This sources sought notice and draft statement of work describe a requirement for engineering and technical support services. The Naval Air Warfare Center Aircraft Division seeks a contractor to provide local integration, research and development, engineering, quality management, and technical support services for command, control, communications and computer systems, information systems, and unmanned aerial systems. Services include software development, satellite testing, engineering drawings, on-site training, and production and integration work to be performed primarily on-site at facilities in St. Inigoes, Maryland. The estimated five-year contract has a period of performance from April 2016 to April 2021, includes cost-plus-fixed-fee and firm-fixed-price task orders, and has a total level of effort of 1,290,240 man-hours. Responses were due December 3, 2014.

CSIS Documents

View the file

Other files

File Type Posted
CSIS_Additional_Questions_as_of_11_March_2015.docx DOCX document
CSIS_-_Industry_Day_Brief_(19_Nov_14)_-_Rev_3.pptx PPTX presentation
CSIS_Industry_day_attendees.xlsx XLSX spreadsheet
CSIS_Questions_ _Answers_11062014.docx DOCX document
CSIS_Questions_ _Answers_102314.docx DOCX document
Attachment_2_Base_Access_Form_R1.doc DOC document
Attachment_1_-_CSIS_-_SOW_DC.docx DOCX document
Attachment_4_-_Draft_CSIS__Personnel_Quals.docx DOCX document
Attachment_2_Base_Access_Form.doc DOC document
Attachment_3_-_LOE_CSIS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Communications Systems Integration Support (CSIS) N00421-15-R-0002

Question(s) as a result of CSIS Industry Day.

Question 1: Is there any software development?

Answer 1: Yes, there is a small amount of Software Development.

Question 2: Does the facility have the ability to conduct live over-the-air satellite testing?

Answer 2: Yes, the facility supports live over-the-air testing.

Question 3: Is there Level lll drawing package for engineering effort?

Answer 3: Ship or Shore site provide drawings to the sponsor.

Question 4: Is there a requirement to provide on-site training upon system delivery?

Answer 4: Yes, the requirement will be in the contract.

Question 5: Do you support PMA281?

Answer 5: Yes.

Question 6: About Section 3 – Integration Does TIPS also go through engineering?

Answer 6: There is engineering effort associated with TIPS. The current system has been designed but future variants will require additional engineering efforts.

Question 7: Where is the majority of production done?

Answer 7: The majority of the production and integration work will be completed in facilities located on St. Inigoes.

Question8: Will TIPS utilize COTS equipment?

Answer 8: COTS equipment is utilized where appropriate throughout the systems.

Question 9: TIPS – how many systems will be fielded?

Answer 9: Over 30 TIPS systems have been fielded on multiple platforms.

Question 10: Are there any surge requirements?

Answer 10: There is always the possibility of a surge of work due to schedule requirements; however the government realizes that surges must be managed on a case-by-case basis.

Question 11: Is the work completed utilizing multi-shifts or single shift?

Answer 11: Mainly single shift.

Question 12: Is support equipment provided?

Answer 12: Non-specific test equipment (special purpose) is provided.

Question 13: How much workforce of contractor and government working as a mix-side by side?

Answer 13: Certain tasking will be a joint effort between government and contractor; other areas will be fully executed by the contractor.

Question 14: Is there a lot of start up & stop, or is the tasking steady?

Answer 14: Depends on the fielding of systems, but the work is fairly continuous.

Question 15: Is there a local machine shop for most of metal work?

Answer 15: Yes, there is a government machine shop located on St. Inigoes that is utilized when appropriate. The machine shop can also paint.

Question 16: Will the Contractor be responsible to provide some materiel?

Answer 16: Yes, all methods of procurement will be evaluated and a decision on which procurement type will be executed based on cost and lead time.

Question 17: OCONUS – how will you request pricing for OCONUS activities? Will this beTDY?

Answer 17: Cost estimates for OCONUS will be handled in the same process as CONUS.

Question 19: In regards to ramp-up- will ramp up include facilities and personnel? For example; contractors can develop and establish facilities upon award?

Answer 19: Yes, the contract allows for a ramp up period for both facilities and personnel.