This document package includes an attachment template for cost proposals related to a federal contract opportunity for integration and production support services.
The attachment template provides instructions for prime contractors and subcontractors to populate labor categories, hours, and costs for the base year and four option years. Prime contractors must perform at least 50% of the work. The opportunity involves providing technical and integration support services to the Navy's Combat Integration & Identification Systems Division for systems integration and production. The place of performance is 30% contractor site and 70% government sites in Maryland. Interested small businesses must respond to the sources sought with capabilities statements by July 8, 2019 addressing their experience, technical skills, and ability to perform over 50% of the work. The anticipated contract type is cost-plus-fixed-fee and involves service contract act labor categories.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for Prime Contractor: | |
| 1 | Enter Prime offeror name into cell A3. |
| 2 | Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. |
| 3 | Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 4 | Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor) |
| 5 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 6 | All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| 7 | All dollar figures shall be carried out no further than two decimal places. |
| 8 | In column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 9 | In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces. |
| 10 | Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly. |
| 11 | For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance. |
| 12 | Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas. |
| 13 | The prime should insert the subcontractor handling charge, if any. |
| 14 | The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor. |
| 15 | The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 16 | Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable. |
| 17 | Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions. |
| 18 | On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet |
| 19 | When submitting this file, the instructions may be deleted. |
| Instructions for Subcontractors: | |
| 1 | Enter Prime offeror name into cell A3. |
| Replace Prime Contractor with Subcontractor in A7, A8, A45, and A52. | |
| 2 | Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. |
| 3 | Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 4 | Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor) |
| 5 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 6 | All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| 7 | All dollar figures shall be carried out no further than two decimal places. |
| 8 | In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 9 | In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces. |
| 10 | Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly. |
| 11 | For subcontractor cost summary sheets, delete Rows 54-97. |
| 12 | When submitting this file, the instructions may be deleted. |
Cost Spreadsheet (LOE)
COST SUMMARY SPREADSHEET (LOE)
| Prime Offeror Name: | |||||||||||||||||||||||
| Subcontractor Name (if applicable): | |||||||||||||||||||||||
| Govt | CTR | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total | ||||||||||||||||
| Position | Cost Elements | Government Labor Category | Proposed Labor Category | F/P | Site (G) | Site (C) | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||||||
| 1 | Employee Name 1 | Administrative Assistant | C | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Administrative Assistant | C | ||||||||||||||||||||||
| Administrative Assistant | C | ||||||||||||||||||||||
| 2 | Employee Name 2 | CAD Operator III | G | ||||||||||||||||||||
| 3 | Employee Name 3 | CAD Operator IV* | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| 4 | Etc. | Computer and Information Research Scientists / Journeyman | G | ||||||||||||||||||||
| Computer and Information Research Scientists / Journeyman | G | ||||||||||||||||||||||
| Computer and Information Research Scientists / Journeyman | G | ||||||||||||||||||||||
| Computer and Information Research Scientists / Journeyman | G | ||||||||||||||||||||||
| 5 | Etc. | Electronics Technician I, Maintenance | C | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Electronics Technician I, Maintenance | C | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | C | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician I, Maintenance | G | ||||||||||||||||||||||
| 6 | Etc. | Electronics Technician II, Maintenance | G | ||||||||||||||||||||
| Electronics Technician II, Maintenance | C | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | C | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician II, Maintenance | G | ||||||||||||||||||||||
| 7 | Etc. | Electronics Technician III, Maintenance | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Electronics Technician III, Maintenance | C | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| Electronics Technician III, Maintenance | G | ||||||||||||||||||||||
| 8 | Etc. | Electrical Engineers / Journeyman | G | ||||||||||||||||||||
| 9 | Etc. | Electrical Engineers / Senior* | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Electrical Engineers / Senior* | G | ||||||||||||||||||||||
| Electrical Engineers / Senior* | G | ||||||||||||||||||||||
| Electrical Engineers / Senior* | G | ||||||||||||||||||||||
| Electrical Engineers / Senior* | G | ||||||||||||||||||||||
| 10 | Etc. | Engineering Technician II | G | ||||||||||||||||||||
| Engineering Technician II | G | ||||||||||||||||||||||
| 11 | Etc. | Engineering Technician III | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Engineering Technician III | G | ||||||||||||||||||||||
| Engineering Technician III | C | ||||||||||||||||||||||
| Engineering Technician III | G | ||||||||||||||||||||||
| Engineering Technician III | G | ||||||||||||||||||||||
| 12 | Etc. | Engineering Technician IV | G | ||||||||||||||||||||
| Engineering Technician IV | G | ||||||||||||||||||||||
| Engineering Technician IV | C | ||||||||||||||||||||||
| Engineering Technician IV | G | ||||||||||||||||||||||
| Engineering Technician IV | G | ||||||||||||||||||||||
| 13 | Etc. | Engineering Technician V* | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Engineering Technician V* | G | ||||||||||||||||||||||
| Engineering Technician V* | G | ||||||||||||||||||||||
| Engineering Technician V* | G | ||||||||||||||||||||||
| Engineering Technician V* | G | ||||||||||||||||||||||
| 14 | Etc. | Budget Analysts / Senior | C | ||||||||||||||||||||
| 15 | Etc. | Budget Analysts / Journeyman | C | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Budget Analysts / Journeyman | C | ||||||||||||||||||||||
| 16 | Etc. | General Clerk I | C | ||||||||||||||||||||
| General Clerk I | C | ||||||||||||||||||||||
| 17 | Etc. | Logisticians / Journeyman* | G | ||||||||||||||||||||
| Logisticians / Journeyman* | G | ||||||||||||||||||||||
| Logisticians / Journeyman* | G | ||||||||||||||||||||||
| 18 | Etc. | Material Coordinator | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Material Coordinator | G | ||||||||||||||||||||||
| Material Coordinator | G | ||||||||||||||||||||||
| Material Coordinator | C | ||||||||||||||||||||||
| 19 | Etc. | Management Analysts / Journeyman | C | ||||||||||||||||||||
| Management Analysts / Journeyman | C | ||||||||||||||||||||||
| Management Analysts / Journeyman | G | ||||||||||||||||||||||
| Management Analysts / Journeyman | G | ||||||||||||||||||||||
| Management Analysts / Journeyman | G | ||||||||||||||||||||||
| 20 | Etc. | General and Operations Managers / Senior* | C | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| 21 | Etc. | General and Operations Managers / Journeyman | G | ||||||||||||||||||||
| General and Operations Managers / Journeyman | G | ||||||||||||||||||||||
| General and Operations Managers / Journeyman | G | ||||||||||||||||||||||
| General and Operations Managers / Journeyman | G | ||||||||||||||||||||||
| General and Operations Managers / Journeyman | G | ||||||||||||||||||||||
| 22 | Etc. | Warehouse Specialist/Warehouse Worker | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||
| Warehouse Specialist/Warehouse Worker | G | ||||||||||||||||||||||
| Warehouse Specialist/Warehouse Worker | G | ||||||||||||||||||||||
| 23 | Etc. | Supply Technician | G | ||||||||||||||||||||
| Supply Technician | G | ||||||||||||||||||||||
| Supply Technician | G | ||||||||||||||||||||||
| Supply Technician | G | ||||||||||||||||||||||
| Supply Technician | G | ||||||||||||||||||||||
| Supply Technician | G | ||||||||||||||||||||||
| 24 | Etc. | Technical Writer III | C | ||||||||||||||||||||
| Technical Writer III | C | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||
| Total Direct Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||||||
| Overhead | |||||||||||||||||||||||
| Fringe Benefits | |||||||||||||||||||||||
| G&A | |||||||||||||||||||||||
| Total Indirect Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| Total Direct and Indirect Labor cost | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| COM | |||||||||||||||||||||||
| Total Prime Contractor Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 |
| Subcontractor Labor Cost | ||
| Subcontractor proposed cost and fee | ||
| 1 | Subcontractor Name 1 | Manager/ |
Operations Manager
| (Program Manager) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Manager/ |
Operations Manager
| (Program Manager) | C | |||
| 2 | Subcontractor Name 2 | Manager/ |
Operations Manager
| (Project Manager) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Manager/ |
Operations Manager
| (Project Manager) | C | ||||||||||||||
| 3 | Etc. | Electrical Engineers | |||||||||||||
| (Engineer/Scientist III) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Electrical Engineers | |||||||||||||||
| (Engineer/Scientist III) | C | ||||||||||||||
| 4 | Etc. | Electrical Engineers | |||||||||||||
| (Engineer/Scientist II) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Electrical Engineers | |||||||||||||||
| (Engineer/Scientist II) | C | ||||||||||||||
| 5 | Etc. | Electrical Engineers | |||||||||||||
| (Engineer/Scientist I) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Electrical Engineers | |||||||||||||||
| (Engineer/Scientist I) | C | ||||||||||||||
| 6 | Etc. | Program/ Project/Management Analysts (Program Analyst) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Program/ Project/Management Analysts (Program Analyst) | C | ||||||||||||||
| 7 | Etc. | Program/ Project/Management Analysts (Program Analyst) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Program/ Project/Management Analysts (Program Analyst) | C | ||||||||||||||
| 8 | Etc. | Computer Systems Analysts (Computer Specialist) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Computer Systems Analysts (Computer Specialist) | C | ||||||||||||||
| 9 | Etc. | Computer Systems Analysts (Computer Specialist) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Computer Systems Analysts (Computer Specialist) | C | ||||||||||||||
| 10 | Etc. | General and Operations Managers (Logistics Manager) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| General and Operations Managers (Logistics Manager) | C | ||||||||||||||
| 11 | Etc. | Logisticians | |||||||||||||
| (Logistics Analyst III) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Logisticians | |||||||||||||||
| (Logistics Analyst III) | C | ||||||||||||||
| 12 | Etc. | Logisticians | |||||||||||||
| (Logistics Analyst II) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Logisticians | |||||||||||||||
| (Logistics Analyst II) | C | ||||||||||||||
| 13 | Etc. | Logisticians | |||||||||||||
| (Logistics Analyst I) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Logisticians | |||||||||||||||
| (Logistics Analyst I) | C | ||||||||||||||
| 14 | Etc. | Management Analysts | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Management Analysts | C | ||||||||||||||
| 15 | Etc. | Computer Network Support Specialists (IT Analyst) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Computer Network Support Specialists (IT Analyst) | C | ||||||||||||||
| 16 | Etc. | Financial Analysts | |||||||||||||
| (Financial Analyst) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Financial Analysts | |||||||||||||||
| (Financial Analyst) | C | ||||||||||||||
| 17 | Etc. | Financial Analysts | |||||||||||||
| (Financial Analyst) | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| Financial Analysts | |||||||||||||||
| (Financial Analyst) | C | ||||||||||||||
| 18 | Etc. | Engineering Technician V | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Engineering Technician V | C | ||||||||||||||
| 19 | Etc. | Engineering Technician IV | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Engineering Technician IV | C | ||||||||||||||
| 20 | Etc. | Engineering Technician III | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Engineering Technician III | C | ||||||||||||||
| 21 | Etc. | Engineering Technician II | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Engineering Technician III | C | ||||||||||||||
| 22 | Etc. | Computer Programmer II | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Computer Programmer II | C | ||||||||||||||
| 23 | Etc. | Technical Writer III | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Technical Writer III | C | ||||||||||||||
| 24 | Etc. | Technical Writer II | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Technical Writer II | C | ||||||||||||||
| 25 | Etc. | Drafter/CAD Operator III | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Drafter/CAD Operator III | C | ||||||||||||||
| 26 | Etc. | Drafter/CAD Operator II | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Drafter/CAD Operator II | C | ||||||||||||||
| 27 | Etc. | Supply Technician | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Supply Technician | C | ||||||||||||||
| 28 | Etc. | Warehouse Specialist | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Warehouse Specialist | C | ||||||||||||||
| 29 | Etc. | General Clerk III | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| General Clerk III | C | ||||||||||||||
| 30 | Etc. | Administrative Assistant | G | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| Administrative Assistant | C | ||||||||||||||
| Total proposed subcontractor labor cost and fee | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| Prime contractor pass through (not including fee) | |||||||||||||||
| Handling | |||||||||||||||
| G&A | |||||||||||||||
| Other (if any) | |||||||||||||||
| Total pass through (not including fee) | |||||||||||||||
| Total Subcontractor Cost including pass through | 0 |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor * |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF) 0
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all CLINs (Labor and ODCs) 0
Grand Total of CPFF all CLINs
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | $0 | |
| Pass Through Amount (not including fee) | $0 | |
| Prime Contractor Fee for Subcontractor Labor * | $0 | |
| Total Pass Through Amount (including fee) | $0 | ERROR:#DIV/0! |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | $0 | |
| Fixed Fee for Labor Performed by Prime Contractor | $0 | ERROR:#DIV/0! |
Page &P &F
KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:
Summary CLIN Summary Sheet
CLINS CLIN Description Total Hours Total Cost Total Fixed Fee Total Value $
Total