ISEET FLIGHT TEST PROGRAM SUPPORT
Solicitation number
N00421-15-R-0090
Issued by

About this file

Answer to question by contractors

View the file

Other files

File Type Posted
Responses_AIR_5_1_1_ISEET_FOLLOW_ON__RFP_Question_Log_second_set_of_questions.xlsx XLSX spreadsheet
Attachment_1_AIR-5.1.1._ISEET_SOW_Questions_Response.docx DOCX document
Responses_AIR_5_1_1_N00421_15_R_0090_RFP_Questions.xlsx XLSX spreadsheet
Responses_AIR_5_1_1_ISEET_FOLLOW_ON__RFP_AMMENDMENT_0001.docx DOCX document
Attachment_6_OPSEC_DI-MGMT-80934C.pdf PDF
Attachment_9_System_Authorization_Access_Request_Navy_(SAAR-N)_Instructions_OPNAV_5239.docx DOCX document
Attachment_P-6B_Cost_Summary_Spreadsheet_-_Subcontractor.xls XLS spreadsheet
Attachment_7_Base_Access_Visit_Request.doc DOC document
Attachment_P-4_CPARS_Update_Questionaire.doc DOC document
CDRL_A005_OPSEC_Plan.pdf PDF
Attachment_8_System_Authorization_Access_Request_Navy_(SAAR-N)_Form.pdf PDF
Attachment_10_TASS_Registration_Request.pdf PDF
CDRL_A002_PMR.pdf PDF
RFP_ISEET_FOLLOW-ON_9_22_2016_APPROVED.docx DOCX document
Attachment_2_Surveillance_Activity_Checklist.docx DOCX document
Attachment_P6-A_-_Cost_Summary_Spreadsheet_-_Prime_Contractor.xls XLS spreadsheet
Attachment_1_AIR-5.1.1._ISEET_SOW.docx DOCX document
Attachment_P5_-_Past_Performance_Questionaire.doc DOC document
CDRL_A003_Tech_Report.pdf PDF
Attachment_3_DD-254_-_DOD_Contract_Security_Classification_Specification.pdf PDF
Attachment_5_Strategic_Technical_ _Development_Guidebook.pdf PDF
Attachment_P-1_Workforce_Qualification_Matrix.xls XLS spreadsheet
CDRL_A001_MSR.pdf PDF
Attachment_11_Travel_Request.xls XLS spreadsheet
CDRL_A004_Transition_Plan.pdf PDF
Attachment_4_OCI_List.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

No.QuestionResponseUpdate to RFPResponsibleQuestion DateLegal ReviewContracts Review
1SOW lists Engineering/Electronics Technician Junior; Section L shows Engineering Technician, Journey Level. Please clarify and if the latter, indicate appropriate education/experience requirements.Engineering/ Electronics Technician, Junior as listed in the Section C SOW Para 3.2.10 Table is the correct Proposed Labor Category. The SOW Para 3.2.10 Table Function Description, Education Requirement and Expereince Requirement is appropriate as stated in the SOW.
Updated Sect L Table 4.3.1, Updated Sect M Table 4.2.2.Customer/Technical9/23/169/29/169/28/16
2SOW shows five Engineer/Scientist, Journey and two Engineer/Scientist, Junior; Section L shows numbers the other way around. Are we correct in following Section L?SOW Appendix A and Section L are now matching and are corrected.Updated Sect L Table 4.3.1.Customer/Technical9/23/169/29/169/28/16
3SOW shows 22 Program Analyst and seven Program Analyst, Junior; Section L shows numbers the other way around. Are we correct in following Section L?Section L 4.3.1 is the correct one to follow.Updated SOW Appendix A.Customer/Technical9/23/169/29/169/28/16
4With respect to questions 2 & 3, please confirm that the government and contractor site alignments are the same (i.e. predominant number of each labor cat at the government site).Appendix A and Section L site determinations are as designed for proposal purpose only. SOW and Section L will remain unchaged.No Action.Customer/Technical9/23/169/29/169/28/16
5Is hand delivery of proposals acceptable, and if so, to what address?Yes. To the address in Section LSection L - Updated 1.6 Instructions for Submission of ProposalsContract9/26/169/29/169/28/16
6Section L, 1.8 lists a number of elements required to be included in each volume (Title page, table of contents, etc.). Do these items count against page limits?Yes, all items count against the page limitsNo Action.Customer9/26/169/29/169/28/16
7The list of attachments includes P-1, Workforce Qualification Spreadsheet. No reference is made to P-1 in Section L or elsewhere. Are we correct in assuming it was included in error?Yes was included in error.Updated list of attachments in Section J removing P1 from the listing and contractors are to disregard the P-1 attachmentContracts9/27/169/29/169/28/16
8Section L states no pictures are allowable. In Section L, 2.2 (Management Plan) we are requested to discuss proposed management roles of our workforce, and lines of responsibility, authority and communication. These are very difficult to do adequately without use of organizational diagrams. Will the government permit offerors to include organizational diagrams as part of their Management Plan submissions?Organizational diagrams are allowed and will count against page limiteNo change to the RFPCustomer9/28/169/29/169/28/16
9The RFP includes Attachment P4, which is a CPARS update questionnaire, as well as P5, which is a Past Performance questionnaire. Section L, Para 3.2 CPARS makes no mention of P4. Which attachment should we use to request update of a CPARS over 12 months old?P4 was included in error. Please use the P5 as instructed in Section L Para 3.2Updated list of attachments in Section J removing P4 from the listing and contractors are to disregard the P-4 attachmentContract9/29/169/29/169/29/206
10A follow on question to the one regarding page counts and the required title pages, tables of contents, etc.

- Since required administrative information will count against page limits, please clarify how we are to count in volume 2? Understanding of the Work has a 15 page limit; Management Plan has a 25 page limit. Which of these do the title page, table of contents, etc. count against?

Prefatory administrative matter not applicable to a section does not count against a section page limitNo Action.Customer10/2/16
11For contracts of this size, it is typical to see a dedicated program manager; this is even true of much smaller contracts. Will the government consider adding a senior program manager billet to the workforce/labor categories, perhaps at a .5 FTE level?for proposal purposes there is no requirement for a dedicated program manager (nor is there a labor category). No Dedicated Program Manager is required for this effort.No Action.Customer10/2/16
12We have noticed a discrepancy related to number of hard copies required for submission. The SF33 indicates sealed packages are required to contain an original and 3 copies; however Section L paragraph 1.6 indicates that the proposal should be submitted via CD-ROM and accompanied by 3 hard copies. Request you please confirm the total number of CD-ROMs and hard copies that are required as part of this submission.1 Original, 3 hard copies and 1 CD-ROMNo Action.Customer10/2/16

Sheet2