About this file

Attachment 1 QASP

View the file

Other files

File Type Posted
N00421-14-R-0085-01.doc DOC document
CDRLUpdated_Exhibit_A.xls XLS spreadsheet
Attachment_5-NMCI.doc DOC document
Attachment_P2_Workforce_Hour_Matrix.xls XLS spreadsheet
N00421-14-R-0085.doc DOC document
Attachment_3_OCI_List.docx DOCX document
Attachment_7_GFP.pdf PDF
Exhibit_A-CDRLs.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet.xls XLS spreadsheet
Attachment_2-_DD_Form_254.pdf PDF
Attachment_4_-_Data_Item_Xmittal_Form.doc DOC document
Attachment_P5_PastPerformanQuest.doc DOC document
Attachment_8_GFP_Form.pdf PDF
N0042114R0085_-_Relative_Navigation.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-14-R-0085 Attachment 1

N00421-14-R-0085 Attachment 1

Quality Assurance Surveillance Plan (QASP) for Air Traffic Control Division for Relative Navigation Support Single Award Task Order Contract 1.

Purpose

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Statement of Work (PBSOW) for technical and engineering services to support the Air Traffic Control (ATC) Division. The intent is to ensure that the Contractor performs in accordance with the performance metrics and the Government receives the quality of services for tasks ordered under the contract.

This contract requirement is for Relative Navigation Support services to support NAWCAD 4.11.1, St. Inigoes, MD. Specifically, the contractor provides pre- and post-material handling support for all of the team’s efforts at both on‑base and off‑base locations near St. Inigoes. In support of the electronic/communications mission of the team, the Material Receipt and Distribution Unit provides for the initial receipt and issuance of the equipment and other collateral services such as disposal functions. These services are primarily operated out of the Material Receipt and Distribution Unit facility, building 8115, at St. Inigoes, MD.

This Indefinite Delivery Indefinite Quantity (IDIQ) contract will consist of a Cost-Plus-Fixed-Fee (CPFF) CLIN for Labor and Cost CLINs for Material, Travel, and NMCI Services. The contract will be for a five year ordering period. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

2.

Authority

Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative.

3.

Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth in the contract. The QASP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4.

Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.4. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting service contract. The limitations of authority are contained in a written letter of appointment.

Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the ACOR, to assist in administering the contract. The ACOR will be appointed in the resulting task order. The limitations of authority are contained in a written letter of appointment.

5.

Responsibilities

The following Government resources shall have responsibility for the implementation of this QASP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer’s Representative (ACOR) – The ACOR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

6.

Methods of QA Surveillance a.

Contractor Performance Assessment Report System (CPARS) – The marketplace for contractor support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. This evaluation will be one determinant in exercising the subsequent option period. For this procurement, the Government will address the quality, schedule, cost control, management, regulatory compliance, and other important areas. As this information may affect future source selections throughout DoD, and future orders, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.

b.

QASP - The below listed methods of surveillance shall be used by the COR and the Government Project Leads in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided herein.

7.

Surveillance

Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor and Government Project Leads, while enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.

8.

Documentation

In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9.

Enclosures

Enclosure (1) – Performance Based Standards

Enclosure (2) - Incentives

Enclosure (3) - Surveillance Activity Checklist

PERFORMANCE STANDARDS

Required Service (Performance Requirements)

Standard (Performance Standards)/ Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance

(Quality Assurance) Incentives

Contract Program Management IAW SOW Para 3.1.1

The Contractor shall provide contract program management support IAW paragraph 3.1.1 of the PBSOW. Based upon feedback from the Government Project Leads and customer feedback, services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Carrier Suitability (CV) IAW SOW Para 3.2.1

The Contractor shall provide carrier suitability support IAW paragraph 3.2.1 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Systems Engineering, Acquisition and Technical Support.

IAW SOW Para 3.2.2

The Contractor shall provide systems engineering and acquisition and technical support IAW paragraph 3.2.2 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Technical Development Planning IAW SOW Para 3.2.3

The Contractor shall provide technical development support IAW paragraph 3.2.3 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Modeling and Simulation (M&S) Support for CV Suitability IAW SOW Para 3.2.4

The Contractor shall provide modeling and simulation support for CV suitability support IAW paragraph 3.2.4 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Certification Planning IAW SOW Para 3.2.5

The Contractor shall provide certification planning support IAW paragraph 3.2.5 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Test and Evaluation Support IAW SOW Para 3.2.6

The Contractor shall provide test and evaluation support services IAW paragraph 3.2.6 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Concept of Operations (CONOPS) Support IAW SOW Para 3.2.7

The Contractor shall provide concept of operations support services IAW paragraph 3.2.7 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Data Link (DL) Technology IAW SOW Para 3.2.8

The Contractor shall provide data link technology support services IAW paragraph 3.2.8 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

RelNav Landing Systems Requirements & Design Analysis IAW SOW Para 3.2.9

The Contractor shall provide RelNav landing systems requirements and design analysis support services IAW paragraph 3.2.9 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Design Integration

IAW SOW Para 3.2.10

The Contractor shall provide design integration support services IAW paragraph 3.2.10 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Ship Integration

IAW SOW Para 3.2.11

The Contractor shall provide ship integration support services IAW paragraph 3.2.11 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Aircraft Integration

IAW SOW Para 3.2.12

The Contractor shall provide aircraft integration support services IAW paragraph 3.2.12 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Program Management Support

IAW SOW Para 3.2.13

The Contractor shall provide program management support services IAW paragraph 3.2.13 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

Required Service (Performance Requirements)

Standard (Performance Standards)/ Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance

(Quality Assurance) Incentives

Security Requirements

IAW SOW Para 7.0

The Contractor shall provide security IAW paragraph 7.0 of the PBSOW. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by Government Project Leads and customer feedback
See Enclosure 2.

DATA STANDARDS

Description
Standard
AQL
Surveillance/

Method/Measure Incentives

Contractor’s Progress, Status and Management Report CDRL A001
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads.
See Enclosure 2.

Funds and Time Expenditure Report CDRL A002

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads.
See Enclosure 2.

Voucher Reconciliation Report CDRL A003

Submission is in accordance with the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads.
See Enclosure 2.

Briefing/Presentation Material CDRL A004

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Design Review Information Package (DRIP)

CDRL A005

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Systems Engineering Management Plan (SEMP) CDRL A006

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Operational Concept Description (OCD) CDRL A007

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Baseline Description Document CDRL A008

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Systems Requirements Document Guidance CDRL A009

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Performance Reporting & Integrated Master Schedules (STD) CDRL A010

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Description
Standard
AQL
Surveillance/

Method/Measure Incentives

Analyses of Alternatives (AOA) CDRL A011
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Acquisition Strategies CDRL A012
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Test and Evaluation Master Plan

CDRL A013

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.

Engineering Change Proposals CDRL A014

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Configuration Control Board (CCB) Documentation CDRL A015
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Software Support Activity (SSA) Requirements Documentation CDRL A016
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Interface Control Documents (ICD) CDRL A017
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Test and Evaluation Requirements CDRL A018
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Technology Readiness Assessment CDRL A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Analysis Reports CDRL A020
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2.
Recommendation Reports CDRL A021
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Description
Standard
AQL
Surveillance/

Method/Measure Incentives

Certification/Data Report CDRL A022
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Design Review Information Package (DRIP) CDRL A023
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2

Simulation Status Report CDRL A024

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Preparation of Test Reports CDRL A025
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Report, Record of Meeting/Minutes CDRL A026
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Integration Guide CDRL A027
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Training Conduct Support Document CDRL A028
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Risk Management Status Report CDRL A029
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Incurred Cost and Program Reporting for Services CDRL A030
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Material Status/ Tracking Report CDRL A031
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Trip Report CDRL A032
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2
Description
Standard
AQL
Surveillance/

Method/Measure Incentives

Operations Security (OPSEC) Plan CDRL A033

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See Enclosure 2

INCENTIVES

The following incentives shall apply to performance under this order.

Assessment Period
Acceptable Performance Definition
How Measured

Incentives

Ordering Period:

All measurement areas rated at least “Satisfactory”. See below.
Annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition.

(-) Does not meet the acceptable performance definition.

The following incentives shall apply to performance of the task orders under this order.

Assessment Period
Acceptable Performance Definition
How Measured
Incentives
Base:
None of the measurement areas are rated “Marginal: or below.

See below

Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 6 months.
(+) Meet the acceptable performance definition as a condition for further option exercises.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option 1.*

Option 1:
2 or more of the measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.

See below.

Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of an option 2.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option. 2.*

Option 2:
2 or more of the measurement areas rated “very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.

See below.

Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of an option 3.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option. 3.*

Option 3:
2 or more of the measurement areas rated “very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.

See below.

Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for exercise of an option 4.*

(-) Does not meet the acceptable performance definition as a condition for exercise of option. 4.*

Option 4:
2 or more of the measurement areas rated “very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.

See below.

Quarterly using the CPARS evaluation ratings; annually using the CPARS system covering the previous 12 months.
(+) Meets the acceptable performance definition as a condition for satisfactory or better final CPARS rating.*

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.*

* The government reserves the right to not exercise options unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All PBSOW/CDRL efforts will be assessed focusing on the following:

Quality– Assess the contractor’s conformance to contract/order requirements, specifications and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety and health standards). Include, as applicable, information on the following:

Are reports/data accurate?

Does the product or service provided meet the specifications of the contract/order?

Does the contractor’s work measure up to commonly accepted technical or professional standards?

What degree of Government technical direction was required to solve problems that arise during performance?

Schedule – Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance).

This evaluation of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the evaluation period that contribute to or affect the schedule variance. Also, address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

This element applies to contract/order closeout activities as well as contract/order performance. Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract/order schedule and should, therefore, be noted in the evaluation.

Questions to consider include the following:

Is the contractor completing the design/engineering services activities in a timely manner? This includes administrative activities, as well as meeting all scheduled milestones in the design process.

Did the contractor adequately schedule the work?

Has the contractor met administrative milestone dates?

Has the contractor met physical milestone dates specified by contract or agreed to in the project schedule?

If the schedule has slipped through the contractor’s fault or negligence, has he taken appropriate corrective action of his own volition?

Has the contractor furnished all required deliverables on or ahead of schedule?

Is the contractor completing the construction activities in a timely manner? This includes administrative activities, as well as physical construction activities such as submittal of a management response to Request for Proposal (RFPs), etc.

Has the contract furnished updated project schedules on a timely basis?

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract/order cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. For contracts/orders where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate task cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed. Include, as applicable, the following information:

Does the contractor keep within the total estimated cost (what is the relationship of the negotiated costs and budgeted costs to actuals)?

Did the contractor do anything innovative that resulted in cost savings?

Were billings current, accurate and complete?

Are the contractor’s budgetary internal controls adequate?

Has the contractor provided a design that can be constructed with the available funds?

Has the contractor notified the Government and taken necessary corrective actions when the cost estimate exceeds available funds?

Evaluation information regarding performance under an Undefinitized Contract Action (UCA), including letter contracts and actions where price has not yet been negotiated, shall be included in the annual evaluation. If the final negotiated contract/order type is not a cost-type, cost information for the period the UCA was in effect shall be included under the Cost Control element. If the final negotiated contract/order type is a cost-type, cost information for the entire period of performance shall be included under the Cost Control rating element. The narrative shall fully explain the contractor’s performance during the UCA, including definitization of the contract/order. The contractor’s performance under the UCA shall be separately identified but considered in the overall annual ratings.

Management – Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Include, as applicable, information on the following:

Is the contractor oriented toward the customer?

Is interaction between the contractor and the government satisfactory or does it need improvement?

Include the adequacy of the contractor’s accounting, billing, and estimating systems and the contractor’s management of Government Furnished Property (GFP) if a substantial amount of GFP has been provided to the contractor under the contract/order.

Address the timeliness of awards to subcontractors and management of subcontractors, including subcontract costs. Consider efforts taken to ensure early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance.

Assess the prime contractor’s effort devoted to managing subcontracts and whether subcontractors were an integral part of the contractor’s team.Are the contractor’s management, on-site, and home office personnel exhibiting the capacity to adequately plan, schedule, resource, organize and otherwise manage the work? If not, describe and relate to other rated elements.

Regulatory Compliance –

Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract. Consider questions such as the following:

Has the contractor complied with all contract clauses and reporting requirements (e.g., FAPIIS, FAR Subsection 9.104-6, FAR Clause 52.209-9)?

Has the contractor complied with Cost Accounting Standards and disclosure statements (FAR Subpart 30.2, FAR Clauses 52.230-2, 52.230-3, 52.230-4, 52.230-5, 52.230-6)?

Has the contractor complied with the reporting requirements relating to recovered material content utilized in contract performance (see FAR Subpart 23.4)?

Has the contractor complied with contractual safety requirements and labor laws (see FAR Subsection 22.407, FAR Clauses 52.222-4, 52.222-34, 52.222-20)?

Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production (FAR Subpart 42.302).

Has the contractor complied with Hazardous Material Identification and Material Safety Data (see FAR Subpart 23.3, FAR Clauses 52.223-3)?

Has the contractor complied with specifications or other contractual requirements requiring the delivery or use of environmentally preferable products, energy-efficient products, products containing recovered materials, and biobased products (FAR Subparts 23.2, 23.4, 23.7)? Monitor the contractor's environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract.

Has the contractor implemented an effective safety program; one which minimizes/mitigates potential accidents (FAR Subsection 36.513, FAR Clause 52.236-13)?

Is the contractor complying with affirmative action and EEO compliance requirements (see FAR Subpart 22.8, FAR Clauses 52.222-26, 52.222-27)?

Has the contractor complied with combating trafficking in persons (see FAR Subpart 22.17, FAR Clause 52.222-50)

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PBSOW paragraphs 3.1 through 3.7. The contractor shall be evaluated using the following ratings:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

QUALITY ASSURANCE SURVEILLANCE PLAN

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Management, Regulatory Compliance, and other applicable areas utilizing the CPARS evaluation rating definitions listed in Enclosure (2).

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Mgmt.
Regulatory Compliance

Other

Contract Program Management IAW SOW Para 3.1.1

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Carrier Suitability (CV) IAW SOW Para 3.2.1

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Systems Engineering, Acquisition and Technical Support.

IAW SOW Para 3.2.2

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Technical Development Planning IAW SOW Para 3.2.3

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Modeling and Simulation (M&S) Support for CV Suitability IAW SOW Para 3.2.4

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Certification Planning IAW SOW Para 3.2.5

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Test and Evaluation Support IAW SOW Para 3.2.6

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Concept of Operations (CONOPS) Support IAW SOW Para 3.2.7

Random inspection by COR or Government Project Lead Quarterly Input
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Mgmt.
Regulatory Compliance

Other

Data Link (DL) Technology IAW SOW Para 3.2.8

Random inspection by COR or Government Project Lead Quarterly Input
TBD

RelNav Landing Systems Requirements & Design Analysis IAW SOW Para 3.2.9

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Design Integration

IAW SOW Para 3.2.10

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Ship Integration

IAW SOW Para 3.2.11

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Aircraft Integration

IAW SOW Para 3.2.12

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Program Management Support

IAW SOW Para 3.2.13

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Security Requirements

IAW SOW Para 7.0

Random inspection by COR or Government Project Lead Quarterly Input
TBD

Quarterly Summary of Ratings:

Quality

Schedule

Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal

Number of Unsatisfactory

Cost Control

Management

Number of Exceptional

Regulatory Compliance

Other Areas

Number of Exceptional

Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (2). This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract, which will cover only the previous 6 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality
Review of Quarterly Ratings.
TBD
Schedule
Review of Quarterly Ratings.
TBD
Cost Control
Review of Quarterly Ratings.
TBD
Management
Review of Quarterly Ratings.
TBD
Regulatory Compliance
Review of Quarterly Ratings.
TBD
Other Areas
Review of Quarterly Ratings.
TBD

File details come from the government source that posted it. Updated .