45N_CDRL_A002.doc

DOC document 184 KB Posted

Attached to
AIR-4. 5. 14 Airborne Anti-Submarine Warfare (ASW) Contractor Support Services (CSS) Follow-On
Solicitation number
N00421-19-R-0049
Issued by

About this file

This notice provides details for a follow-on anti-submarine warfare support services contract to be awarded by the Naval Air Systems Command. The incumbent contractor, American Electronic Warfare Associates, currently provides engineering, administrative, business, information technology, logistics, and engineering management support to the Naval Air Warfare Center Aircraft Division's Airborne ASW Systems Engineering Division in Patuxent River, Maryland. The follow-on contract will be a cost-plus-fixed-fee, indefinite delivery/indefinite quantity contract set aside for small businesses with a period of performance from December 2019 to December 2024. A draft statement of work and solicitation are attached outlining requirements for continued research, development, testing, evaluation, and training support across all phases of ASW sensor, system, and platform acquisition programs. Interested parties are requested to provide any feedback on the draft solicitation by April 12, 2019.

CDRL A002

View the file

Other files

File Type Posted
Draft_RFP.docx DOCX document
45N_CDRL_A001.doc DOC document
45N_CDRL_A012.doc DOC document
45N_CDRL_A011.doc DOC document
45N_CDRL_A003.doc DOC document
45N_CDRL_A007.doc DOC document
45N_CDRL_A008.doc DOC document
45N_CDRL_A013.doc DOC document
45N_CDRL_A004.doc DOC document
45N_CDRL_A005.doc DOC document
45N_CDRL_A009.doc DOC document
45N_CDRL_A006.doc DOC document
45N_CDRL_A010.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

FORM APPROVED

OMB No.0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to, Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contract Office for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO
B. EXHIBIT
C. CATEGORY
TBD
A
TDP
TM
OTHER MGMT
D. SYSTEM/ITEM
E. CONTRACTOR/PR NO.
F. CONTRACTOR
NAWCAD 4.5.14
TBD

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Phase-Out Transition Plan

3. SUBTITLE

Transition Plan

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)

DI-MGMT-81945

5. CONTRACT REFERENCE

SOW Para 3.1.9

6. REQUIRING OFFICE

AD4.5.14

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

10. FREQUENCY

ONE/R

12 DATE OF FIRST SUBMISSION

See BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D
11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

See BLK 16

a. ADDRESSEE
Draft
FINAL

Reg Repro

16. REMARKS

BLOCK 4: Contractor format acceptable. Content in accordance with DID.

BLOCK 8 and 13: Allow 45 working days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 30 days after receipt of Government comments.

BLOCK 9: DISTRIBUTION STATEMENT D, Department of Defense and U.S. DoD contractors only (Critical Technology) (Date). Other requests shall be referred to (Cognizant Program Office assigned at time of award).

BLOCKS 10 and 12: Submit 90 days after contract award with updates during the transition-out phase as required.

BLOCK 14: One (1) soft copy (Reg). Soft copy shall be delivered in the original and modifiable application (e.g., MS Word, Excel, AutoCAD, etc.) to:

Building 2185 RM 1130 22347 Cedar Point Road

Patuxent River, MD 20670

DESTRUCTION NOTICE: Follow procedures in DoD 5220.22-M, NISPOM, Section 5-705.

4.5.14 (See Block 16)

1
1

15.TOTAL

1
1

G. PREPARED BY

H. DATE

14 September 2018

I. APPROVED BY

J. DATE

DD FORM 1423, JUN 90 Previous editions are obsolete Page of Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

_1598686144.pdf

DATA ITEM DESCRIPTION

Title: Phase-Out Transition Plan

Number: DI-MGMT-81945 Approval Date: 20130916

AMSC Number: N9430 Limitation: N/A

DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: AS/PMA-207

Applicable Forms: N/A

Use/relationship:

The Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site to the follow-on contractor.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order.

Requirements:

1. Format. Contractor format is acceptable.

2. Content. The Phase-Out Transition Plan shall include:

a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.

b. Details of accounts and subscription services to be terminated or transferred.

c. Process to conduct a full joint inventory and transference of all Government

Furnished Material inventory including all records.

d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.

e. Details for the removal of all contractor owned items.

f. Critical path schedule for risk mitigation of the transition period.

g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.

3. End of DI-MGMT-81945.

Source: https://assist.dla.mil -- Downloaded: 2018-09-17T14:38Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .