Exhibit_A-CDRLs.pdf
PDF 381 KB Posted
- Solicitation number
- N00421-14-R-0085
About this file
Exhibit A CDRLs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00421-14-R-0085-01.doc | DOC document | |
| CDRLUpdated_Exhibit_A.xls | XLS spreadsheet | |
| Attachment_5-NMCI.doc | DOC document | |
| Attachment_P2_Workforce_Hour_Matrix.xls | XLS spreadsheet | |
| N00421-14-R-0085.doc | DOC document | |
| Attachment_1-QASP.doc | DOC document | |
| Attachment_3_OCI_List.docx | DOCX document | |
| Attachment_7_GFP.pdf | ||
| Attachment_P6_CLIN_Breakout_spreadsheet.xls | XLS spreadsheet | |
| Attachment_2-_DD_Form_254.pdf | ||
| Attachment_4_-_Data_Item_Xmittal_Form.doc | DOC document | |
| Attachment_P5_PastPerformanQuest.doc | DOC document | |
| Attachment_8_GFP_Form.pdf | ||
| N0042114R0085_-_Relative_Navigation.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTS DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A041
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX REQUIRED
8. APP CODE C 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft
N/A Reg Repro
16. REMARKS NAWCAD 4.11.1.1 1 1
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
quarter and then the 10th of the month following each quarter thereafter.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
St. Inigoes, MD 20684-4012
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 41 of 41
ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
See Block 16 See Block 16
Block 14 Address:
Department of the Navy
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: The contractor shall submit Labor Mix Reports consisting ofemployee lists to show name, branch, labor
11. AS OF DATE Final
SOW Para: 7.4.1 NAWCAD 4.11.1.1
Commander, NAVAIRWARCENACDIV category, clearance level and, if applicable, the date of the last COMSEC briefing. The contractor shall include any gains and losses that have occurred within the last quarter in the Labor Mix Reports. The 1st report is due 10 days after the first contract
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Labor Mix Reports
Quarterly See Block 16
NAWCAD St. Inigoes Format
b. COPIES
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80227
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.1.1 1 1
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
St. Inigoes, MD 20684-4012
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 11, 12 & 13: Submit by the 15th working day of each month for the preceding month.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Contractor's Progress, Status and Management Report
SOW Para: 3.1.1. 3.2.1.1, 4.3 NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
Monthly See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FNCL-80331A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 11, 12 & 13: Submit by the 15th working day of each month for the preceding month.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Funds and Man-Hours Expenditure Report Funds and Time Expenditure Reprot
SOW Para: 3.1.1, 4.1 NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
Monthly See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FNCL-80331A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 11, 12 & 13: Submit 10 working days after delivery of the voucher.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Funds and Man-Hours Expenditure Report Voucher Reconciliation Report
SOW Para: 3.1.1, 4.2 NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
Monthly See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.1.1 1 1
Block 4: Contractor shall submit in Contractor format.
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 41 either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
SOW Para: 3.2.1.2, 3.2.7a NAWCAD 4.11.1.1Contractor Format (See Block 16)
CLIN 5000
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N0421-14-R-0085
Briefing / Presentation Material
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
Commander, NAVAIRWARCENACDIV
See Block 16 See Block 16
Blocks 10, 11, 12 & 13: Submit NLT 5 working days prior to scheduled briefing.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81757A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 10, 11, 12 & 13: Submit by 10 working days prior to scheduled review.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Design Review Information Package (DRIP)
SOW Para: 3.2.2 NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81785
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Final
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Systems Engineering Management Plan (SEMP) Systems Engineering Plan
SOW Para: 3.2.2 NAWCAD 4.11.1.1
b. COPIES
0TIME See Block 16
Department of the Navy
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit draft plan 30 working days after request with final due 15 working days after
Block 14 Address:
11. AS OF DATE
government comments received.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81430A NOT 1
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 41
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Operational Concept Description (OCD) Concept of Operations (CONOPS)
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
SOW Para: 3.2.2a, 3.2.7, 3.2.7c, 3.2.9.1.3, 3.2.11, 3.2.12 NAWCAD 4.11.1.1
Commander, NAVAIRWARCENACDIV
See Block 16 See Block 16
Blocks: 10, 11, 12 & 13: Submit by the 10th working day after requested.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81121A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 10, 11, 12 & 13: Submit draft 10 working days after request and final 5 working days after government comments.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Baseline Description Document Capability Description Document (CDD)
SOW Para: 3.2.2, 3.2.2a NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.1.1 1 1
Block 4: This handbook is for guidance only and cannot be cited as a requirement. Contractor format acceptable.
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 10, 11, 12 & 13: Due 30 working days after analyzation of system requirements.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Systems Requirements Document Guidance
SOW Para: 3.2.2a, 3.2.6, 3.2.7b, 3.2.11, 3.2.12 NAWCAD 4.11.1.1MIL-HDBK-520A (See Block 16)
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81861
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 11, 12 & 13: Submit 10 working days after request.
Block 14 Address:
SOW Para: 3.2.2a, 3.2.12, 3.2.13a&b NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Integrated Program Management Report (IPMR) Cost Analyses
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 41
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10 11, 12 & 13: Submit 10 working days after request .
SOW Para: 3.2.2a, 3.2.4e NAWCAD 4.11.1.1
Block 14 Address:
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Scientific and Technical Reports Analyses of Alternatives (AOA)
See Block 16
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 10, 11, 12 & 13: Submit 10 working days after request.
Block 14 Address:
SOW Para: 3.2.2a NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Scientific and Technical Reports Acquisition Strategies
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81861
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 41 1007/183
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 11, 12 & 13: Submit 15th working day of the month and as requested due to updated changes.
Block 14 Address:
SOW Para: 3.2.2a NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
Monthly See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Integrated Program Management Report (IPMR) Program Schedules
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80566A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 41
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Blocks 10, 11, 12 & 13: Due 30 working days before test is scheduled to be held.
Block 14 Address:
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Test Plan Test and Evaluation Master Plan (TEMP)
SOW Para: 3.2.2a NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Commander, NAVAIRWARCENACDIV
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-CMAN-80639C
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14 Address:
SOW Para: 3.2.2a NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Engineering Change Proposal (ECP)
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A016
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
MIL-HDBK-61A (See Block 16)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.1.1 1 1
Block 4: This handbook is for guidance only and cannot be cited as a requirement. Contractor format acceptable.
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14 Address:
SOW Para: 3.2.2a NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Configuration Management Guidance Configuration Control Board (CCB) documentation
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE Software Support Activity (SSA)
A017 Requirements Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81433A NOT 1
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 17 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14 Address:
NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Software Requirements Specification (SRS)
SOW Para: 3.2.2a
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A018
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-CMAN-81248A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 18 of 41
Commander, NAVAIRWARCENACDIV
17454 Webster Field Road ATTN: Code 4.11.1.1 Bldg 8271
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Interface Control Document (ICD)
SOW Para: 3.2.2a, 3.2.9.1.2 NAWCAD 4.11.1.1
See Block 16 See Block 16
11. AS OF DATE
CLIN 5000
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Final
See Block 16 See Block 16
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14 Address:
Department of the Navy
b. COPIES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A019
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-81284
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 19 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14 Address:
Department of the Navy
See Block 16 See Block 16
17454 Webster Field Road
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Test and Evaluation Program Plan (TEPP)
SOW Para: 3.2.2a, 3.2.3a
Test and Evaluation Requirements Analysis (TERA)
11. AS OF DATE Final
NAWCAD 4.11.1.1
b. COPIES
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A020
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 20 of 41
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Block 14 Address:
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 30 working days after requested.
See Block 16 See Block 16
11. AS OF DATE Final
SOW Para: 3.2.2e NAWCAD 4.11.1.1
b. COPIES
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Scientific and Technical Reports Technology Readiness Assessment
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A021
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80711A
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 21 of 41
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14 Address:
SOW Para: 3.2.2c&g, 3.2.4a&d, 3.2.6, 3.2.11, 3.2.12, 3.2.2c NAWCAD 4.11.1.1
Department of the Navy
b. COPIES
See Block 16 See Block 16
11. AS OF DATE Final
See Block 16 See Block 16
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Engineering and Integration Support for Relative Navigation Systems for Air Traffic Control N00421-14-R-0085
Scientific and Technical Reports Analysis Reports
CLIN 5000
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP______ TM ______ Other _X _
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A022
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81731
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 22 of 41 1007/183
Commander, NAVAIRWARCENACDIV ATTN: Code 4.11.1.1 Bldg 8271 17454 Webster Field Road
Blocks 10, 11, 12 & 13: Due 15 working…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .