1.3 1301276751 REVISED ITEM 0801 AC VFD REPAIRS PWS 25 Jul 2025.pdf
PDF 415 KB Posted
- Attached to
- C4 CASREP OEM CARRIER CORPORATION AC REPAIRS
- Solicitation number
- N0040625QS392
About this file
This document is a Performance Work Statement (PWS) for a naval contract concerning a 500 Ton AC Unit Variable Frequency Drive (VFD) Program. The work requires a contractor to inspect, troubleshoot, and repair a Carrier Transicold Model 19XRV5557387CRS64S R-134A Seawater Cooled Chiller located in the Auxiliary Machinery Room, involving one unit with two VFDs. Key requirements include re-programming the VFD by working with the ship's crew, bringing necessary Carrier software and equipment, ensuring both the primary and spare drives are correctly programmed, and conducting comprehensive testing to verify the AC unit's operational reliability. The contractor must provide a qualified VFD Programmer and Refrigeration Tech Representative, follow lock-out/tag-out procedures, and submit a PDF report detailing the "as released" condition of the AC Chiller and VFDs. The work is planned to be performed during availability periods in Costa Rica and Trinidad and Tobago, with the expectation that the AC Unit and VFD Programming technicians will be sent to both ports.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.3 25QS392-0001 SOL.pdf | ||
| 1.3 1301276751 ITEM 0801 AC VFD REPAIRS PWS.pdf | ||
| 4.0 25QS392 SOL_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AC Unit
ITEM NO. 0801 CATEGORY "A"
500T AC VFD Program
0801 - 1
1. ABSTRACT
1.1. This item describes the requirements for the contractor to inspect, troubleshoot and repair the 500 Ton AC Unit VFD Program.
2. REFERENCES/ENCLOSURES
2.1. References:
2.1.1. Tech Manual 404-J99-253, Carrier Transicold Model
19XRV5557387CRS64S R-134A Seawater Cooled Chiller Operating and Maintenance Manual
2.2. Enclosures: NONE
3. ITEM LOCATION/DESCRIPTION
3.1. Location/Quantity
3.1.1. Location: Auxiliary Machinery Room (6-84-0)
3.1.2. Quantity: (1 Unit), (2 VFDs)
3.2. Item Description/Manufacturer’s Data:
3.2.1. Manufacturer: Carrier
Model Number: 19XRV-5557387CRS64S, R-134A SEAWATER
COOLED CHILLER, 500 TONS NOMINAL COOLING CAPACITY
3.2.2. Variable Frequency Drive for Carrier 500 Ton Air
Conditioning, Unit Part # 19XRV5557937CR8648, MFR Rockwell / Reliance Electric, Part # 64LR4160-C503D
4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/ SERVICES: NONE
5. NOTES:
5.1. The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1-7, 22, 23, 28, and 29.
5.2. RESERVED
5.3. RESERVED
5.4. RESERVED
5.5. The contractor shall coordinate work performance during
the Costa Rica availability and Trinidad and Tobago availability with the MSC REP.
5.6. The Trinidad and Tobago availability is provided for any work that cannot be completed during the Costa Rica
AC Unit
ITEM NO. 0801 CATEGORY "A"
500T AC VFD Program
0801 - 2 availability. Assume AC Unit tech will get sent to both ports and VFD Programing Tech will be sent to Trinidad.
6. QUALITY ASSURANCE REQUIREMENTS: None
7. STATEMENT OF WORK
7.1. Re-Program VFD:
7.1.1. Work with Ship’s Crew to troubleshoot and repair VFD
for 500 Ton AC Unit.
7.1.2. Follow all Lock out/ Tag out requirements if needed.
7.1.3. Provide a qualified VFD Programmer and Refrigeration
Tech Rep to support this work.
7.1.4. Bring the necessary Carrier Software and download
onto VFD. Bring all tools and equipment necessary to download/ program software, example: laptop, software and cables.
7.2. Ensure spare drive on board has the correct program as
well. Download program onto spare drive if it does not.
7.3. Inspection/Test
7.3.1. The Tech Rep shall operationally test chiller unit
and adjust as necessary to bring the unit within OEM required parameters. To prove reliable operation, chiller unit will be run online for four hours upon completion of all work.
7.3.2. Test program and AC unit to the extent necessary to
ensure the entire system is working properly with new program. Tests will be to the satisfaction of the Chief Engineer.
7.3.3. Submit a report that includes “as released”
condition of the AC Chiller/ VFDs. Submit one electronic copy in Portable Document Format (PDF).
8. GENERAL REQUIREMENTS: NONE