Attachment_2_QASP.doc

DOC document 112 KB Posted

Attached to
AIR-4. 11 Life Cycle Support (LCS)
Solicitation number
N00421-16-R-0072
Issued by

About this file

Attachment 2 QASP

View the file

Other files

File Type Posted
N00421-16-R-0072-0006.docx DOCX document
Attachment_P8_Labor_Categories_Hours_by_Location.xlsx XLSX spreadsheet
LCS_RFP_Amendment_0005.pdf PDF
Attachment_P6_Cost_Summary_Format.xlsx XLSX spreadsheet
Attachment_P6_Cost_Summary_Format.xlsx XLSX spreadsheet
Attachment_P7_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
LCS_RFP_Amendment_0004.pdf PDF
Attachment_3_Wage_Determinations.docx DOCX document
Attachment_P8_Labor_Categories_Hours_by_Location.xlsx XLSX spreadsheet
LCS_RFP_Amendment_0003.pdf PDF
LCS_RFP_Amendment_0002.pdf PDF
Attachment_3_Wage_Determinations.docx DOCX document
Attachment_P3_Workforce_Hours_Matrix.xlsx XLSX spreadsheet
Attachment_5_RDT&E_SOP.docx DOCX document
Attachment_P6_Cost_Summary_Format.xlsx XLSX spreadsheet
Attachment_P5_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_4_Non-Navy_IT_Approval.docx DOCX document
LCS_Final_RFP_11.8.17.pdf PDF
Attachment_8_List_of_Approved_Subcontractors.docx DOCX document
Attachment_P7_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_7_List_of_Key_Personnel.docx DOCX document
Attachment_P4_Past_Performance_Information_Form.pdf PDF
Attachment_9_OCI_List.docx DOCX document
Attachment_6_Small_Business_Subcontracting_Plan.docx DOCX document
Exhibit_A_CDRLs.xlsx XLSX spreadsheet
Attachment_1_DD254.pdf PDF
Attachment_P1_Reserved_1.docx DOCX document
Attachment_P2_Reserved_2.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-XX-R-tbd N00421-16-R-0072 Attachment 2

Quality Assurance Surveillance Plan and Contract Surveillance Plan for Life Cycle Support (LCS)

1. Purpose

This contract requirement consists of both Performance Based and Non-Performance Based tasks; therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP) are required. The LOE tasks for engineering and in-service logistics support are non-performance based; which requires a CSP. Whereas, the non-LOE tasks for system upgrades utilizes the QASP.

A QASP is a Government developed document used to ensure that systematic quality assurance methods are used in the administration of performance-based service contracts. The intent is to ensure that the contractor performs in accordance with the performance metrics and that the Government receives the quality of service called for in the contract.

A CSP is a Government developed and applied document used to make sure the systematic quality assurance assessment methods are used in the administration of the Performance Work Statement (PWS)/Statement of Work (SOW).The intent is to ensure that the Government receives the quality of services and products for tasks identified in the PWS/SOW.

This contract requirement is for LCS services for the in-service engineering of C5ISR systems. This includes legacy and current C5ISR systems and the in-service support, engineering support services, technical management, integrated product support, C-E equipment/systems and subsystems training, configuration management, and technical documentation and technical data support of those systems, subsystems, and components. A properly executed QASP/CSP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this QASP/CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP (Quality Assurance Surveillance Plan)/CSP (Contract Surveillance Plan). The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP and/or CSP, on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely and effective and are delivering the results specified in the contract.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer (CO) - A person duly appointed with the authority to enter into contracts (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is, AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Leads - The COR designates an individual Government Project Lead to assist in administering of specific efforts under the contract.

5. Responsibilities

The following Government resources shall have responsibility for the implementation of this QASP/CSP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who ensures that the contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance

Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make contractual commitments or authorize changes to the contract on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer’s Representative– The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Government Project Leads – The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance Contractor Performance Assessment Report System (CPARS) – The market place for in-service engineering, technical, and logistics support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. The Government will address the quality of product or service, schedule, cost control, regulatory compliance, management, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP/CSP.

QASP - The below listed methods of surveillance (Enclosures 1 and 2) shall be used by the COR and the Government Project Leads in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist (Enclosure 3) provided herein.

SAC - The Surveillance Activity Checklist (Enclosure 3) below lists the methods of surveillance that will be used by the COR in the technical administration of the SOW tasks performed by the contractor.

Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor and Government Project Leads for the non-LOE production tasks while enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance of both the LOE engineering and training tasks and non-LOE production tasks and shall be provided to the Contracting Officer on a quarterly basis.

8. Documentation

In addition to providing quarterly QASP reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the CORT system. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9. Enclosures

Enclosure (1) - Performance Standards (For Performance Based system upgrades tasks only) Enclosure (2) - Incentives (For non-LOE system upgrades tasks only) Enclosure (3) - Surveillance Activity Checklist (For both the Non-Performance Based engineering and in-service Tasks and non-PB system upgrades tasks)

PERFORMANCE-BASED QUALITY STANDARDS

SOW Task Description
Performance Standard and Acceptable Quality Level (AQL)*
Surveillance Method/Measure
Incentives
Provide services and supplies in support of C-E equipment/systems and subsystems IAW PWS Paras 3.1 – 3.3
Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2.
Technical Support Services per SOW 3.1 – 3.3
Submission is in accordance with the DID cited in the CDRL.
100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2.
SOW/CDRL Task Description
Standard

AQL

Surveillance Method/Measure

Incentives

Technical Documentation per CDRLs A001–A008, A012, A017, A020-A021
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
95% Inspection by COR.
See Enclosure 2.
Technical Progress Reporting per CDRL A009–A011, A013, A022
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR.
See Enclosure 2.
Security & Administrative Data Reporting per CDRLs A014, A016, A018, A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR
See Enclosure 2.

PERFORMANCE-BASED QUALITY STANDARDS

INCENTIVES

The following incentives shall apply to performance under this contract:

Assessment Period Acceptable Performance Definition

How Measured

Incentives

During the 5 year ordering period this contract will be assessed every year starting at the 6 month mark.
None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (6th month) evaluation using the CPARS format covering the previous 6 months.

(+) Meet the acceptable performance definition as a condition for the task orders (-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*

1.5 year mark
None of the measurement areas are rated “Marginal” or below.

Midpoint of the assessment period (18th month) evaluation using the CPARS format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for the task order.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*

2.5 year mark
2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below.

Midpoint of the assessment period (30th month) evaluation using the CPARS format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for the task order.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*

3.5 year mark
2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below.

Midpoint of the assessment period (42nd month) evaluation using the CPARS format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for the task order.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*

4.5 year mark
2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below.

Midpoint of the assessment period (54th month) evaluation using the CPARS format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for the task order.*

(-) Does not meet the acceptable performance definition as a condition for awarding additional task orders*

5 year mark
2 or more of the measurement areas rated “Very Good” or “exceptional”. None of the measurement areas are rated “Marginal” or below.

Endpoint of the assessment period (60th month) evaluation using the CPARS format covering the previous 6 months.

(+) Receive a positive final assessment (CPAR), appropriate for the quality of services provided.

(-) Receive a negative final assessment (CPAR), appropriate for the quality of services provided.

* The Government reserves the right to not award additional task ordersunless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All PWS/SOW and CDRL efforts will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contributed to or affected the schedule variance. Also address the significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor-provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. Also assess the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.

Regulatory Compliance – Assess compliance with all terms and conditions in the contract relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (i.e. Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by contract, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business.

Other Areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PWS/SOW paragraphs 3.1 through 3.3. The contractor shall be evaluated using the following ratings:

Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant, tangible or intangible, benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). The few areas for improvement are all minor. There are no recurring problems. Contractor’s management initiates effective corrective action whenever needed. .

Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor takes satisfactory corrective action.

Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.

Marginal: Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not always meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Corrective actions have not been taken or are ineffective.

SURVEILLANCE ACTIVITY CHECKLIST

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality of Product or Service, Schedule, Cost Control, Regulatory Compliance, Management, Utilization of Small Business, and Other Areas utilizing the CPARS evaluation rating definitions listed in Enclosure (2).

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Technical Support Services per SOW 3.1 In-Service & Engineering Support Services
100% inspection by COR of Government Project Lead Quarterly Input
TBD
Technical Support Services per SOW 3.2 Integrated Product Support & C-E Equipment/Systems and Subsystems Training Support Services
100% inspection by COR of Government Project Lead Quarterly Input
TBD
Technical Support Services per SOW 3.3 Technical Data & Configuration Management Support Services
100% inspection by COR of Government Project Lead Quarterly Input
TBD

Quarterly Summary of Ratings:

Quality of Product

Schedule

Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal

Number of Unsatisfactory

Cost Control

Regulatory Compliance

Number of Exceptional

Management

Utilization of Small Business

Other Areas

Checklist Completed By: ____________________________

Date Completed: ____________________________ annual SURVEILLANCE:

The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (2). This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract which cover only the previous 6 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings.
TBD
Schedule
Review of Quarterly Ratings.
TBD
Cost Control
Review of Quarterly Ratings.
TBD
Regulatory Compliance
Review of Quarterly Ratings.
TBD
Management
Review of Quarterly Ratings.
TBD
Utilization of Small Business
Review of Quarterly Ratings.
TBD
Other Areas
Review of Quarterly Ratings.
TBD

Annual Surveillance Completed By: ____________________________

Date Completed:

File details come from the government source that posted it. Updated .