Appraisal of Fatigue Effects (SAFE) program, Strength Engineering, and Loads and Dynamics Engineering for the Air Vehicle Department, Structures Division of the Naval Air Warfare Center, Aircraft Division (NAWCAD). The CSP outlines the authority, scope, government resources, responsibilities, methods of quality assurance surveillance, including use of the Contractor Performance Assessment Report System (CPARS), and documentation requirements. It defines the data reporting standards, CDRL data quality standards, and incentives for meeting acceptable performance levels. The related federal contract opportunity is a formal Request for Proposal (RFP) for these same services and technical areas.

View the file

Other files

File Type Posted
Structures RFP Q A FINAL RFP Amendment 0004.pdf PDF
RFP N0042124R0042-0002.pdf PDF
Structures RFP Q and A FINAL RFP 0003.pdf PDF
N0042124R0042 QA DRAFT RFP.pdf PDF
P7 Fully Burdened Labor Rates_Amendment 0001.xlsx XLSX spreadsheet
Structures RFP Q and A FINAL RFP Amendment 0001.pdf PDF
P4 Composite Labor Rates.xlsx XLSX spreadsheet
RFP_N0042124R0042_Amendment 0001.pdf PDF
P6 Cost Summary Spreadsheet.xls XLS spreadsheet
P5 BLS Labor Rates.xlsx XLSX spreadsheet
RFP_N0042124R0042.pdf PDF
P7 Fully Burdened Labor Rates.xlsx XLSX spreadsheet
Exhibit A CDRLs.pdf PDF
Attachment 2 Data Item Transmittal Form.docx DOCX document
P2 CPAQ.pdf PDF
P1 Past Performance Information.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Surveillance Plan (CSP) For AB22000 Air Vehicle Department Structures Division

1. Purpose

This CSP is a Government developed and applied document used to ensure that systematic quality assurance methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract and Task Orders.

The Air Vehicle Department, Structures Division (AB22000), has a requirement for engineering and technical support services. Specifically, the Division has a need for systems engineering and technical efforts to be performed in the following functional areas: Structural Appraisal of Fatigue Effects (SAFE) program, Strength Engineering, and Loads and Dynamics Engineering. The resultant contract will be a non-performance based Indefinite Delivery/Indefinite Quantity (IDIQ) contract with Cost-Plus-Fixed-Fee (CPFF) Contract Line Items (CLINs) and Cost-Reimbursable CLINs for Other Direct Costs (ODCs) with a five (5) year ordering period. A properly executed CSP will assist the Government in achieving the objective of this procurement and provide the contract with clearly defined performance expectations.

2. Authority

Authority for issuance of this CSP is provided in the contract under Section E, Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation required to be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between quality control and the CSP. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract and Task Orders. The CSP is executed to provide Government surveillance and oversight of the contractor’s efforts to ensure that the efforts are timely, effective and are delivering the results specified in the contract and Task Orders.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer – The individual duly appointed with the authority to enter into (Procuring Contracting Officer - PCO) or administer (Administrative Contracting Officer - ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is Silas Alexander, AIR-2.5.1.5.0. The ACO will be designated in the resulting contract award. Contracting Officers are designated via a written warrant which sets forth limitations of authority.

Contracting Officer’s Representative (COR) – The individual appointed in writing by the PCO to act as the authorized representative to assist in administering the contract. The COR will be designated in the resulting contract and individual Task Orders. The limitations of authority are contained in a written letter of appointment.

5. Responsibilities

The following Government resources shall have responsibility for the implementation of this CSP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contracting Officer’s Representative – The COR is responsible for technical administration of the contract including individual Task Orders and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Technical Point of Contact (TPOC)/Subject Matter Expert is responsible for assisting in administering of specific efforts under the Task Orders. A TPOC cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of Quality Assurance Surveillance

a. Contractor Performance Assessment Report System (CPARS) – The marketplace for engineering and technical support is very competitive. As such, the successful Offeror has a vested interest in the Government-generated CPARS rating under this contract and Task Orders as a substandard rating could have an adverse impact on future proposal evaluations. Additionally, the CPARs ratings will be a determinant in exercising each option period within a Task Order and/or awarding follow-on Task Orders. For this procurement, the Government shall address the quality of the service, schedule, cost control, and management responsiveness. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout DoD, as well as the continuation of this contract tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool.

b. CSP - The below listed methods of surveillance shall be used by the COR and TPOC/Subject Matter Experts in the technical administration of this CSP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein.

7. Surveillance

Enclosures (1) through (3) set forth the standards, surveillance methods, incentives, and definitions for the contractor, the COR and TPOC and Enclosure (4) provides the annual and quarterly checklists which provide a means for the COR to document the results of the surveillance to the Contracting Officer.

The CSP will be provided to the Contracting Officer on an annual basis.

8. Documentation

In addition to providing annual reports to the Contracting Officer, the COR shall maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations and any actions related to the Government’s performance of the quality assurance function, including the original copies of the CSPs. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the Task Order.

9. Enclosures

Enclosure (1) - Data Reporting Standards and CDRL Data Quality Standards Enclosure (2) - Incentives Enclosure (3) - Definitions Enclosure (4) - Surveillance Checklist – Quarterly/Annual

Enclosure (1)

DATA REPORTING STANDARDS

SOW/CDRL Task Description

Standard and Acceptable Quality Level (AQL)
Surveillance

Method/Measure Incentives

SAFE Program support, SOW paragraph 3.1.1, 3.2.1, 3.3.1, 3.4.1

Requirements and objectives met on time, and within budget 95% of the time.
Surveillance by COR, TPOC/subject matter expert feedback.
See Enclosure 2.

Strength Engineering support, SOW paragraph 3.1.2, 3.2.2, 3.3.2, 3.4.2

Requirements and objectives met on time, and within budget 95% of the time.
Surveillance by COR, TPOC/subject matter expert feedback.
See Enclosure 2.

Loads and Dynamics support, SOW paragraph 3.1.3, 3.2.3, 3.3.3, 3.4.3

Requirements and objectives met on time, and within budget 95% of the time.
Surveillance by COR, TPOC/subject matter expert feedback.
See Enclosure 2.

Financial Reports / Submission is in accordance with the DID cited in the CDRLs

Requirements and objectives met on time, and within budget 95% of the time.
Surveillance by COR, TPOC/subject matter expert feedback.
See Enclosure 2.

CDRL DATA QUALITY STANDARDS

Description
Standard
AQL
Surveillance/Method/Measure
Incentives

Technical Report/ Studies, A001 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Technical Report/ Studies, A003 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Technical Report/ Studies, A004 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Technical Report/ Studies, A005 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Computer Software Product End Items, A006 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Non-Disclosure (Company), A007 N/A

Non-Disclosure Agreement (Individual), A008 N/A

Software Product Package (SPP), A009 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Individual Aircraft Tracking System Software, A010 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Software Transition Plan, A011 Submission is in accordance with the Data Item Description (DID) cited in the

CDRL.

95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
Surveillance by

COR, TPOC/subject matter expert feedback See Enclosure 2.

Enclosure (2)

INCENTIVES

The following incentives shall apply to performance under this contract:

Assessment Period
Acceptable

Performance Definition

How Measured
Incentives

Evaluation of Ordering Period 1 All measurement areas rated “Satisfactory” or above. See Enclosure (3).

Annual assessment period (12th month) evaluation using the quarterly Surveillance Checklists and the CPARs format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for award of future Task Orders. 1.* Receives a positive assessment (CPAR), appropriate for the quality of service provided (-) Does not meet the Acceptable performance definition as a condition for award of future Task Orders. * Receives a negative assessment (CPAR), appropriate for the quality of service provided.

Evaluation of Ordering Period 2 All measurement areas rated “Satisfactory” or above. See Enclosure (3).

Annual assessment period (12th month) evaluation using the quarterly Surveillance Checklists and the CPARs format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for award of future Task Orders. 1.* Receives a positive assessment (CPAR), appropriate for the quality of service provided (-) Does not meet the Acceptable performance definition as a condition for award of future Task Orders. * Receives a negative assessment (CPAR), appropriate for the quality of service provided.

Evaluation of Ordering Period 3 All measurement areas rated “Satisfactory” or above. See Enclosure (3).

Annual assessment period (12th month) evaluation using the quarterly Surveillance Checklists and the CPARs format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for award of future Task Orders. 1.* Receives a positive assessment (CPAR), appropriate for the quality of service provided (-) Does not meet the Acceptable performance definition as a condition for award of future Task Orders. * Receives a negative assessment (CPAR), appropriate for the quality of service provided.

Evaluation of Ordering Period 4 All measurement areas rated “Satisfactory” or above. See Enclosure (3).

Annual assessment period (12th month) evaluation using the quarterly Surveillance Checklists and the CPARs format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for award of future Task Orders. 1.* Receives a positive assessment (CPAR), appropriate for the quality of service provided (-) Does not meet the Acceptable performance definition as a condition for award of future Task Orders. * Receives a negative assessment (CPAR), appropriate for the quality of service provided.

Evaluation of Ordering Period 5 All measurement areas rated “Satisfactory” or above. See Enclosure (3).

Annual assessment period (12th month) evaluation using the quarterly Surveillance Checklists and the CPARs format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for award of future Task Orders. 1.* Receives a positive assessment (CPAR), appropriate for the quality of service provided (-) Does not meet the Acceptable performance definition as a condition for award of future Task Orders. * Receives a negative assessment (CPAR), appropriate for the quality of service provided.

* The Government may not exercise option within a Task Order or award future Task Orders unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

Enclosure (3)

DEFINITIONS

All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Management Responsiveness – Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract and task orders, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by the task orders, and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

The evaluation ratings are as follows:

The COR will perform a monthly assessment of Quality, Schedule and Cost Control utilizing the CPARS evaluation rating definitions are listed as follows:

Exceptional: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (>5%) below initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although a few areas require minor improvement, these areas are offset by superior performance in other areas. The few problems that do exist are insignificant in nature and have been noted, and the contractor has taken effective and quick corrective action.

Very Good: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs below the initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor has taken satisfactory corrective action.

Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub- task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory

Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

Enclosure (4)

SURVEILLANCE ACTIVITY CHECKLIST - QUARTERLY

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, and Management Responsiveness as applicable using utilizing the CPARS evaluation rating definitions listed in Enclosure (3). The assessments will be performed and report for each Task Order by the applicable Technical Point of Contact (TPOC) for each individual Task Order.

If a rating description or a rating category are not applicable during a given evaluation period, then a grade of “n/a” should be recorded.

QUARTERLY EVALUATION – BY SOW

Description
Surveillance Method/Measure
Date Planned
Date Completed
Quality
Schedule
Cost Control
Management Responsiveness

SAFE Program support, SOW paragraph 3.1.1, 3.2.1, 3.3.1, 3.4.1 100% Inspection by COR and customer feedback.

TBD

Strength Engineering support, SOW paragraph 3.1.2, 3.2.2, 3.3.2, 3.4.2 100% Inspection by COR and customer

TBD

Loads and Dynamics support, SOW paragraph 3.1.3, 3.2.3, 3.3.3, 3.4.3 100% Inspection by COR and customer

TBD

Financial Reports / Submission is in accordance with the DID cited in the CDRLs 100% Inspection by

COR.

TBD

QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS

(CDRLs) Form DD 1423

Description
Surveillance Method/Measure
Dates Due
Dates Completed
No. Submittals
No. of Req’d Rework
Percentage On Time
Comments

Technical Report/ Studies, A001 100% Inspection by

COR/TPOC/

subject matter expert.

Technical Report/ Studies, A003 100% Inspection by

Technical Report/ Studies, A004 100% Inspection by

Technical Report/ Studies, A005 100% Inspection by

Computer Software Product End Items, A006 100% Inspection by

Non-Disclosure (Company), A007 100% Inspection by

Non-Disclosure Agreement (Individual), A008 100% Inspection by

Software Product Package (SPP), A009 100% Inspection by

Individual Aircraft Tracking System Software, A010 100% Inspection by

Software Transition Plan, A011 100% Inspection by

Metric Summary: Current Period Cumulative Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Quarterly Summary of Ratings:

QualitySchedule
Number of Exceptional____Number of Exceptional____
Number of Very Good____Number of Very Good____
Number of Satisfactory____Number of Satisfactory____
Number of Marginal____Number of Marginal____
Number of Unsatisfactory____Number of Unsatisfactory____

Cost Control

Number of Exceptional____
Number of Very Good____
Number of Satisfactory____
Number of Marginal____
Number of Unsatisfactory____

SURVEILLANCE ACTIVITY CHECKLIST - ANNUAL

Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3).

Description
Surveillance Method/Measure
Date Planned
Date Completed
Summary Rating/Result

Quality of Product or Service

Review of Quarterly Ratings.
TBD
Schedule
Review of Quarterly Ratings
TBD
Cost Control
Review of Quarterly Ratings
TBD
Management
Review of Quarterly Ratings
TBD

Annual Surveillance Completed By: _______________________

Date Completed: ________________