CDRL_A002_PMR.pdf

PDF 104 KB Posted

Attached to
ISEET FLIGHT TEST PROGRAM SUPPORT Federal contract opportunity
Solicitation number
N00421-15-R-0090
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

CDRL - PMR

View the file

Other files for this federal contract opportunity

Other files attached to ISEET FLIGHT TEST PROGRAM SUPPORT, newest first.
File Type Posted
Responses_AIR_5_1_1_ISEET_FOLLOW_ON__RFP_Question_Log_third_set_of_questions.xlsx XLSX spreadsheet
Responses_AIR_5_1_1_ISEET_FOLLOW_ON__RFP_Question_Log_second_set_of_questions.xlsx XLSX spreadsheet
Attachment_1_AIR-5.1.1._ISEET_SOW_Questions_Response.docx DOCX document
Responses_AIR_5_1_1_ISEET_FOLLOW_ON__RFP_AMMENDMENT_0001.docx DOCX document
Responses_AIR_5_1_1_N00421_15_R_0090_RFP_Questions.xlsx XLSX spreadsheet
Attachment_P-4_CPARS_Update_Questionaire.doc DOC document
CDRL_A005_OPSEC_Plan.pdf PDF
Attachment_8_System_Authorization_Access_Request_Navy_(SAAR-N)_Form.pdf PDF
CDRL_A003_Tech_Report.pdf PDF
CDRL_A001_MSR.pdf PDF
Attachment_1_AIR-5.1.1._ISEET_SOW.docx DOCX document
Attachment_P5_-_Past_Performance_Questionaire.doc DOC document
Attachment_P-6B_Cost_Summary_Spreadsheet_-_Subcontractor.xls XLS spreadsheet
RFP_ISEET_FOLLOW-ON_9_22_2016_APPROVED.docx DOCX document
Attachment_10_TASS_Registration_Request.pdf PDF
Attachment_2_Surveillance_Activity_Checklist.docx DOCX document
Attachment_P6-A_-_Cost_Summary_Spreadsheet_-_Prime_Contractor.xls XLS spreadsheet
Attachment_5_Strategic_Technical_ _Development_Guidebook.pdf PDF
Attachment_3_DD-254_-_DOD_Contract_Security_Classification_Specification.pdf PDF
Attachment_P-1_Workforce_Qualification_Matrix.xls XLS spreadsheet
Attachment_6_OPSEC_DI-MGMT-80934C.pdf PDF
Attachment_9_System_Authorization_Access_Request_Navy_(SAAR-N)_Instructions_OPNAV_5239.docx DOCX document
CDRL_A004_Transition_Plan.pdf PDF
Attachment_11_Travel_Request.xls XLS spreadsheet
Attachment_4_OCI_List.docx DOCX document
Attachment_7_Base_Access_Visit_Request.doc DOC document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XXXX A TDP _______ TM ________ OTHER _ADMIN___

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

AIR-5.1 ISEET Department Support TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Report, Record of Meeting/ Minutes Program Management Reviews

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 (See Block 16) SOW Task 3.3.3 AIR 5.1.1

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT

D

(See Block 16)

As Required As Required b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A N/A As Required Draft Reg.

Repro

16. REMARKS NAVAIR 5.1D COR 1 1 0

BLK 4: With exception:

DID Item: Other - The Contractor shall support contract management reviews as required in support of CDRL A001 and to review program and project management status and results, financial review, and issues of concern. The

5.1.1D shall coordinate the meeting as required and will set the sequence for follow-on PMR. Inputs (electronic draft due 5 business days prior) (final electronic version due 1 business days prior), presentation packages (up to 10 hard copies) (as required), minutes (electronic copies due 5 business days post) and any other miscellaneous reports (as required).

DID Item: 10.4 – Primary presentation shall be visual (projector, monitor, computer) and should be formatted according (most likely standard MS application). Verify format with TPOC prior to requirement.

BLK 9: Distribution authorized to U.S. Government Agencies only.

BLK 12: Program Kick-Off meeting shall be held 31 Days post award to demonstrate the contractor’s preparedness to assume management of the contract and support of the 5.1.1 customers aligned for day 1 operations.

BLK 14b: Physical copies such as handouts may be requested by the TPOC

(ODC).

Other: Electronic submittal is required. Prearrange electronic submittal over

5MB.

NAVAIR 5.1.1D 1 1 As

RQD

15. TOTAL 2 2 *

G. PREPARED BY H. DATE I. APPROVED BY : J. DATE

Tanya Bassett 6/3/2016

William Denenea

6/7/2016

DD Form 1423-2 Feb 01 Previous editions are obsolete. Page 1 of 1 Page

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

File details come from the government source that posted it. Updated .