Attachment_2_QASP.doc
DOC document 112 KB Posted
- Attached to
- AIR-4. 11 Life Cycle Support (LCS)
- Solicitation number
- N00421-16-R-0072
About this file
Attachment 2 QASP
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-XX-R-tbd N00421-16-R-0072 Attachment 2
Quality Assurance Surveillance Plan and Contract Surveillance Plan for Life Cycle Support (LCS)
1. Purpose
This contract requirement consists of both Performance Based and Non-Performance Based tasks; therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP) are required. The LOE tasks for engineering and in-service logistics support are non-performance based; which requires a CSP. Whereas, the non-LOE tasks for system upgrades utilizes the QASP.
A QASP is a Government developed document used to ensure that systematic quality assurance methods are used in the administration of performance-based service contracts. The intent is to ensure that the contractor performs in accordance with the performance metrics and that the Government receives the quality of service called for in the contract.
A CSP is a Government developed and applied document used to make sure the systematic quality assurance assessment methods are used in the administration of the Performance Work Statement (PWS)/Statement of Work (SOW).The intent is to ensure that the Government receives the quality of services and products for tasks identified in the PWS/SOW.
This contract requirement is for LCS services for the in-service engineering of C5ISR systems. This includes legacy and current C5ISR systems and the in-service support, engineering support services, technical management, integrated product support, C-E equipment/systems and subsystems training, configuration management, and technical documentation and technical data support of those systems, subsystems, and components. A properly executed QASP/CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP/CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP (Quality Assurance Surveillance Plan)/CSP (Contract Surveillance Plan). The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP and/or CSP, on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely and effective and are delivering the results specified in the contract.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer (CO) - A person duly appointed with the authority to enter into contracts (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is, AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Project Leads - The COR designates an individual Government Project Lead to assist in administering of specific efforts under the contract.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP/CSP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who ensures that the contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance
Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make contractual commitments or authorize changes to the contract on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
Alternate Contracting Officer’s Representative– The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Government Project Leads – The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance Contractor Performance Assessment Report System (CPARS) – The market place for in-service engineering, technical, and logistics support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. The Government will address the quality of product or service, schedule, cost control, regulatory compliance, management, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP/CSP.
QASP - The below listed methods of surveillance (Enclosures 1 and 2) shall be used by the COR and the Government Project Leads in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist (Enclosure 3) provided herein.
SAC - The Surveillance Activity Checklist (Enclosure 3) below lists the methods of surveillance that will be used by the COR in the technical administration of the SOW tasks performed by the contractor.
Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor and Government Project Leads for the non-LOE production tasks while enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance of both the LOE engineering and training tasks and non-LOE production tasks and shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly QASP reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the CORT system. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) - Performance Standards (For Performance Based system upgrades tasks only) Enclosure (2) - Incentives (For non-LOE system upgrades tasks only) Enclosure (3) - Surveillance Activity Checklist (For both the Non-Performance Based engineering and in-service Tasks and non-PB system upgrades tasks)
PERFORMANCE-BASED QUALITY STANDARDS
| SOW Task Description |
| Performance Standard and Acceptable Quality Level (AQL)* |
| Surveillance Method/Measure |
| Incentives |
| Provide services and supplies in support of C-E equipment/systems and subsystems IAW PWS Paras 3.1 – 3.3 |
| Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable. |
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2. |
| Technical Support Services per SOW 3.1 – 3.3 |
| Submission is in accordance with the DID cited in the CDRL. |
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2. |
| SOW/CDRL Task Description |
| Standard |
AQL
Surveillance Method/Measure
Incentives
| Technical Documentation per CDRLs A001–A008, A012, A017, A020-A021 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 95% Inspection by COR. |
| See Enclosure 2. |
| Technical Progress Reporting per CDRL A009–A011, A013, A022 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR. |
| See Enclosure 2. |
| Security & Administrative Data Reporting per CDRLs A014, A016, A018, A019 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR |
| See Enclosure 2. |
PERFORMANCE-BASED QUALITY STANDARDS
INCENTIVES
The following incentives shall apply to performance under this contract:
Assessment Period Acceptable Performance Definition
How Measured
Incentives
| During the 5 year ordering period this contract will be assessed every year starting at the 6 month mark. |
| None of the measurement areas are rated “Marginal” or below. |
See below.
Midpoint of the assessment period (6th month) evaluation using the CPARS format covering the previous 6 months.
(+) Meet the acceptable performance definition as a condition for the task orders (-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*
| 1.5 year mark |
| None of the measurement areas are rated “Marginal” or below. |
Midpoint of the assessment period (18th month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for the task order.*
(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*
| 2.5 year mark |
| 2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below. |
Midpoint of the assessment period (30th month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for the task order.*
(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*
| 3.5 year mark |
| 2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below. |
Midpoint of the assessment period (42nd month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for the task order.*
(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*
| 4.5 year mark |
| 2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below. |
Midpoint of the assessment period (54th month) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for the task order.*
(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*
| 5 year mark |
| 2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below. |
Endpoint of the assessment period (60th month) evaluation using the CPARS format covering the previous 6 months.
(+) Receive a positive final assessment (CPAR), appropriate for the quality of services provided.
(-) Receive a negative final assessment (CPAR), appropriate for the quality of services provided.
* The Government reserves the right to not award additional task ordersunless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All PWS/SOW and CDRL efforts will be assessed focusing on the following:
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contributed to or affected the schedule variance. Also address the significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor-provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. Also assess the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.
Regulatory Compliance – Assess compliance with all terms and conditions in the contract relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (i.e. Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by contract, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business.
Other Areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PWS/SOW paragraphs 3.1 through 3.3. The contractor shall be evaluated using the following ratings:
Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant, tangible or intangible, benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). The few areas for improvement are all minor. There are no recurring problems. Contractor’s management initiates effective corrective action whenever needed. .
Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor takes satisfactory corrective action.
Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.
Marginal: Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not always meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Corrective actions have not been taken or are ineffective.
SURVEILLANCE ACTIVITY CHECKLIST
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality of Product or Service, Schedule, Cost Control, Regulatory Compliance, Management, Utilization of Small Business, and Other Areas utilizing the CPARS evaluation rating definitions listed in Enclosure (2).
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Technical Support Services per SOW 3.1 In-Service & Engineering Support Services |
| 100% inspection by COR of Government Project Lead Quarterly Input |
| TBD |
| Technical Support Services per SOW 3.2 Integrated Product Support & C-E Equipment/Systems and Subsystems Training Support Services |
| 100% inspection by COR of Government Project Lead Quarterly Input |
| TBD |
| Technical Support Services per SOW 3.3 Technical Data & Configuration Management Support Services |
| 100% inspection by COR of Government Project Lead Quarterly Input |
| TBD |
Quarterly Summary of Ratings:
Quality of Product
Schedule
Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Cost Control
Regulatory Compliance
Number of Exceptional
Management
Utilization of Small Business
Other Areas
Checklist Completed By: ____________________________
Date Completed: ____________________________ annual SURVEILLANCE:
The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (2). This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract which cover only the previous 6 months.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings. |
| TBD |
| Schedule |
| Review of Quarterly Ratings. |
| TBD |
| Cost Control |
| Review of Quarterly Ratings. |
| TBD |
| Regulatory Compliance |
| Review of Quarterly Ratings. |
| TBD |
| Management |
| Review of Quarterly Ratings. |
| TBD |
| Utilization of Small Business |
| Review of Quarterly Ratings. |
| TBD |
| Other Areas |
| Review of Quarterly Ratings. |
| TBD |
Annual Surveillance Completed By: ____________________________
Date Completed:
File details come from the government source that posted it. Updated .