CIIDS_Draft_CDRLs_Revised_19_Feb_2016.pdf

PDF 399 KB Posted

Attached to
Combat Integration & Identification Systems Division (CI&IDS) Program Management Support
Solicitation number
N00421-16-R-0060
Issued by

About this file

DRAFT CDRLs Revised 19 Feb 2016.

View the file

Other files

File Type Posted
RFP_N00421-16-R-0060_Questions_10-6-2016.docx DOCX document
RFP_N00421-16-R-0060_Questions_10-3-2016.docx DOCX document
RFP_Amendment_2.docx DOCX document
Amendment_2_Questions.docx DOCX document
RFP_N00421-16-R-0060_Amendment_1.docx DOCX document
Cost_Summary_Spreadsheet_Updated.xls XLS spreadsheet
Questions_R-0060_Answered_1.docx DOCX document
Questions_R-0060_Answered.docx DOCX document
Exhibit_A_CDRL's.xlsx XLSX spreadsheet
Attachment_1_CSP.docx DOCX document
Attachment_2_Draft_DD_Form_254._Contract_Security_Class._Spe.pdf PDF
Attachment_P3_Past_Performance_Questionnaire.docx DOCX document
Attachment_7_SGFE(Excel).xlsx XLSX spreadsheet
Attachment_5_SGFE(PDF).pdf PDF
Attachment_P2_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_6_RGFE(PDF).pdf PDF
Attachment_4_Data_Item_Xmittal_Form.docx DOCX document
Attachment_8_RGFE(Excel).xlsx XLSX spreadsheet
N00421-16-R-0060.docx DOCX document
Attachment_3_OCI_List.docx DOCX document
Attachment_P1_Cost_Summary_Spreadsheet.xlsx XLSX spreadsheet
CI IDS_Q A.docx DOCX document
CIIDS_Draft_Level_of_Effort.docx DOCX document
Draft_CDRLs.pdf PDF
Draft_PWS.docx DOCX document
Personnel_Quals.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTS DATA REQUIREMENTS LIST Form Approved

(1 Data Item) OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (NDTI)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

8. APP CODE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE

N/A Reg Repro

16. REMARKS NAWCAD 4.11.2 1 1 1

Subsequent revisions may be requested by the Contracting Officer's Representative (COR) or the Alternate Contracting Officer's

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Program Management Plan

DI-MGMT-81797 SOW Paragraph 3.1.1 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ONE/R 30 DAC

ASREQ ASREQ

Initial report draft will be within 30 days after contract award, followed by a revised final within 15 days after initial draft delivery.

Representative during performance of the contract. Contractor format shall be acceptable with Government pre-approval.

St. Inigoes, MD 20684-4012

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (MISC)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 23

1007/183 will take place. Contractor format shall be acceptable with Government pre-approval.

St. Inigoes, MD 20684-4012

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

Packages (SWPs), Standard Operating Procedures (SOPs), and Work Instructions (WIs). Requests for reports will be as required, and can be initiated by the Contracting Officer's Representative and/or the 4.11.2 functional Government leads responsible for the

ASREQ

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services

Process Review Report Process Improvement Recommendation

SOW Paragraphs 3.1.2, 3.3.1 & 3.7.2

A

TBD

NAWCAD 4.11.2DI-SESS-81924

Draft

D

LT

ASREQ ASREQ

b. COPIES

11. AS OF DATE Final business function (Program Management, Financial Management, Acquisition, Operations, Administration) under which the review

ASREQ

Report shall include review of applicable program management, financial management, administrative and operations processes in support of the CI&IDS Division. Report should include a review of any applicable parent or subordinate 4.11.2 Standard Work

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (NDTI)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

St. Inigoes, MD 20684-4012

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Process Review Report Program Plan, Schedule and Work Estimate Process Improvement

Recommendations

DI-SESS-81924 SOW Paragraph 3.1.3 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQ ASREQ

ASREQ ASREQ

Report shall include review of applicable program plans, schedules and related work estimates in accordance with NAVAIR

4355.19D. Requests for reports will be as required, and can be initiated by the Contracting Officer's Representative and/or the

4.11.2 functional Government leads responsible for the business function (Program Management, Financial Management

Acquisition, Operations, Administration) under which the review will take place. Contractor format shall be acceptable with Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (NDTI)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

functional Government leads responsible for the business function (Program Management, Financial Management, Acquisition, Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Program Analysis/Recommendations

DI-MISC-80508 SOW Paragraphs 3.1.5, 3.4.8 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQ ASREQ

ASREQ ASREQ

Requests for reports will be as required, and can be initiated by the Contracting Officer's Representative and/or the 4.11.2

Operations, Administration) under which the review will take place. Contractor format shall be acceptable with Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (ADMN)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Contracting Officer's Representative (COR) or the Alternate Contracting Officer's Representative. Contractor format shall be acceptable with Government pre-approval.

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

St. Inigoes, MD 20684-4012

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Contractor's Corrective Action Plan Quality Control Plan

DI-MGMT-80501 SOW Paragraph 3.1.7 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ONE/R 30 DAC

ASREQ ASREQ

Report shall include surveillance methods and mitigation strategies for work products and deliverables failing to meet quality standards. Initial report will be due within 30 days after contract award, and as required, revisions may be requested by the

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Contractor's Progress, Status and Management Report

DI-MGMT-81904 SOW Paragraph 3.1.8 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

MTHLY 30 DAC

ASREQ ASREQ

Report shall include review of activities executed against SOW paragraphs 3.1 through 3.8. Initial report will be due within 30 days after contract award. Subsequent reports will be due monthly on the 10th of each month. Contractor format shall be acceptable with Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP________ TM ________ Other X (ADMN)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Key Events Schedule Task Order Accomplishment Report

DI-MGMT-81791 SOW Paragraph 3.1.9 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

30 DACMTHLY

ASREQ ASREQ

Report shall be submitted within 30 days after the close of each individual task order, and shall include a task order accomplishments summary for major CI&IDS efforts supported to include program/project name, contractor work activities, dates of support, efficiencies gained and overall impact to the CI&IDS mission. Contractor format shall be acceptable with

Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Project Cost Report

DI-MISC-80508 SOW Paragraph 3.1.9 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

MTHLY 45 DAC

ASREQ ASREQ

Initial reports shall be submitted within 45 days after task order award. Subsequent reports shall be submitted monthly by the 10th of each month, and shall be constructed for each program/project identified by NAWCAD 4.11.2 Government Project Analysts

(GPAs) assigned to the four branches of the CI&IDS Division. Project cost reports shall be maintained in accordance with the

CI&IDS Division Project Cost Report template and subsequent Work Instruction (WI).

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (ILSS)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Division Funding Summary

DI-MISC-80508 SOW Paragraph 3.3.6 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

15 DACWKLY

ASREQ ASREQ

Initial report shall be submitted within 15 days after task order award. Subsequent reports shall be submitted weekly in accordance with guidance from the 4.11.2 Business Financial Manager (BFM). Contractor format shall be acceptable with Government

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP___X_____ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Division Acquisition Dashboard

DI-MISC-80508 SOW Paragraph 3.3.6 & 3.5.9 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

45 DACMTHLY

ASREQ ASREQ

Initial report shall be submitted within 45 days after task order award. Subsequent reports shall be submitted by the 15th of each month with guidance from the 4.11.2 Acquisition Manager. Contractor format shall be acceptable with Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X_______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Division Acquisition Metrics

DI-MISC-80508 SOW Paragraph 3.5.7 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

QTRLY See Block 16

ASREQ ASREQ

Initial submission shall be due within 30 days after the close of the first fiscal year aligned quarter (Qtr. 1: October - December;

Qtr. 2: January - March; Qtr. 3: April - June; Qtr. 4: July - September). Each subsequent submission shall be due within 30 days after the close of subsequent fiscal year aligned quarters. Metrics shall at a minimum include number of contract actions opened, number of actions awarded, and dollars obligated per contract type, in accordance with guidance from the Division Acquisition

Manager. Contractor format shall be acceptable with Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X_______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1 1

functional Government leads responsible for the business function (Program Management, Financial Management, Acquisition, Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

St. Inigoes, MD 20684-4012

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Presentation Materials

DI-ADMN-81373 SOW Paragraphs 3.6.12 - 3.6.14 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQASREQ

ASREQ ASREQ

Presentation materials will be due as required, and can be initiated by the Contracting Officer's Representative and/or the 4.11.2

Operations, Administration) under which the review will take place. Drafts may be required depending on the content or nature of the presentation materials at the gudiance of the Division functional lead. Contractor format shall be acceptable with Government

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (MCCR)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 23

1007/183

St. Inigoes, MD 20684-4012

4000 A

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Division 5-Year Program Development Plan

DI-MISC-80508 SOW Paragraph 3.7.4 NAWCAD 4.11.2

LT

b. COPIES

D

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

11. AS OF DATE

Draft

Final

See Block 16ANNUALLY

ASREQ ASREQ

The contract shall prepare and deliver a 5-Year Development Plan in the first quarter of each fiscal year (October to December).

The Plan shall be in accordance with the requirements set forth in paragraph 3.7.4. The contractor shall interview, at a minimum, all Division senior leadership members to assess content areas of importance to the Division Leadership Team. A draft should be prepared and reviewed with the Contracting Officer's Representative and the Division Director 30 days prior to final delivery to ensure content, format and delivery will meet Division expectations. The contractor may include additional reviews at their discretion. Contractor format shall be acceptable with Government pre-approval.

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X_____ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1 1

functional Government leads responsible for the business function (Program Management, Financial Management, Acquisition, Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Training Materials

DI-ILSS-80872 SOW Paragraph 3.7.5 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQASREQ

ASREQ ASREQ

Training materials will be due as a training deficiency is identified by the Contracting Officer's Representative and/or the 4.11.2

Operations, Administration) under which the review will take place. Drafts may be required depending on the content or nature of the training materials at the gudiance of the Division functional lead. Contractor format shall be acceptable with Government

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (IPSC)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A015

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

functional Government leads responsible for the business function (Program Management, Financial Management, Acquisition, Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Conference Agenda Meeting Agenda

DI-ADMN-81249 SOW Paragraph 3.8.3 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQASREQ

ASREQ ASREQ

Meeting agendas will be required as identified by the Contracting Officer's Representative and/or the 4.11.2

Operations, Administration) under whom the meeting will take place. Drafts may be required depending on the content or nature of the meeting agenda at the gudiance of the Division functional lead. Contractor format shall be acceptable with Government

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM _X_______Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A016

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1 1

functional Government leads responsible for the business function (Program Management, Financial Management, Acquisition, Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Conference Minutes Meeting Minutes

DI-ADMN-81250 SOW Paragraph 3.8.3 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQ ASREQ

ASREQ ASREQ

Meeting minutes will be required for ALL meetings identified by the Contracting Officer's Representative and/or the 4.11.2

Operations, Administration) under whom the meeting will take place. Drafts may be required depending on the content or nature of the meeting minutes at the gudiance of the Division functional lead. Contractor format shall be acceptable with Government pre-approval.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (MCCR)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A017

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1 1

Block 14:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 17 of 23

1007/183

St. Inigoes, MD 20684-4012

4000 A

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Technical Report - Study/Services Technical Assistance Performance Evaluation (TAPE) Program Report

DI-MISC-80508 SOW Paragraph 3.8.5 NAWCAD 4.11.2

LT

b. COPIES

D

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

11. AS OF DATE

Draft

Final

See Block 16MTHLY

ASREQ ASREQ

Initial TAPE reports shall be submitted the 15th of the month following task order award. Subsequent reports shall be submitted monthly by the 10th of each month, and shall be constructed for each program/project identified by NAWCAD 4.11.2 Government Project Analysts

(GPAs) assigned to the four branches of the CI&IDS Division. Project cost reports shall be maintained in accordance with the

CI&IDS Division Project Cost Report template and subsequent Work Instruction (WI).

business function (Program Management, Financial Management, Acquisition, Operations, Administration) under which the review will take place.

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A018

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 18 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

CI&IDS Program Management, Financial Management, Administrative and Operations Support Services TBD

Trip/Travel Report

DI-MISC-81943 SOW Paragraph 4.1.1 NAWCAD 4.11.2

LT

b. COPIES

D 11. AS OF DATE

Draft

Final

ASREQASREQ

ASREQ ASREQ

Trip reports shall be submitted within 10 days after completion of any trip in accordance with SOW paragraph 4.1.1.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A019

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2 1 1

Block 14:

All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or DVD-ROM to the following address:

ATTN: COR

NAWCAD 4.11.2

Combat Integration & Identification Systems Division

17472 Webster Field Road

Building 8164

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 19 of 23

1007/183

4000 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and…