About this file

CDRL- Exhibit A as amended

View the file

Other files

File Type Posted
N00421-14-R-0085-01.doc DOC document
Attachment_5-NMCI.doc DOC document
Attachment_P2_Workforce_Hour_Matrix.xls XLS spreadsheet
N00421-14-R-0085.doc DOC document
Attachment_1-QASP.doc DOC document
Attachment_3_OCI_List.docx DOCX document
Attachment_7_GFP.pdf PDF
Exhibit_A-CDRLs.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet.xls XLS spreadsheet
Attachment_2-_DD_Form_254.pdf PDF
Attachment_4_-_Data_Item_Xmittal_Form.doc DOC document
Attachment_P5_PastPerformanQuest.doc DOC document
Attachment_8_GFP_Form.pdf PDF
N0042114R0085_-_Relative_Navigation.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A001

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Contractor's Progress, Status and Management Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80227SOW Para: 3.1.1.1, 3.1.13.1, 4.3NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
MonthlySee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit by the 15th working day of each month for the preceding month.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of41
1007/183

A002

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002Funds and Man-Hours Expenditure ReportFunds and Time Expenditure Reprot
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-FNCL-80331ASOW Para: 3.1.13.1, 4.1NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
MonthlySee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit by the 15th working day of each month for the preceding month.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage2of41
1007/183

A003

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003Funds and Man-Hours Expenditure ReportVoucher Reconciliation Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-FNCL-80331ASOW Para: 3.1.13.1, 4.2NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
MonthlySee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit 10 working days after delivery of the voucher.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage3of41
1007/183

A004

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN0421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Briefing / Presentation Material
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Contractor Format (See Block 16)SOW Para: 3.1.1.2, 3.1.7aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 4: Contractor shall submit in Contractor format.
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Submit NLT 5 working days prior to scheduled briefing.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage4of41
1007/183

A005

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Design Review Information Package (DRIP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81757ASOW Para: 3.1.2NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Submit by 10 working days prior to scheduled review.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage5of41
1007/183

A006

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006Systems Engineering Management Plan (SEMP)Systems Engineering Plan
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81785SOW Para: 3.1.2NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
0TIMESee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit draft plan 30 working days after request with final due 15 working days after
government comments received.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage6of41
1007/183

A007

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Operational Concept Description (OCD)Concept of Operations (CONOPS)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81430A NOT 1SOW Para: 3.1.2a, 3.1.7, 3.1.7c, 3.1.9.1.3, 3.1.11, 3.1.12NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks: 10, 11, 12 & 13: Submit by the 10th working day after requested.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage7of41
1007/183

A008

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008Baseline Description DocumentCapability Description Document (CDD)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81121ASOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Submit draft 10 working days after request and final 5 working days after government comments.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage8of41
1007/183

A009

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Systems Requirements Document Guidance
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
MIL-HDBK-520A (See Block 16)SOW Para: 3.1.2a, 3.1.6, 3.1.7b, 3.1.11, 3.1.12NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 4: This handbook is for guidance only and cannot be cited as a requirement. Contractor format acceptable.
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 30 working days after analyzation of system requirements.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage9of41
1007/183

A010

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010Integrated Program Management Report (IPMR)Cost Analyses
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-81861SOW Para: 3.1.2a, 3.1.12, 3.1.13.2a&bNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit 10 working days after request.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage10of41
1007/183

A011

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A011Scientific and Technical ReportsAnalyses of Alternatives (AOA)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80711ASOW Para: 3.1.2a, 3.1.4eNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10 11, 12 & 13: Submit 10 working days after request .
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage11of41
1007/183

A012

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A012Scientific and Technical ReportsAcquisition Strategies
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80711ASOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Submit 10 working days after request.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage12of41
1007/183

A013

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A013Integrated Program Management Report (IPMR)Program Schedules
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-81861SOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
MonthlySee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 11, 12 & 13: Submit 15th working day of the month and as requested due to updated changes.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage13of41
1007/183

A014

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A014Test PlanTest and Evaluation Master Plan (TEMP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80566ASOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 30 working days before test is scheduled to be held.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage14of41
1007/183

A015

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A015Engineering Change Proposal (ECP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-CMAN-80639CSOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage15of41
1007/183

A016

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A016Configuration Management GuidanceConfiguration Control Board (CCB) documentation
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
MIL-HDBK-61A (See Block 16)SOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 4: This handbook is for guidance only and cannot be cited as a requirement. Contractor format acceptable.
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage16of41
1007/183

A017

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLESoftware Support Activity (SSA)
A017Software Requirements Specification (SRS)Requirements Documentation
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81433A NOT 1SOW Para: 3.1.2aNAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.1.111
Block 7: Acceptance will be by COR via the Data Item Transmittal/Acceptance Rejection Form (Attachment 4).
If this form has not been transmitted within 30 days of submission of the CDRL, the CDRL is considered accepted.
Blocks 10, 11, 12 & 13: Due 15 working days after requested.
Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.1.1 Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage17of41
1007/183

A018

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN 5000ATDP______TM ______Other _X _
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Engineering and Integration Support for Relative
Navigation Systems for Air Traffic ControlN00421-14-R-0085TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A018Interface Control Document (ICD)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-CMAN-81248ASOW Para: 3.1.2a, 3.1.9.1.2NAWCAD 4.11.1.1
7. DD 250 REQ9. DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
XXREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .