N0040620R0023 Solicitation Amendment 3.pdf
PDF 945 KB Posted
- Attached to
- Logistics and Ammunition Support Federal contract opportunity
- Solicitation number
- N0040620R0023
About this file
This solicitation requests proposals for a firm fixed price service contract to provide logistics support services and ammunition storage administration/support services at Naval Base Kitsap in Bangor, Washington. The services include warehouse support, logistics support, and ammunition handling and storage support. The period of performance is a ten-month base period with a 30-day transition period, followed by four one-year options and a six-month option. This requirement is set aside 100% for small businesses. Electronic submissions are not available through betaSAM; proposals must be emailed to the points of contact by the response date. The incumbent is BAE Systems under contract number N0040618F3000.
The document also includes questions and answers providing clarification on requirements such as facility locations, the incumbent contract, labor categories, and past performance evaluation. An attachment lists facilities for inspection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0040620R0023 Solicitation Amendment 2.pdf | ||
| N0040620R0023 Solicitation Amendment 1.pdf | ||
| Attachment 6. PAST PERFORMANCE QUESTIONAIRE.docx | DOCX document | |
| Attachment 5. CONTRACTOR PERFORMANCE DATA SHEET FOR PAST PERFORMANCE.docx | DOCX document | |
| Attachment 2. Wage Determination 2015-5526.pdf | ||
| Attachment 8. Cost Summary Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 1. Contract Data Requirements List (CDRL) List.docx | DOCX document | |
| Attachment 3. DD Form 254.pdf | ||
| Attachment 7. Staffing and Equipment Plan Worksheet TSSP - SWFPAC Logistics Contract.xls | XLS spreadsheet | |
| Attachment 4. Visitor Group Security Agreement (VGSA).docx | DOCX document | |
| N0040620R0023 Solicitation.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0040620R0023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is being done to:
1. Update the questions and answ ers.
2. Add a verbal Site Map to Section J.
3. Extend the Close date to 07 January 2021 01:00 PM PST.
--End of Changes
The POC's for this amendment is Chastity Cow ans EMAIL: chastity.t.cow ans1@navy.mil and James Wasson EMAIL: james.w asson@navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040620R0023
X 9B. DATED (SEE ITEM 11)
04-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Dec-2020
CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FLR
ATTN: CHASTITY COWANS
BREMERTON WA 98314
N00406 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION SF30 - CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 04-Jan-2021 08:00 AM to 07-Jan-2021 01:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENT
The following have been added by full text:
VERBAL SITE MAP
Verbal Site Map
Strategic Weapons Facility Pacific (SWFPAC) and Marine Corps Security Force Battalion (MCSFBN) Bangor, are located on Naval Base Kitsap Bangor in Silverdale Washington.
Naval Base Kitsap Bangor is commonly divided between “Upper Base” and “Lower Base”. Facilities located on “Upper Base” require only Base access, ”Lower Base” access to facilities requires additional Badging requirements to Restricted Areas and SWFPAC Areas of Responsibility (AOR)
MCSFBN Headquarters Building 2102: Located on “Upper Base”. Located here; Active Duty office spaces, MILES Storage (Garage Bay), the Main Armory BLD 2105, and the GSA Motor Transport Dispatch / Parking Area.
MCSFBN Logistics Building 2106: Located on “Upper Base”. Located here; two (Marine and Navy) Individual Equipment Issue points with shelving to store and issue individual equipment. Each Issue point has a small office which can accommodate up to four warehouse personnel. Four garage bays allow temporary storage of incoming and outgoing equipment. A common area with cubicles which provide desks and work stations for Contractor personnel in Facilities, Supply Admin, Ammunition and an office area for Project Manager.
Additional Equipment Storage: Several facilities are located on lower base to provide storage for individual equipment and facility consumables.
Ammunition and Explosive (A&E) Magazines: Located on lower base.
- Contractor (A&E) Magazines: Two large igloo, earth covered Magazines with loading docks located approximately 10 minutes from the MCSFBN Logistics Building 2106. Each Magazine can store approximately twenty (20) pallets of ammunition in two rows, spaced per requirements.
- Additional Contractor (A&E) Magazines: Seven small Igloo earth covered Magazines with loading docks, each Magazine can store approximately six (6) pallets of ammunition. These Magazines are located approximately 20 minutes from the MCSFBN Logistics Building 2106. Note: Access to these Magazines can be limited by road closers for operations.
Note: The large igloo, earth covered Magazines are the primary ammunition storage and receiving Magazines. Ammunition and Explosive Transport requirements will normally start from the two large igloo Magazines.
Facilities: Per Enclosure 1 Facility List. The fifty-five facilities are divided between “Upper Base” Base and two AORs on “Lower Base”.
- Upper Base: MCSFBN Headquarters Building 2102, MCSFBN Logistics Building 2106, and Barracks.
- Lower Base AOR 1: One facility provides berthing for up to 150 personnel, office spaces, and a Galley, the remaining facilities are guard towers or “deployed sites” which provide berthing for no more than 10 personnel, a bathroom, and lounge area. All facilities can be inspected in AOR 1, in no more than four, eight hour days.
- Lower Base AOR 2: Two facilities provide berthing for up to 150 personnel, office spaces, and a Galley, the remaining facilities are guard towers or “deployed sites” which provide berthing to no more than 10 personnel, a bathroom, and lounge area. All facilities can be inspected in AOR 2, in no more than four, eight hour days.
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS
The following have been modified:
ADDENDUM 52.212-1
SECTION L- PROPOSAL SUBMITTAL REQUIREMENTS (FFP BEST-VALUE TRADE-OFF)
INSTRUCTIONS TO OFFEROR(S)
I. GENERAL
Definitions: As used in this provision –
In writing or written means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation’s closing date-and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and Federal legal holidays. However, if the last day falls on a Saturday, Sunday, or Federal legal holiday, then the period shall include the next working day.
II. SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS.
Electronic Submission: Proposals and revisions of proposals shall be emailed to chastity.t.cowans1@navy.mil and james.wasson@navy.mil or uploaded electronically in Beta.Sam under the appropriate solicitation number and its latest amendment (if any). In the event that Beta.Sam is not operational, experiences technical difficulties, or an Offeror is temporarily unable to access or use the portal, the Offeror shall immediately notify the PCO.
Offeror’s proposal shall be in the form prescribed by, and shall contain a response to each of the areas identified in, this solicitation section. The following instructions are provided in addition to instructions to Offerors contained elsewhere in this solicitation.
Modification/Revision: Any proposal modification or revision not received by the Contract Specialist / Contracting Officer by the exact time specified for receipt of offers is “late” and will not be considered. The solicitation will close at the exact date and time specified in the solicitation and Offerors will be unable to submit their proposal after that time.
Withdrawal: Proposals may be withdrawn by written notice to the Contracting Officer provided such notice is received prior to award.
Amendments to the solicitation: If this solicitation is amended all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
Offer expiration date: Proposals in response to this solicitation shall be valid for 180 calendar days.
The Offeror must propose to provide all services in order to be deemed responsive to this solicitation.
Offerors shall submit their proposals in four (4) separate volumes as follows:
o Volume I Technical Capability & Experience o Volume II Past Performance o Volume III Price Proposal o Volume IV Contract Information
Offerors shall also include the following:
Solicitation cover sheet with appropriate blocks completed by the Offeror.
Acknowledgement of solicitation amendments pursuant to FAR 52.215-1 (if not previously provided).
Representations and Certifications completed by the Offeror in accordance with instructions contained elsewhere in this solicitation. If the Offeror has completed all of the representations and certifications required by this solicitation in SAM (www.sam.gov) in accordance with FAR 52.204-8 and DFARS 252.204-7007 ALT A, then the Offeror need not submit the hardcopy Representations and Certifications.
The proposal shall be limited to the following submissions and pages:
Offerors shall include the following in Volume I:
Technical Sub-elements 1 thru 7: No Page Limit Staffing Plan Worksheet (Attachment 7) - 2 Page Limit Management Plan - 14 Page Limit
Offerors shall include the following in Volume II:
Recent and Relevant Past Performance Questionnaires (Attachment 6): Minimum of three
(3) required.
Previous Contracting Effort Narrative (Attachment 5): Minimum of three (3) references for the Prime.
Offerors shall include the following in Volume III:
Section J Pricing (provided within Section J of the RFP)
Offerors shall include the following in Volume IV:
Cover/Forwarding Letter: 2-Page Limit
The completion and submission of the above items will constitute an offer (proposal) and will be considered the Offeror’s unconditional assent to the terms and conditions of this solicitation and any attachments and/or exhibits hereto. Offerors shall respond to all requirements of the solicitation document. Offerors are cautioned not to alter the solicitation. Any affirmative exception to the material terms and conditions of the solicitation will render the offer ineligible for award. Alternate proposals are not authorized.
The entire completed and signed solicitation shall be returned as part of your offer in accordance with FAR 52.212-1, Instructions to Offerors – Competitive Acquisition, and the clause entitled "Proposal Submittal
Requirements". Also, be sure to complete all representations and certifications in the solicitation. If using SAM, complete any representations and certifications for provisions in the solicitation that are not included in SAM.
Complete block 12 on SF 33 if providing more time for acceptance of offer.
The date and closing time for receipt of offers for this solicitation is provided in block 9 on the Standard Form 1449. Offers shall be submitted electronically to chastity.cowans@navy.mil and james.wasson@navy.mil.
Each proposal package shall be prominently marked with the following notation:
SOLICITATION NUMBER: N0040620R0023
III. REQUIREMENTS FOR PROPOSAL CONTENT
This section specifies the format that Offerors should use in proposals submitted in response to this solicitation.
The intent is not to restrict the Offerors in the manner in which they will perform their work but rather to ensure a certain degree of uniformity in the format of the proposals for evaluation purposes.
1. Each volume should contain the following items in addition to the other information required by this solicitation:
Cover:
Title of the proposal Volume Number Solicitation number Name and address of Offeror Contractor Point of Contact (POC) with POC’s email address and phone number.
DUNS and CAGE of Offeror.
Contractor POC signature Table of Contents: The table of contents should provide detail sufficient to allow the important elements to be easily located.
2. Proposal Format: In order to maximize efficiency and minimize the time for proposal evaluation, it is required that all Offerors shall submit their proposals in accordance with the format and content specified. The electronic proposal shall be prepared so that if printed, the proposal meets the following format requirements:
8.5 x 11 inch paper Single-spaced typed lines No graphics or pictures other than graphs/tables/charts as required or necessary Tables/Graphs/Charts are allowed for the staffing plan 1 inch margins 12-point Times New Roman Font text No hyperlinks Microsoft Office (Word and Excel) and or PDF format; (11 x 17 is acceptable for increased legibility) All supporting Price Data shall be provided in Microsoft Excel software, with all files named with the file extension xls/xlsx.
Instructions regarding use of certain electronic products (i.e., Microsoft Office, Excel) listed herein shall not be construed as Government endorsement of specified products.
Any other attached documents requested herein shall be compatible with Microsoft Office format.
The font size for text contained in embedded graphics (tables and illustrations) shall be no smaller than 8 point Times New Roman font.
3. Page Limitations: Page limitations are identified for each volume/section of the proposal, as described in paragraph II above and will be treated as maximums. If exceeded, excess pages will not be read or considered in proposal evaluation. When both sides of a sheet display printed material, it shall be counted as two pages.
Graphs, charts, and tables are included in the page count. The following are not included in the page limitations:
Title/Cover pages Tables of contents Glossaries of abbreviations and acronyms Proposal Cross-Reference Tables
4. Cover Page, Table of Contents, Proposal Cross-Reference Table: Each proposal volume must include a Cover Page and a Table of Contents. The Cover Page shall identify the solicitation number, amendment number, proposal volume and title, and the Offeror’s name. Volume I shall include a Master Table of Contents and a Proposal Cross-Reference Table. The Proposal Cross-Reference Table shall indicate the required proposal content and the section/page number where this content appears in the proposal. Cover Pages, Tables of Contents, and the Proposal Cross-Reference Table will not count against page limitations.
5. Glossary of Abbreviations and Acronyms: Each volume shall contain a glossary which includes all abbreviations, acronyms and their corresponding definitions. Glossaries will not count against page limitations.
6. Pricing Information: No pricing information of any kind shall be included in any volume except Volume III, Price Proposal. Offerors must submit all price- related documentation required for Volume III. Price summary and back-up spreadsheets must be submitted in MS Excel format.
Additional Notes: If there are any discrepancies between the pricing submitted in Section J and the price-related backup/summary documentation, the Offeror's Section J pricing will take precedence.
THE GOVERNMENT RESERVES THE RIGHT TO REJECT ANY PROPOSAL THAT DOES NOT COMPLY
WITH THESE PROPOSAL PREPARATION/SUBMISSION INSTRUCTIONS.
Due to the nature and scope of the work encompassed by this solicitation, the Government requires that there be no conflict which would preclude the prime contractor from performing any portion of the Performance Work Statement (PWS), regardless of whether it intends to subcontract that portion. Due to the nature of the work outlined in Section C, the Government anticipates that organizational conflicts of interest (OCIs), including impaired objectivity OCIs, will NOT arise for offerors that perform under other contracts within the cognizance as prime contractor or subcontractor for logistic and facilities support services that will be covered by this solicitation.
IV. PROPOSAL CONTENT
(1) Volume I – Technical Capability & Experience
Volume I of the proposal shall include all information required for the evaluation of the Offeror’s technical capability and experience. It shall exclude any reference to the price aspects of the proposal.
Technical SubFactors:
SUBFACTOR A: Solicitation Compliance The completion and submission to the Government of an offer shall indicate the Offeror’s unconditional agreement to the terms and conditions in this solicitation.
Unless otherwise allowed, all questions shall be submitted by 4:30PM PST, 7 calendar days before the proposal due date of solicitation, as time may not permit responses to questions received after that time. Any exception or questions and answers not approved by the Contracting Officer by amendment to the solicitation may result in the proposal being rejected and void.
SUBFACTOR B: Technical Capabilities and Experience.
The offeror shall demonstrate specific knowledge, capability and relevant experience (Prime and Subcontractor) to perform the tasks in accordance with the Performance Work Statement. The capabilities and experience proposed shall demonstrate: their ability to support all requirements of the PWS; their understanding of the inter-dependencies/inter-relationships of the programs; and their ability to hire and retain personnel capable of meeting current as well as future requirements.
Sub-elements 1 – 7:
1. Facility: Conducting facility inspections to include safety and fire: Provide relevant experience conducting facility inspections to include safety and fire. Provide any relevant certifications and training completed, (See PWS paragraph 6.4)
2. Armory Support Services: Provide relevant experience demonstrating knowledge and execution of Armory weapon and collateral equipment inventories, issue, return, and management. (See PWS paragraph 9.0)
3. Ammunition and Explosives (A&E) Storage and Accountability: Provide relevant experience demonstrating knowledge and execution of Ammunition and Explosives (A&E) Storage and Accountability. (PWS 9.0)
4. Armory, Ammunition and Explosives (A&E) Qualification/Certification Program: Provide knowledge and ability to execute a standalone Qualification/Certification Program per OPNAVINST 8023.24C for Armory Support Services and Ammunition and Explosives (A&E). (See PWS 9.2.2 and 9.2.3) Include relative experience and Certification of the Chair. (See OPNAVINST 8023.24C)
5. Care of Material In Storage (COMIS): Provide relevant experience demonstrating knowledge and execution Care of Material In Storage (COMIS). (See PWS 10.13 and P-284, Storage and Material Handling and P-285, NAVSUP Management Handbook)
6. Property Control and Accountability Plan: Provide examples of Property Control and Accountability Plan and the inventory control program to be utilized. Individual Gear (PWS 10.0), CBR (PWS 10.3) and MILES (PWS 12.0).
7. Vehicle/Fleet Management to include both standard and special use vehicles and equipment: Provide relevant experience demonstrating knowledge and capability of performing Vehicle/Fleet Management to include both standard and special use vehicles and equipment. (See PWS paragraph 11.0).
SUBFACTOR C: Staffing Plan.
Offerors shall submit a proposed Staffing and Equipment Plan (See section J of solicitation for equipment plan worksheet) that includes the following details: number of employees required to accomplish the work in accordance with the PWS broken down by job title, including the number of A&E drivers to be utilized (minimum six), and a description of equipment that will be used to transport, handle, and support ammunition movements.
The Offeror shall demonstrate that its proposed personnel possess the requisite skills, knowledge, experience, and expertise outlined in the Performance Work Statement for each type of personnel required. Key personnel should be subject matter experts in the field they are being proposed for and possess the capability necessary to meet the requirements of the PWS.
The Staffing plan must identify the following information for the candidates identified to meet this requirement.
1. Name/Citizenship/Current Position/Title
2. Educational background (to include college education achieved to include chronological dates(s), degree(s) held, and the school, college or university from which accomplishments were attained)
3. Related professional job experience (to include employer name/company, tenure dates, position title, responsibilities, experience with emphasis on PWS related tasks and degree of previous experience)
4. Current Level of current security clearance
In the event the offeror has not identified a firm candidate for a proposed task area, include the word “pending” in lieu of an individual’s name. Offerors should attempt to minimize the number of proposed labor personnel for which candidates have not been identified.
SUBFACTOR D: Management Plan.
Offerors shall submit a proposed Management Plan to describe how the offeror intends to manage and coordinate the task efforts of this contract, include planning, assigning responsibility, controlling personnel, controlling utilization of resources, tracking deliveries, and periodically monitoring performance and obtaining feedback.
Describe the ability of your proposed organizational structure and office systems to ensure effectiveness and efficiency in: (1) interfacing with active duty Marine Security Force and Navy civilian personnel; and (2) Performance and coordination of work. Describe the procedures in place for monitoring and controlling costs, and demonstrate that they are successful. If teaming or subcontracting is contemplated, Offerors must provide a full description of:
1. The proposed subcontractors or team members;
2. The portions of the task statement of work that will be subcontracted or the planned division of tasks within the team;
3. Discuss agreements/arrangements with its teammates and/or subcontractors and why such agreements will benefit the Government and aid the contractor in achieving the requirements and objectives of this effort and benefit the Government throughout the life of the contract
4. The extent (percentage) of subcontracting or the percentage division within the team;
5. The management structure for coordinating and controlling subcontractors and/or team members;
6. Subcontractor deliveries to the prime and payment tracking
7. Points of contact
The Management Plan shall also address the Offeror's Transition Plan. The Transition Plan shall include a staffing plan for hiring personnel after contract award. Plan to include schedule for hiring ramp up and timeframe when staffing actions will be completed which shall be not later than four weeks after contract award. The plan shall include but not limited to start date, end date, and detailed Plan of Action & Milestones (POA&M) with measurable elements. Plan shall also address proposed procedures and processes for the transfer and storage of all archived programmatic documentation. The Transition Plan shall also detail how the awarded contractor will coordinate communications with the incumbent contractor, BAE, and SWFPAC staff and how it will ensure uninterrupted workflow during the transition process.
NOTE: While it is recognized that the offeror’s proposal submission may not be able to detail specifics that will only be determined post-award, the proposed Management Plan must demonstrate the concept of operation proposed to most effectively meet projected Task Requirements and integrate functional areas.
(2) Volume II – Past Performance
a) Contractor Performance Data Sheets - Offerors shall complete Contractor
Performance Data Sheets (Attachment 5) for three of their most recently completed Federal Government contracts (not to exceed three years since completion) for supplies/services that are similar in scope, magnitude and complexity to this procurement. If you do not have any Federal Government contracts, then list state, local, or commercial contracts, in that order. Offerors are encouraged to submit brief and concise responses but may expand the form to provide sufficient explanation not to exceed 6 pages. Data submitted other than that requested on the Contractor Performance Data Sheets will not be considered. Failure to submit Contractor Performance Data Sheets shall be considered certification that the contractor has no past performance for the Government to evaluate.
Please ensure the following are addressed in the Contractor Performance Data Sheets:
Description of how the scope for this past contract/task order relates to this effort in scope and complexity.
Description of the significant achievements, challenges or obstacles that were encountered during contract performance and the measures taken to overcome them.
Description of achievements for the most recent period for which performance measures have been applied to each contract. The performance measures should be specific and show the target performance levels that are set forth under the applicable contracts as well as the level of performance achieved. The Offeror shall describe the tools and/or methods used to collect metrics data and the frequency of data collection and reporting.
Description of contracts with similar scope and complexity.
Offeror’s shall provide a written narrative that demonstrated their past performance of ability to handle and conduct security of materials, spaces, equipment and documents during the execution of the contract’s performance work statement. The narrative shall also demonstrate knowledge and performance of classified material handling and exposure to classified Material that meets the requirements of the
DD254.
b) Relevant Past Performance – Relevant past performance is defined as experience that is of the same or similar scope, of the same or similar magnitude (e.g., providing supplies or performing services of a dollar value comparable to the dollar value of the offeror’s proposal) and of the same or similar complexity to that which is described in the solicitation.
c) Past Performance Questionnaire - For each contract submitted for consideration on a Contractor Performance Data Sheet, a corresponding "Past Performance Questionnaire" (Attachment 6) shall be forwarded by the offerors to and be completed by the customers for whom the work was performed. The Government is under no obligation to consider incomplete data or data submitted in any other format. It shall remain the offeror's sole responsibility to request and track each past performance questionnaire to ensure receipt by the Government from the customers prior to the closing date and time established for receipt of offers in the solicitation.
d) Past Utilization of Small Business Concerns:
Other than small business offerors shall provide goals expressed as dollars and percentages of the total subcontract value for each the following socioeconomic subcategories: Small Businesses (SB), Small Disadvantaged Businesses (SDB), Women-Owned Small Businesses (WOSB), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses and Historically-Underutilized Small Businesses (HUBZone SB) for each contract listed on Contractor Performance Data Sheets that had subcontracting opportunities. In addition, other than small businesses are required to submit one copy of the two most recently approved semi-annual Individual Subcontracting Reports (ISR) submitted in the Electronic Subcontracting Reporting System (eSRS) for each of the contracts provided on the Contract Performance Data Sheets.
Small businesses, or those other than small businesses with no or limited Federal Government experience, are required to describe efforts made to carry out the policy of FAR Clause 52.219-8 Utilization of Small Business Concerns in the award of subcontracts for the contracts provided on their Contractor Performance Data Sheets.
Note: The Government reserves the right to use contract performance data provided in the Offeror’s proposal and additional contract performance data obtained from other sources, such as the Government’s Past Performance Information Retrieval System (PPIRS) data base, personnel knowledge and from the points of contact identified by the Offeror in its proposal.
(3) Volume III - Price
Offerors shall submit proposed pricing within Section J of the RFP for each CLIN. The Offeror shall comply with instructions contained herein for submittal of the Price Proposal. Contract award will be made at the proposed firm fixed prices of the successful Offeror using that Offeror's proposed Section J pricing
a) Proposed pricing shall be provided on a unit price line item basis in the solicitation. Complete the unit prices and amounts for contract line items. Provide the total amount for CLINs 0001-0003 =
b) Proposed pricing shall be provided on a unit price line item basis in the solicitation for the base year, two one-year options per FAR clause 52.217-9, and 6 month option per FAR clause 52.217-8. Complete the unit price and amount for each contract line item number in the solicitation. In addition, submit the summary information in the below table to include total amounts for the ten-month base period, one-month transition period, four one-year options, 6 month option extension, and total of all five years five months.
CONTRACT LINE ITEMS (CLINS) TOTAL AMOUNTS
CLINS 0001-0002, 10-month Base Period $ CLIN 0003 one-month transition period $
CLINS 1001-1002,
1st option year
CLINS 2001-2002,
2nd option year
CLINS 3001-3002,
3rd option year
CLINS 4001-4002,
4th option year
TOTAL AMOUNT ALL 5 YEARS $
CLINS 5001-5002 (6 month option 52.217-8)
$ 50% of the final option year’s offered price.
OVERALL TOTAL FOR ALL CLINS (5
years)
Offeror's proposal should represent its best efforts to respond to the solicitation. Any inconsistency between promised performance, the technical capability and experience in the proposal, identified personnel resources, and price must be explained in the proposal. For example, if the intended use of new and innovative techniques is the basis for an abnormally low estimate, the nature of these techniques and their impact on price shall be explained; or, if a corporate policy decision has been made to absorb a portion of the estimated price, that must be stated in the proposal.
Any inconsistency, if unexplained, may raise a fundamental question of the Offeror’s understanding of the nature and scope of the work required and may adversely impact the evaluation of the Offeror’s proposal. The burden of proof as to price credibility rests with the Offeror.
(4) Volume IV – Contract Information
a) Cover Letter - Offerors shall provide a cover letter with the following information:
Solicitation number The name, address, electronic-mail address, and telephone and facsimile numbers of the Offeror A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item
A statement that the proposal is valid through 180 calendar days from the date specified for receipt of proposals
Names, titles, telephone and facsimile numbers, e-mail addresses of persons authorized to negotiate on the Offeror's behalf with the Government in connection with this solicitation
Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office; and
Identify all enclosures being transmitted as part of its proposal.
SECTION SF30 - CONTINUATION PAGE
The following have been modified:
QUESTIONS AND ANSWERS
Amendment 1: 14 December 2020
Question 1: Is there a CBA currently in place covering any of the positions?
Answer: There is no collective bargain agreement (CBA) applicable to this contract other than what the contractor performing these services has with their employees.
Question 2: Is this a new contract? Who is the current incumbent, and what is the previous contract award number?
Answer: The current incumbent is BAE and the current contract number is N0040620C0031
Question 3: Regarding the requirement for contractors to establish and maintain a Qualification/Certification Program for Explosives Handling, would it be acceptable for a subcontractor to the prime to hold the certification?
Answer: There is a requirement for a Qualification/Certification Program for Explosives Handling (Explosive Drivers, OIS Database, and Magazine Operations) and Qualification/Certification Program for Armory personnel.
If a sub-contractor is used, the Certification Chairman, and both the Explosives Handling and Armory Qualification/Certification Programs would have to fall under the same sub-contractor. The Management Plan would need to designate the bearer of ultimate responsibility for the Explosive Handling and Armory Qualification/Certification Program.
Question 4: Page 20; Paragraph 9.0.7; Information System. The reference states that the contractor can provide an information system or use one provided by the Government to track weapons issued/received and SL 3/collateral items issued/received.
(1) Does the Government have a system in place today that can be utilized or should the contractor come prepared with this system?
(2) Will there be a need to connect it to the Intranet? Or will it be a stand-alone system requirement?
Answer: See section 9.0.7 of the Performance Work Statement (PWS). This information has been updated with this amendment.
Question 5: Page 25; Paragraph 10.6; CBR Workload. This section states that the number of personnel requiring/returning CBR equipment is stated at "twenty" however, in parenthesis the number (40) per month is listed. For workload purposes, can the Government clarify if the estimated workload is 20 or 40? Per month?
Answer: The estimated workload should read “forty” (40) per month. This information will be updated in this amendment.
Question 6: Page 96; Page Restriction for Attachment 5. The instructions in Section L requires that Attachment 5 be 3 pages for each of the contracts that the Offeror submits. Attachment 5 of the Solicitation is in itself 6 pages long.
What is the page requirement for completing each of the contract references in Attachment 5?
Answer: Attachment 5 of the solicitation is 6 pages long, please fill out and turn in each of the 6 pages. That information will be updated in this amendment.
Question 7: Page 97; Proposal Format. May Offerors submit proposals in PDF format versus Microsoft Word in order to ensure accuracy (excluding pricing data in Excel)?
Answer: Offerors may submit proposals in PDF format. That information will be updated in this amendment.
Question 8: Page 99; Sub-element 4, Resume Requirement. A resume is required for the Certification Chairman.
Can the government elaborate on what is required and if that should be included in the personnel section?
Answer: No resume is required for the board’s chair, relative experience and Certification of the Chair is required.
Please see OPNAVINST 8023.24C for the details of this certification program. This information will be updated in this amendment.
Question 9: Page 100; Subfactor B, Management Plan. Would the government consider increasing the page count to accommodate all of the items needed for the Management and Transition Plans?
Answer: The page count for this is increased to a maximum of 14 pages. This information will be updated in this amendment.
Question 10: Page 101; Sub-elements a, b and c; Attachments 5 versus Narrative. Does the Offeror need to complete both the Attachment 5 and a Narrative for the past performance addressing the sub-bullets listed? They seem redundant.
Answer: Only attachment 5 is required and the attachment must address the 5 bullets under the contract performance data sheets for Volume II on page 101(now corrected with this amendment).
Question 11: Are resumes needed for only the Key Personnel (Leads and PM)?
Answer: See section 3.0 of the Performance Work Statement (PWS).
Question 12: Does the government require a DD 254? Which volume should that be provided in?
Answer: Yes the government does require a DD 254, please include with your proposal as an attachment(s).
Amendment 2: 21 December 2020
Question 13: Can you specify where the MILES equipment is stored and issued?
Answer: MILES is currently stored and issued from a Supply Area located in BLDG 2102.
Question 14: Page 96 states:
“Offerors shall submit their proposals in four (4) separate volumes as follows: Offerors shall also include the following:
Solicitation cover sheet with appropriate blocks completed by the Offeror.
Acknowledgement of solicitation amendments pursuant to FAR 52.215-1 (if not previously provided).
Representations and Certifications completed by the Offeror in accordance with instructions contained elsewhere in this solicitation. If the Offeror has completed all of the representations and certifications required by this solicitation in SAM (www.sam.gov) in accordance with FAR 52.204-8 and DFARS 252.204-7007 ALT A, then the Offeror need not submit the hardcopy Representations and Certifications.”
What volume should these be located in?
Answer: Please include the entire filled out and signed solicitation as an attachment to your proposal.
Question 15: Page 3, Item 2, states, “The entire solicitation shall be filled out, signed, and returned as part of your offer.” Please note the following questions pertaining to this:
Which volume should the entire solicitation be part of?
Page 96 states, “If the Offeror has completed all of the representations and certifications required by this solicitation in SAM (www.sam.gov) in accordance with FAR 52.204-8 and DFARS 252.204-7007 ALT A, then the Offeror need not submit the hardcopy Representations and Certifications. Do we submit the entire solicitation even if we have completed SAM Representations and Certifications?
Further instruction on which Representations and Certifications are to be completed are provided on page 50. Please clarify instructions with relation to completing the entire solicitation.
The RFP states that no pricing information of any kind shall be included in any volume except Volume III, Price Proposal. Offerors must submit all price- related documentation required for Volume III. Where do we include the completed solicitation and Schedule B?
Answer: Please include the entire filled out and signed solicitation as an attachment to your proposal.
Questions 16: Do all postions require a Secret Clearance?
Answer: See Section 14.4 of the Performance Work Statement (PWS).
Questions 17: The solicitation states that offerors shall be submitted electronically to chastity.cowans@navy.mil and james.wasson@navy.mil. Shall it also be uploaded to BetaSam?
Answer: Electronic submission of proposals through the betaSAM website is not available at this time. This information will be updated in this amendment.
Question 18: Section L requires that there be a “minimum of three (3) references (3-Page Limit each) for the Prime.” Please confirm that the references must be for Prime only.
Answer: Please see section L update in amendment one.
Question 19: Attachment 5 references “their ability” and the “contractor’s ability” versus “your ability” in a few of the questions (Quality, Management of Key Personnel, and Question 17). In addition, Question 10 requires a scoring for evaluation and special acknowledgements. Please confirm that Attachment 5 is to be completed entirely by the Offeror and what is required for Question 10?
Answer: Please see Section L Volume II past performance (a).
Question 20: Please confirm that a copy of the completed Questionnaires do not need to be provided in the proposal and that they should be forwarded from the Offerors customers directly to the government.
Answer: Completed Past Performance Questionnaires are to be forwarded directly to the government from the offerors customers. See Section L on past performance questionnaire for tracking.
Question 21: Page 98 states: “The Offeror shall demonstrate that its proposed personnel possess the requisite skills, knowledge, experience, and expertise outlined in the Performance Work Statement for each type of personnel required. Key personnel should be subject matter experts in the field they are being proposed for and possess the capability necessary to meet the requirements of the PWS.”
However, Page 99 states: “Offerors should attempt to minimize the number of proposed labor personnel for which candidates have not been identified.”
a. Please clarify if experience summaries for each type of personnel (labor category) is required—or for all of the proposed personnel.
b. Please confirm that only Key Personnel qualifications need to be submitted. It would seem an unfair advantage to the incumbent if all proposed personnel are being evaluated.
Answer: a. Experience summaries are required for each type of personnel (labor catergory). b. See PWS Section 3 Key personnel and Section L subfactor C Staffing Plan.
Question 22: In our description of the qualifications of proposed staff, please confirm that there are no page limitations for personnel summaries/resumes (Page 99, Subfactor C, Items 1-4)?
Answer: There are no page limitations for the staffing plan.
Question 23: The Evaluation Criteria on Page 111 and Section L (Page 101) addresses Past Utilization of Small Business Concerns. Please confirm that Small Businesses do not need to address this.
Answer: Small Business’ do not need to submit a subcontracting plan.
Question 24: Can the government elaborate on what is required for Sub-Sections 9.2.8 and 9.2.10 (Page 21)? There appears to be something missing.
Answer: 9.2.8 and 9.2.10 have been updated with this amendment and fall under 9.2.7 A&E (Class 1.4 and 1.1) Inventories.
Question 25: The Management Plan, Subfactor D, on page 108 requires a discussion of “tracking deliveries.” Can the government be more specific on what specific deliveries are being referred to?
Answer: Tracking deliveries can be defined as taking appropriate actions for all Government property received, to include but not limited to purchases / procurements, individual equipment, CBR, weapons, and A&E.
Question 26: In light of both Christmas and New Years, would the government consider granting a 1-week extension for the due dates of the proposal?
Answer: The close date for the solicitation remains unchanged to date.
Amendment 3: 29 December 2020
Question 27: Ref: Amendment 1, Page 39, Section 6 Pricing Information, Attachment 8 Cost Summary Worksheet, and ENCL2
The pricing Attachment 8 Cost Summary Worksheet only contains labor costs, yet the RFP requires that bidders provide costs for the three trucks and associated operation of the same. Furthermore, under additional notes in this same section, there is the following stipulation: If there are any discrepancies between the pricing submitted in Section J and the price related backup/summary documentation, the Offeror's Section J pricing will take precedence.
A. Where are the bidders to include pricing for the AMMO TRANS WORKLOAD contained in ENCL 2?
B. Is there a specific format for capturing these costs?
C. Which Contract Line-Item Numbers (CLINS) should these costs be aligned with, assuming that these are to be included in the pricing?
Answer: Attachment 8 Cost Summary Worksheet is being provided as a generic template and should be tailored in accordance with your proposal. This is a Firm Fixed Price Commercial Service Contract. Pricing should be aligned with CLIN 0001 for logistics and ammunition handling, storage, and support. CLIN 0002 reflects overtime.
Question 28: Ref: Attachment 8 Cost Summary Worksheet
The worksheet provides a format for capturing labor costs in each of the periods for "straight time." If bidders have more than one fringe rate for labor being proposed, how should the rates and associated costs be captured since the Government-provided template only provides for a single entry?
Answer: Attachment 8 Cost Summary Worksheet is being provided as a generic template and should be tailored in accordance with your proposal.
Question 29: Ref: Attachment 8 Cost Summary Worksheet In each of the overtime tabs, there is no place to capture indirect costs and fee. Are the labor rates indicated in column G of each respective period fully burdened inclusive direct labor costs, indirects, and fee? If not, where are the indirects and fee to be captured?
Answer: Labor rates are fully burdened and are inclusive of the direct labor costs, indirects, and profits. This will not be a cost contract.
Question 30: Ref: Amendment 1, page 102, section 3, Volume III – Price, sub-section a), and sub-section b).
In sub-section a) there is a requirement to provide a total amount for CLINS 0001-0003, and in sub-section b) there is a requirement to provide costs for CLINS 0001-5002. Is this duplication intentional, and does the Government want the costs for CLINs 0001-0003 duplicated, or can the bidders simply provide the input in tabular form as indicated in sub-section b?
Answer: This is not a duplication please provide the total cost for CLINs 0001-0003 in sub-section a) and breakdown the cost of the CLINs in sub-section b)
Question 31: Ref: Amendment 1, page 102, section 3 Volume III – Price, sub-section a), sub-section b). and Attachment 8.
The table on page 102 of the RFP amendment indicates that the bidders are to provided total amounts for Option years 1-4 CLINS 1001-4002 respectively) along with a 6-month extension (FAR 52.217-8), which is 50% of the final option year's price. However, Attachment 8 only provides for three option years. Where is the fourth "straight-time" option year to be captured within Attachment 8?
In addition, within Attachment 8, there are only two tabs for option years (Overtime OY 1 and Overtime OY 2).
Were, if at all are the costs for overtime option years three and four (OY 3 & OY4) to be captured?
Answer: Attachment 8 Cost Summary Spreadsheet is being provided as a generic template and should be tailored in
Question 32: Ref: RFP pages 4-9, Section B – Supplies or Services and Prices, and page 66, ENCL 2
In Section B, the items associated with ammunition transport overtime (items x002) indicate overtime hour quantities of 400 hours for the base year and 480 for subsequent 12-month option years. Based on ENCL 2 requirements, calculations result in overtime hours differ from those specified in Section B for overtime.
How are the bidders to reconcile these differences when preparing the bids?
Answer: There are only 10 months in the base year and each remaining year is a full 12 months.
Question 33: Price Proposal – on pg 102, the instructions state to submit pricing with Section J of the RFP for each CLINs. Section J is a list of attachments to the proposal and an Enclosed facility List. A) says to provide the total amount for CLINS 1-3. However, the CLINS in the table below are for CLINS 0001-0003 and then OYs for CLINS 1001 and 1002 - 5001 and 5002. Please clarify which documents and the format you are requesting for the Pricing.
Answer: Section J of the RFP has a list of all attachments. Pricing is to be completed with attachment 8 Cost Summary Spreadsheet. Please fill in Volume III Price section of the RFP as well. The RFP should be filled out in its entirety.
Question 34: Attachment 8 - this does not seem to relate to this proposal, but appears to be a required inclusion in the pricing volume.
a. There are only tabs for cost summaries for 3 OYs. Will the government provide an update of the chart along with instructions. Please clarify if we are only including 4 years of pricing information.
b. Column D is titled #of FTE (Monthly & Annually). The sample says 100%. Do you require total number of FTEs per labor category or do you want this to match the staffing chart in Attachment 7
c. What is the definition of “Loaded Labor Rate” for Col F?
d. Line 18 has Fringe, Line 19 requires G&A, Line 20 requires Profit. Is this an average percentage or a price for each labor code of category or by person?
e. This chart apperars to be labor costs alone. How does the government, or where, do we need to include equipment costs?
f. Is this chart to include overhead and G&A for the vehicles, and material handling equipment per person, or can we have a separate are for equipment and fuel cost?
Answer: Attachment 8 Cost Summary Spreadsheet is being provided as a generic template and should be tailored in
Question 35: Hazardous Duty Pay is a direct labor cost, however, the plan is to have multiple personnel qualified on transport.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .