This document provides a presolicitation notice and draft statement of work for an indefinite delivery/indefinite quantity contract to provide contractor support services for anti-submarine warfare systems engineering at the Naval Air Warfare Center Aircraft Division in Patuxent River, Maryland. Services will include engineering, administrative, business, information technology, logistics, and engineering management support for legacy and new acoustic and non-acoustic sensors, systems and subsystems for naval air platforms. The contract will have a single award and be set aside for small businesses with a cost-plus-fixed-fee level of effort pricing structure. The period of performance is five years from an estimated December 2019 award date. The notice requests feedback on the draft statement of work by April 12, 2019. The incumbent contractor is American Electronic Warfare Associates.
CDRL A005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_RFP.docx | DOCX document | |
| 45N_CDRL_A001.doc | DOC document | |
| 45N_CDRL_A012.doc | DOC document | |
| 45N_CDRL_A011.doc | DOC document | |
| 45N_CDRL_A003.doc | DOC document | |
| 45N_CDRL_A002.doc | DOC document | |
| 45N_CDRL_A007.doc | DOC document | |
| 45N_CDRL_A008.doc | DOC document | |
| 45N_CDRL_A013.doc | DOC document | |
| 45N_CDRL_A004.doc | DOC document | |
| 45N_CDRL_A009.doc | DOC document | |
| 45N_CDRL_A006.doc | DOC document | |
| 45N_CDRL_A010.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
FORM APPROVED
OMB No.0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to, Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract Office for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO |
| B. EXHIBIT |
| C. CATEGORY |
| TBD |
| A |
| TDP |
| TM |
| OTHER: MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACTOR/PR NO. |
| F. CONTRACTOR |
| NAWCAD 4.5.14 |
| TBD |
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Risk Management Status Report
3. SUBTITLE
Risk Management Report
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)
DI-MGMT-81809
5. CONTRACT REFERENCE
SOW Para 3.3.1.2
6. REQUIRING OFFICE
AD4.5.14
7. DD 250 REQ
LT
9. DIST STATEMENT REQUIRED
10. FREQUENCY
ONE/R
12 DATE OF FIRST
See BLK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
| D |
| 11. AS OF DATE |
13. DATE OF SUBSEQUENT See BLK 16
| a. ADDRESSEE |
| Draft |
| FINAL |
Reg Repro
16. REMARKS
BLOCK 4: Contractor format acceptable. Data Item Description cited as a guide only.
BLOCK 8: and 13: The Government has 45 working days for review and acceptance or rejection. Contractor has 30 days for re-submittal if accepted with comments or rejected.
BLOCK 9: DISTRIBUTION STATEMENT D, Department of Defense and U.S. DoD contractors only (Critical Technology) (Date). Other requests shall be referred to (Cognizant Program Office assigned at time of award).
BLOCK 12: Report to be submitted NLT 45 days after completing studies, research, development, test and evaluation.
BLOCK 14: One (1) soft copy (Reg). Soft copy shall be delivered in the original and modifiable application (e.g., Microsoft Office, AutoCAD, etc.) to:
Building 2185 RM 1130
22347 Cedar Point Road
Patuxent River, MD 20670
DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, NISPOM, Section 5-705.
4.5.14 (See Block 16)
| 1 |
| 1 |
15.TOTAL
| 1 |
| 1 |
G. PREPARED BY
H. DATE
13 September 2018
I. APPROVED BY
J. DATE
DD FORM 1423, JUN 90 Previous editions are obsolete Page of Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
_1598688181.pdf
DATA ITEM DESCRIPTION
Title: Risk Management Status Report
Number: DI-MGMT-81809 Approval Date: 20100426 AMSC Number: N9132 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Preparing Activity: SH/PMS-408 Applicable Forms: N/A
Use/relationship: The Contractor’s Risk Management Status Report will be used to document the contractor’s progress for: risk identification; risk mitigation planning: risk management plan implementation; and risk tracking. This data will allow management to make informed decisions.
This Data Item Description (DID) contains the format, content, and preparation instructions for the data product resulting from the work task specified in the contract.
Requirements:
1. Format. The Risk Management Report shall be in contractor’s format.
2. Content. The report shall contain a title page identifying the following:
a. Contractor’s Name
b. Contract Number and Dates of Award (including the latest modification)
c. All dates inclusive to the tasks for the reporting period.
2.1. The report shall contain the contractor’s progress in risk identification, analysis, implementation of mitigation, and tracking.
2.2. The report shall identify efforts made in assessing the current consequence of the identified performance (P), schedule (S), and cost (C) risks on the program, and shall contain a projection of the risk mitigation implementation.
2.3. The report shall contain a five (5) by five (5) matrix to identify risks to Performance (P), Schedule (S), and Cost (C). A vertical axis shall indicate the “Likelihood” and the horizontal axis shall indicate the “Consequence” of a root cause occurrence. The level of risk for each root cause shall be identified as green low, yellow for moderate, or red for high.
2.4. The report shall contain a narrative briefly describing the risk, title, type (P, S, or C), root cause, current mitigations, and planned mitigations efforts identified , along with critical dates (risk reduction milestones).
Source: https://assist.dla.mil -- Downloaded: 2018-09-17T15:16Z Check the source to verify that this is the current version before use.
DI-MGMT-81809
Page 2 of 2 Pages
3. Media requirements. The report shall be presented in electronic media, MS Word version 2003-2007.
4. END OF DID DI-MGMT-81809.