N0040622R0003 Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Preventative and Corrective Maintenance On Isotta Fraschini Engines on Mine Countermeasure Ships (MCM)
- Solicitation number
- N0040622R0003
About this file
This solicitation requests proposals to provide preventative and corrective maintenance services on diesel engines that power Mine Countermeasure ships located in Japan and Bahrain. The contractor will be responsible for scheduled preventative maintenance, corrective maintenance identified during preventative maintenance checks, planned maintenance identified in ships' maintenance plans, engineering services including failure analysis and equipment improvement recommendations, and emergent repairs. The contractor must maintain facilities and inventory in Japan and Bahrain to support the work. The period of performance is one base year with four option years. Proposals are due by December 24, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22R0003 Amend 0007.pdf | ||
| 22R0003 Amend 0006.pdf | ||
| 22R0005 Amend 0005.pdf | ||
| 22R0003 Amend 0004.pdf | ||
| 22R0003 Amend 00003.pdf | ||
| 22R0003 Amend 00002.pdf | ||
| Amend 0001.pdf | ||
| N0040622ENGIDIQ Exhibits A-M.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C
D
EX
X G F 137 - 145
146 - 153 H 154 jeffrey.bulthuis@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 154
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00406 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JEFFERY S. BULTHUIS 360-476-7806
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 92
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
93 - 98 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
99 - 102 103 - 109
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 110 - 112 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
113 - 135
PART II - CONTRACT CLAUSES
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FLR
ATTN: JEFFREY BULTHUIS
BREMERTON WA 98314 360-476-7806
360-476-1115FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
22MCMIDIQ
5. DATE ISSUED
24 Nov 2021
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0040622R0003
Section A - Solicitation/Contract Form
NOTICE TO OFFEROR
1. This solicitation is for the procurement of maintenance support for Southwest Regional Maintenance Center (SWRMC) on board Mine Countermeasure -1 (MCM-1) Class vessels located in Sasebo Japan and Manama Bahrain. It is anticipated that this solicitation will result in single award Firm, Fixed-Price Supply type indefinite delivery/indefinite quantity contract.
2. The entire solicitation shall be filled out, signed, and returned as part of your quote. The proposal must be returned via email by 24 December 2021 2:00 PM Pacific Standard Time. The proposal shall be emailed to the address below:
Jeff Bulthuis Jeffrey.s.bulthuis.civ@us.navy.mil
And CC’d to
Homer Shoup homer.o.shoup.civ@us.navy.mil
3. The deadline for submission of questions regarding the solicitation’s terms, conditions, specifications, and performance work statement (PWS) is 10 days prior to the solicitation’s closing date.
4. SINGLE AWARD FOR ALL ITEMS: Due to the interrelationship of supplies and/or services to be provided hereunder, the Government reserves the right to make a single award.
5. “EXCEPTIONS: Please note all exceptions from the solicitation’s terms conditions, specifications, and/or the statement of work / performance work statement, if any. It will be assumed that any quote without mention of any exceptions will take no exception from all specifications, terms and conditions, clauses, or provisions within the solicitation.”
6. All questions in regards to this solicitation shall be submitted, via email, to the Contract Specialist listed below:
Jeff Bulthuis Jeffrey.s.bulthuis.civ@us.navy.mil
And CC’d to
Homer Shoup homer.o.shoup.civ@us.navy.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 12 Months Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Forward Deployed Regional Maintenance Center (FDRMC) Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
MILSTRIP: 22MCMIDIQ
PURCHASE REQUEST NUMBER: 22MCMIDIQ
PSC CD: J999
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 12 Months Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Japan Regional Maintenance Center (RMC) Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0003 1 Each Data in Support of CLINS 0001-0002
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423 Exhibits A
AND B)
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED
Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0004AA 3,833 Hours Straight Time Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0004AB 110 Hours Overtime Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED
Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
UNIT UNIT PRICE MAX AMOUNT
0005AA 3,833 Hours Straight Time Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0005AB 110 Hours Overtime Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14 FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0006 1 Each Data in Support of CLINS 0004-0005
FFP
BASE YEAR. Not Separately Priced (NSP).
(See DD Form 1423 Exhibits F, G, H, I, J, and K).
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0007 UNDEFINED
Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
0007AA 6,518 Hours Straight Time Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0007AB 1,100 Hours Overtime Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0008 UNDEFINED
Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
0008AA 6,518 Hours Straight Time Labor
FFP
BASE YEAR.
Corrective Maintenance and Planned Maintenance for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0008AB 1,100 Hours Overtime Labor
FFP
BASE YEAR.
Corrective Maintenance and Planned Maintenance for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0009 1 Each Data in Support of CLINS 0007-0008
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D, E, and L).
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0010 UNDEFINED
Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
0010AA 3,019 Hours Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM- 6, MCM-11, and MCM-13.
UNIT UNIT PRICE MAX AMOUNT
0010AB 1,485 Hours Overtime Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM- 6, MCM-11, and MCM-13.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0011 UNDEFINED
Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
UNIT UNIT PRICE MAX AMOUNT
0011AA 3,019 Hours Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
0011AB 1,485 Hours Overtime Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0012 1 Each Data in Support of CLINS 0010-0011
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D and E) FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0013 UNDEFINED Lot Travel - Bahrain
COST
BASE YEAR
Travel to/from Bahrain inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
MILSTRIP: 22MCMIDIQ
MAX COST
UNIT UNIT PRICE MAX AMOUNT
0014 UNDEFINED Lot Travel - Japan
COST
BASE YEAR.
Travel to/from Japan inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2, as amended. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0015 1 Lot Material for Bahrain
FFP
BASE YEAR.
Material in support of CLINs 0001, 0004, 0007, 0010, and 0017, performed at FDRMC Detachment Bahrain.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0016 1 Lot Material for Japan
FFP
BASE YEAR.
Material in support of CLINs 0002, 0005, 0008, 0011, and 0018, performed at Japan RMC Detachment Sasebo.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0017 UNDEFINED
Over and Above Work - Bahrain
FFP
BASE YEAR. The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
UNIT UNIT PRICE MAX AMOUNT
0017AA 3,377 Hours Straight Time Labor Over and Above Work
FFP
BASE YEAR.
Straight Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0017AB 338 Hours Overtime Labor Over and Above Work
FFP
BASE YEAR.
Over Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0018 UNDEFINED
Over and Above Work - Japan
FFP
BASE YEAR. The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
UNIT UNIT PRICE MAX AMOUNT
0018AA 3,377 Hours Straight Time Labor Over and Above Work
FFP
BASE YEAR.
Straight Time Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0018AB 338 Hours Overtime Labor Over and Above Work
FFP
BASE YEAR.
Overtime Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
0019 1 Each Data in Support of CLINS 0017-0018
FFP
BASE YEAR. Not Separately Priced (NSP). Price included in the price of 0017- 0018.
(See DD Form 1423. Exhibit C).
FOB: Destination
MILSTRIP: 22MCMIDIQ
UNIT UNIT PRICE MAX AMOUNT
1001 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Forward Deployed Regional Maintenance Center (FDRMC) Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1002 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Japan Regional Maintenance Center (RMC) Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1003 1 Each OPTION Data in Support of CLINS 1001-1002
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423 Exhibits A
AND B)
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1004 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
UNIT UNIT PRICE MAX AMOUNT
1004AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1004AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1005 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
UNIT UNIT PRICE MAX AMOUNT
1005AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
OPTION YEAR ONE.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1005AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
OPTION YEAR ONE.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14 FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1006 1 Each OPTION Data in Support of CLINS 1004-1005
FFP
BASE YEAR. Not Separately Priced (NSP).
(See DD Form 1423 Exhibits F, G, H, I, J, and K).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1007 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
1007AA 6,518 Hours OPTION Straight Time Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1007AB 1,100 Hours OPTION Overtime Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1008 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
1008AA 6,518 Hours OPTION Straight Time Labor
FFP
OPTION YEAR ONE.
UNIT UNIT PRICE MAX AMOUNT
1008AB 1,100 Hours OPTION Overtime Labor
FFP
OPTION YEAR ONE.
Corrective Maintenance and Planned Maintenance for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1009 1 Each OPTION Data in Support of CLINS 1007-1008
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D, E, and L).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1010 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13. See Exhibit C.
UNIT UNIT PRICE MAX AMOUNT
1010AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM-
UNIT UNIT PRICE MAX AMOUNT
1010AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM- 6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1011 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
UNIT UNIT PRICE MAX AMOUNT
1011AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
UNIT UNIT PRICE MAX AMOUNT
1011AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
OPTION YEAR ONE.
Emergent Repairs Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1012 1 Each OPTION Data in Support of CLINS 1010-1011
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D and E) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1013 UNDEFINED Lot OPTION Travel - Bahrain
COST
BASE YEAR
Travel to/from Bahrain inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1014 UNDEFINED Lot OPTION Travel - Japan
COST
BASE YEAR.
Travel to/from Japan inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2, as amended. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1015 1 Lot OPTION Material for Bahrain
FFP
BASE YEAR.
Material in support of CLINs 0001, 0004, 0007, 0010, and 0017, performed at FDRMC Detachment Bahrain.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1016 1 Lot OPTION Material for Japan
FFP
BASE YEAR.
Material in support of CLINs 0002, 0005, 0008, 0011, and 0018, performed at Japan RMC Detachment Sasebo.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1017 UNDEFINED
OPTION Over and Above Work - Bahrain
FFP
OPTION YEAR ONE. The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
UNIT UNIT PRICE MAX AMOUNT
1017AA 3,377 Hours OPTION Straight Time Labor Over and Above Work
FFP
OPTION YEAR ONE.
Straight Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1017AB 338 Hours OPTION Overtime Labor Over and Above Work
FFP
OPTION YEAR ONE.
Over Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1018 UNDEFINED
OPTION Over and Above Work - Japan
FFP
OPTION YEAR ONE. The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting
UNIT UNIT PRICE MAX AMOUNT
1018AA 3,377 Hours OPTION Straight Time Labor Over and Above Work
FFP
OPTION YEAR ONE.
Straight Time Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1018AB 338 Hours OPTION Overtime Labor Over and Above Work
FFP
OPTION YEAR ONE.
Overtime Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1019 1 Each OPTION Data in Support of CLINS 1017-1018
FFP
OPTION YEAR ONE. Not Separately Priced (NSP). Price included in the price of 1017-1018. (See DD Form 1423. Exhibit C).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2001 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Forward Deployed Regional Maintenance Center (FDRMC) Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2002 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Japan Regional Maintenance Center (RMC) Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2003 1 Each OPTION Data in Support of CLINS 2001-3002
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423 Exhibits A
AND B)
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2004 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for FDRMC Detachment Bahrain for
UNIT UNIT PRICE MAX AMOUNT
2004AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2004AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2005 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC
UNIT UNIT PRICE MAX AMOUNT
2005AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
OPTION YEAR TWO.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2005AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
OPTION YEAR TWO.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14 FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2006 1 Each OPTION Data in Support of CLINS 2004-2005
FFP
BASE YEAR. Not Separately Priced (NSP).
(See DD Form 1423 Exhibits F, G, H, I, J, and K).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2007 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and
UNIT UNIT PRICE MAX AMOUNT
2007AA 6,518 Hours OPTION Straight Time Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2007AB 1,100 Hours OPTION Overtime Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2008 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and
UNIT UNIT PRICE MAX AMOUNT
2008AA 6,518 Hours OPTION Straight Time Labor
FFP
OPTION YEAR TWO.
UNIT UNIT PRICE MAX AMOUNT
2008AB 1,100 Hours OPTION Overtime Labor
FFP
OPTION YEAR TWO.
Corrective Maintenance and Planned Maintenance for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2009 1 Each OPTION Data in Support of CLINS 2007-2008
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D, E, and L).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2010 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5, as amended. Engineering Support for FDRMC Detachment
UNIT UNIT PRICE MAX AMOUNT
2010AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM-
UNIT UNIT PRICE MAX AMOUNT
2010AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM- 6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2011 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5. Engineering Support for Japan RMC Detachment Sasebo for
UNIT UNIT PRICE MAX AMOUNT
2011AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
UNIT UNIT PRICE MAX AMOUNT
2011AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
OPTION YEAR TWO.
Emergent Repairs Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2012 1 Each OPTION Data in Support of CLINS 2010-2011
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D and E) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2013 UNDEFINED Lot OPTION Travel - Bahrain
COST
BASE YEAR
Travel to/from Bahrain inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2014 UNDEFINED Lot OPTION Travel - Japan
COST
BASE YEAR.
Travel to/from Japan inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2, as amended. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2015 1 Lot OPTION Material for Bahrain
FFP
BASE YEAR.
Material in support of CLINs 0001, 0004, 0007, 0010, and 0017, performed at FDRMC Detachment Bahrain.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2016 1 Lot OPTION Material for Japan
FFP
BASE YEAR.
Material in support of CLINs 0002, 0005, 0008, 0011, and 0018, performed at Japan RMC Detachment Sasebo.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2017 UNDEFINED
OPTION Over and Above Work - Bahrain
FFP
OPTION YEAR TWO. The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting
UNIT UNIT PRICE MAX AMOUNT
2017AA 3,377 Hours OPTION Straight Time Labor Over and Above Work
FFP
OPTION YEAR TWO.
Straight Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2017AB 338 Hours OPTION Overtime Labor Over and Above Work
FFP
OPTION YEAR TWO.
Over Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2018 UNDEFINED
OPTION Over and Above Work - Japan
FFP
OPTION YEAR TWO. The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting
UNIT UNIT PRICE MAX AMOUNT
2018AA 3,377 Hours OPTION Straight Time Labor Over and Above Work
FFP
OPTION YEAR TWO.
Straight Time Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2018AB 338 Hours OPTION Overtime Labor Over and Above Work
FFP
OPTION YEAR TWO.
Overtime Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2019 1 Each OPTION Data in Support of CLINS 2017-2018
FFP
OPTION YEAR TWO. Not Separately Priced (NSP). Price included in the price of 2017-2018. (See DD Form 1423. Exhibit C).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3001 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Forward Deployed Regional Maintenance Center (FDRMC) Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3002 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Japan Regional Maintenance Center (RMC) Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3003 1 Each OPTION Data in Support of CLINS 3001-3002
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423 Exhibits A
AND B)
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3004 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for FDRMC Detachment Bahrain for
UNIT UNIT PRICE MAX AMOUNT
3004AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3004AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3005 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC
UNIT UNIT PRICE MAX AMOUNT
3005AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
OPTION YEAR THREE.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3005AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
OPTION YEAR THREE.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14 FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3006 1 Each OPTION Data in Support of CLINS 3004-3005
FFP
BASE YEAR. Not Separately Priced (NSP).
(See DD Form 1423 Exhibits F, G, H, I, J, and K).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3007 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and
UNIT UNIT PRICE MAX AMOUNT
3007AA 6,518 Hours OPTION Straight Time Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3007AB 1,100 Hours OPTION Overtime Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3008 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and
UNIT UNIT PRICE MAX AMOUNT
3008AA 6,518 Hours OPTION Straight Time Labor
FFP
OPTION YEAR THREE.
UNIT UNIT PRICE MAX AMOUNT
3008AB 1,100 Hours OPTION Overtime Labor
FFP
OPTION YEAR THREE.
Corrective Maintenance and Planned Maintenance for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3009 1 Each OPTION Data in Support of CLINS 3007-3008
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D, E, and L).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3010 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5, as amended. Engineering Support for FDRMC Detachment
UNIT UNIT PRICE MAX AMOUNT
3010AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM-
UNIT UNIT PRICE MAX AMOUNT
3010AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM- 6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3011 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5. Engineering Support for Japan RMC Detachment Sasebo for
UNIT UNIT PRICE MAX AMOUNT
3011AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
UNIT UNIT PRICE MAX AMOUNT
3011AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
OPTION YEAR THREE.
Emergent Repairs Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3012 1 Each OPTION Data in Support of CLINS 3010-3011
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D and E) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3013 UNDEFINED Lot OPTION Travel - Bahrain
COST
BASE YEAR
Travel to/from Bahrain inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3014 UNDEFINED Lot OPTION Travel - Japan
COST
BASE YEAR.
Travel to/from Japan inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2, as amended. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3015 1 Lot OPTION Material for Bahrain
FFP
BASE YEAR.
Material in support of CLINs 0001, 0004, 0007, 0010, and 0017, performed at FDRMC Detachment Bahrain.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3016 1 Lot OPTION Material for Japan
FFP
BASE YEAR.
Material in support of CLINs 0002, 0005, 0008, 0011, and 0018, performed at Japan RMC Detachment Sasebo.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOTAL MATERIAL
(Estimated Materials plus Material Handling Cost) (fill in number) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3017 UNDEFINED
OPTION Over and Above Work - Bahrain
FFP
OPTION YEAR THREE. The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
UNIT UNIT PRICE MAX AMOUNT
3017AA 3,377 Hours OPTION Straight Time Labor Over and Above Work
FFP
OPTION YEAR THREE.
Straight Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3017AB 338 Hours OPTION Overtime Labor Over and Above Work
FFP
OPTION YEAR THREE.
Over Time Labor Rates for Over and Above Work - Bahrain The work called for under this item shall be accomplished in Bahrain when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3018 UNDEFINED
OPTION Over and Above Work - Japan
FFP
OPTION YEAR THREE. The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
UNIT UNIT PRICE MAX AMOUNT
3018AA 3,377 Hours OPTION Straight Time Labor Over and Above Work
FFP
OPTION YEAR THREE.
Straight Time Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3018AB 338 Hours OPTION Overtime Labor Over and Above Work
FFP
OPTION YEAR THREE.
Overtime Labor Rates for Over and Above Work - Japan The work called for under this item shall be accomplished in Japan when required by the orders issued by the Administrative Contracting Officer in accordance with DFARS 252.217-7028, Over and Above Work.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3019 1 Each OPTION Data in Support of CLINS 0017-0018
FFP
OPTION YEAR THREE. Not Separately Priced (NSP). Price included in the price of 3017-3018. (See DD Form 1423. Exhibit C).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4001 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Forward Deployed Regional Maintenance Center (FDRMC) Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4002 12 Months OPTION Preventive Maintenance Services (PMS)
FFP
BASE YEAR.
Prepare for and accomplish Preventive Maintenance Services (PMS) in accordance with (IAW) Section C, Statement of Work paragraph 3.2. PMS support for Japan Regional Maintenance Center (RMC) Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4003 1 Each OPTION Data in Support of CLINS 4001-4002
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423 Exhibits A
AND B)
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4004 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for FDRMC Detachment Bahrain for
UNIT UNIT PRICE MAX AMOUNT
4004AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4004AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
BASE YEAR.
Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-
11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4005 UNDEFINED
OPTION Engineering Services
FFP
BASE YEAR.
Prepare for and accomplish Engineering Services IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC
UNIT UNIT PRICE MAX AMOUNT
4005AA 3,833 Hours OPTION Straight Time Labor Engineering Services
FFP
OPTION YEAR FOUR.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4005AB 110 Hours OPTION Overtime Labor Engineering Services
FFP
OPTION YEAR FOUR.
Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14 FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4006 1 Each OPTION Data in Support of CLINS 4004-4005
FFP
BASE YEAR. Not Separately Priced (NSP).
(See DD Form 1423 Exhibits F, G, H, I, J, and K).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4007 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4, as amended. Engineering Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and
UNIT UNIT PRICE MAX AMOUNT
4007AA 6,518 Hours OPTION Straight Time Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4007AB 1,100 Hours OPTION Overtime Labor
FFP
BASE YEAR.
Corrective and Planned Maintenance Support for FDRMC Detachment Bahrain for MCM-3, MCM-6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4008 UNDEFINED
OPTION Corrective and Planned Maintenance
FFP
BASE YEAR.
Prepare for and accomplish Corrective Maintenance and Planned Maintenance IAW Section C, Statement of Work paragraph 3.4. Engineering Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and
UNIT UNIT PRICE MAX AMOUNT
4008AA 6,518 Hours OPTION Straight Time Labor
FFP
OPTION YEAR FOUR.
UNIT UNIT PRICE MAX AMOUNT
4008AB 1,100 Hours OPTION Overtime Labor
FFP
OPTION YEAR FOUR.
Corrective Maintenance and Planned Maintenance for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4009 1 Each OPTION Data in Support of CLINS 4007-4008
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D, E, and L).
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4010 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5, as amended. Engineering Support for FDRMC Detachment
UNIT UNIT PRICE MAX AMOUNT
4010AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM-
UNIT UNIT PRICE MAX AMOUNT
4010AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
BASE YEAR.
Emergent Repairs Support for FDRMC Detachment Bahrain for MCM-3, MCM- 6, MCM-11, and MCM-13.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4011 UNDEFINED
OPTION Emergent Repairs
FFP
BASE YEAR.
Prepare for and accomplish Emergent Repairs IAW Section C, Statement of Work paragraph 3.5. Engineering Support for Japan RMC Detachment Sasebo for
UNIT UNIT PRICE MAX AMOUNT
4011AA 3,019 Hours OPTION Straight Time Labor Emergent Repairs
FFP
BASE YEAR.
UNIT UNIT PRICE MAX AMOUNT
4011AB 1,485 Hours OPTION Overtime Labor Emergent Repairs
FFP
OPTION YEAR FOUR.
Emergent Repairs Support for Japan RMC Detachment Sasebo for MCM-7, MCM-9, MCM-10, and MCM-14.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4012 1 Each OPTION Data in Support of CLINS 4010-4011
FFP
BASE YEAR. Not Separately Priced (NSP). (See DD Form 1423. Exhibits D and E) FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4013 UNDEFINED Lot OPTION Travel - Bahrain
COST
BASE YEAR
Travel to/from Bahrain inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4014 UNDEFINED Lot OPTION Travel - Japan
COST
BASE YEAR.
Travel to/from Japan inclusive of per diem in accordance with Section C Statement of Work paragraph 6.2, as amended. Actual travel will be reimbursed in accordance with Joint Travel Regulations. Cost of travel shall not exceed $42,616. Each trip shall be approved by the COR and incrementally funded prior to travel taking place.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4015 1 Lot OPTION Material for Bahrain
FFP
BASE YEAR.
Material in support of CLINs 0001, 0004, 0007, 0010, and 0017, performed at FDRMC Detachment Bahrain.
Estimated Materials (including subcontracts) (fill in number) Material Handling Rate (if applicable) (fill in number) Material Handling Cost (Estimated Materials multiplied by Material Handling Rate) (fill in number)
TOT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .