Attachment L-5 Fully Burdened Rates cjs.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
SIMULATION DIVISION RDT&E LAB AND BUSINESS OPERATIONS SUPPORT SERVICES Federal contract opportunity
Solicitation number
N0042121R0109
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document provides instructions for a solicitation seeking simulation division research, development, test, and evaluation laboratory technical support services. The single award contract will provide for RDT&E laboratory technical support, business operations and management activities, administrative support, and non-technical facility operations support for the Simulation Division and associated laboratories, projects, simulation-based initiatives, and other activities. Services include requirements development, system development support, and operational and developmental flight test support for aviation systems as well as life-cycle operational support, system enhancements, procedure refinement, and accident investigations. Laboratory operational requirements cover setup, configuration, maintenance, operations, upgrades, and sustainment of hardware-in-the-loop manned and unmanned aviation simulation systems and supporting simulation infrastructure. The solicitation is in draft form with all attachments still in draft status, and the government will update the proposal due date as needed in final documentation. The solicitation was issued by the Department of the Navy Naval Air Systems Command Naval Air Warfare Center.

View the file

Other files for this federal contract opportunity

Other files attached to SIMULATION DIVISION RDT&E LAB AND BUSINESS OPERATIONS SUPPORT SERVICES, newest first.
File Type Posted
Final RFP Q_As 22 Jul 2021.pdf PDF
Attachment J-3 Wage Determination.pdf PDF
Attachment L-4 Lab Ops Cost Summary Spreadsheet Amendment 0001.xls XLS spreadsheet
Final RFP Q_As 20 Jul 2021.pdf PDF
Attachment L-1 Document Verification and Self-Scoring Worksheet Amendment 0001.xlsx XLSX spreadsheet
Attachment L-5 Fully Burdened Rates Amendment 0001.xlsx XLSX spreadsheet
N00421-21-R-0109 Amendment 0001 Conformed Copy.pdf PDF
Final RFP Q_As 14 July 21.pdf PDF
N0042121R0109 DD1423-CDRL_A003_Monthly_Progress_Report.pdf PDF
N0042119R0109-DD1423-CDRL-A006 - Transition Plan.pdf PDF
Attachment L-2 Relevant Experience Project Template final.pdf PDF
N0042121R0109 DD1423-CDRL_A001_Monthly_Financial_Summary.pdf PDF
N00421-21-R-0109 BID DD254 signed.pdf PDF
Attachment L-3 FPDS-NG final.pdf PDF
N0042119R0109 DD1423-CDRL-A004 - Locator.pdf PDF
N0042121R0109 DD1423-CDRL_A002_Monthly_Project_Financial_Summ.pdf PDF
RFP Final.pdf PDF
Attachment J-3 Wage Determination.pdf PDF
Attachment L-1 Document Verification and Self-Scoring Worksheet cjs.xlsx XLSX spreadsheet
Attachment L-4 Lab Ops Cost Summary Spreadsheet.xls XLS spreadsheet
N0042119R0109-DD1423-CDRL-A005- Incident Report.pdf PDF
Attachment L-6 Staffing Plan Table cjs.xlsx XLSX spreadsheet
QA for SAM.pdf PDF
QA for SAM.docx DOCX document
Wage Determination.pdf PDF
N00421-21-R-0109 BID DD254 signed.pdf PDF
QA for SAM.docx DOCX document
DRAFT RFP LabOps.pdf PDF
QA for SAM.docx DOCX document
Questions and Answers for SAM.docx DOCX document
DRAFT RFP LabOps.pdf PDF
N0042119R0109-DD1423-CDRL-A005- Incident Report.pdf PDF
N0042121R0109 DD1423-CDRL_A001_Monthly_Financial_Summary.pdf PDF
Attachment L-3 FPDS-NG cjs.pdf PDF
Attachment L-1 Document Verification and Self-Scoring Worksheet cjs.xlsx XLSX spreadsheet
J-1 DD254 - DRAFT - N0042121R0109.pdf PDF
N0042121R0109 DD1423-CDRL_A002_Monthly_Project_Financial_Summ.pdf PDF
N0042121R0109 DD1423-CDRL_A003_Monthly_Progress_Report.pdf PDF
Attachment L-5 Fully Burdened Rates cjs.xlsx XLSX spreadsheet
N0042119R0109-DD1423-CDRL-A006 - Transition Plan.pdf PDF
N0042119R0109 DD1423-CDRL-A004 - Locator.pdf PDF
Attachment L-4 Lab Ops Cost Summary Spreadsheet.xls XLS spreadsheet
Attachment L-6 Staffing Plan Table cjs.xlsx XLSX spreadsheet
Attachment L-2 Relevant Experience Project Template cjs.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions to Prime/Sub Contractors for completing Attachment L-X Annual Fully Burdened Labor

COLUMN/AREACOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
BOfferor NameEnter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies.
CProposed Labor Category (Furnished by Government)Enter the Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solicitation Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA".
DIndividual Designator*For each individual Contractor employee proposed; enter a different Identifying title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template
EProposed Hourly Fully-Burdened Labor Rate per Labor Category, per Labor Individual DesignatorEnter the Hourly Fully-Burdened Labor Rates proposed for the period of performance for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Hourly Fully-Burdened Labor Rates shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs.
FProposed Annual Fully-Burdened Labor per Labor Category, per Labor Individual DesignatorEnter the Annual Fully-Burdened Labor proposed for the period of performance for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period.

Prime Burdened Labor Rates

Base YearOption Year 1Option Year 2Option Year 3Option Year 4
Offeror NameLabor CategoryIndividual Designator*Proposed Hourly Fully-Burdened Labor RateProposed Annual Fully-Burdened LaborProposed Annual Fully-Burdened LaborProposed Annual Fully-Burdened LaborProposed Annual Fully-Burdened LaborProposed Annual Fully-Burdened Labor

&36N00421-21-R-0109&11

File details come from the government source that posted it. Updated .