Att_12_Statement_of_Work.pdf
PDF 1 MB Posted
- Attached to
- Bldg. 81 Refresh and Remodel Restroom
- Solicitation number
- N0025327Q0005
About this file
This is a Statement of Work (SOW) for the renovation of a men's restroom into a single occupancy unisex Americans with Disabilities Act (ADA) compliant restroom at Naval Undersea Warfare Center (NUWC) Division, Keyport.
The contractor shall remove existing fixtures, partition walls, and install new fixtures, flooring, paint, and replace the drinking fountain with a bottle filler. Key product requirements include ADA-compliant fixtures: wall-hung sink with WaterSense faucet, floor-mounted toilet with 1.28-gallon-per-flush limit, wall-mounted urinal at 28"-30" height, ADA grab bars, 24" x 36" mirror, new LED overhead lights (4200K color temperature, 50,000-hour minimum life with motion sensors), exhaust fan with minimum 100 cfm intermittent or 20 cfm continuous operation, GFCI outlets, wall-mounted drinking fountain with bottle filler and refrigerated cooling capacity at 8 gph, interior latex low-VOC paint, 18-gauge steel door with stainless steel kick plate, 18" x 18" commercial-grade slip-resistant LVT flooring with 20 MIL wear layer, 1500W electric wall heater, 6" black rubber cove base, and ADA-compliant unisex restroom signage. The contractor must provide labor, materials, and equipment; coordinate with the Technical Point of Contact (TPOC); hold a preconstruction meeting two weeks prior; submit product submittals for TPOC approval allowing 10 working days for review; provide temporary ADA-compliant portable restroom during work; handle lead and asbestos materials per applicable regulations; and comply with all safety, environmental, and quality control requirements detailed in the SOW. All submittals requiring Environmental signature must route through TPOC. Monthly invoicing with separate Schedule of Values for each project area is required, and the contractor must provide operations and maintenance manuals, warranty documentation, material/equipment lists with warranty expiration dates, and training on new systems prior to final acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att_13_Drawing_Distro_A.pdf | ||
| Att_07_Past_Perf_Ref.docx | DOCX document | |
| Att_04_Guide_Environmental.pdf | ||
| Att_09_PPI_Form.docx | DOCX document | |
| Att_03_Guide_Safety.pdf | ||
| Att_05_Guide_OPSEC.pdf | ||
| Att_02_Wage_Determination.pdf | ||
| Att_01_Material_Equipment.xlsx | XLSX spreadsheet | |
| Att_10_Safety_Data_Sheet.docx | DOCX document | |
| Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| Att_11_OSHA_Incident_Rate.pdf | ||
| Att_08_Bid_Form.xlsx | XLSX spreadsheet | |
| Solicitation - N0025327Q0005.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Bldg. 81 Refresh and Remodel Restroom
Statement of Work:
Naval Undersea Warfare Center (NUWC) Division, Keyport has a requirement for renovation of a men’s restroom into a single occupancy unisex Americans with Disabilities Act (ADA) complaint restroom. The project will require the contractor to remove existing fixtures, partition walls and install new fixtures, flooring, paint and replace drinking fountain with bottle filler.
The Contractor shall provide labor, materials, and equipment, as required, to accomplish the following work in accordance with the statements here.
All work must be coordinated through the Technical Point of Contact (TPOC). A preconstruction meeting will take place two weeks prior to the start of construction, the TPOC, Customer, Contractor and all required subs will be in attendance at a minimum.
I. References:
A. Naval Base Kitsap (NBK) Instruction 11300.1B (July 2021) Utilities and Facilities Outages (available upon request)
B. EM-385-1-1 Safety and Heath Requirements Manual, March 15, 2024, available at https://www.usace.army.mil/Missions/Safety-and-Occupational- Health/Safety-and-Health-Requirements-Manual/.
C. NAVFAC P307 Weight Handling Program Management Manual June 2016 (available upon request)
D. Naval base Kitsap (NBK) Instruction 11210.1A Road Closure/Disruption Coordination August 21, 2014 (available upon request)
E. Unified Facility Criteria (UFC) 1-200-01 DoD Building Code – General Requirements-With Change 3 Revision Date February 26, 2024 available at https://www.wbdg.org/dod/ufc
F. 2010 Americans with Disabilities Act (ADA) Standards for Accessible Design
– Department of Justice September 15, 2010, https://www.ada.gov/assets/pdfs/2010-design-standards.pdf
II. Submittals:
1. Electronic copies of Product/Material Submittals & Construction/Project Schedule shall be submitted to the TPOC for acceptance. See Deliverables and Performance Table under General requirements for a list of required submittals.
Allow a minimum of ten (10) working days for Government review of all submittals.
2. Proposed equipment specifications shall be submitted to the TPOC for review and written approval prior to commitment to purchase.
3. Required outages shall adhere to Ref (A) and routed through the TPOC for information on scheduling. The TPOC is not responsible for outage coordination, obtaining signatures, or vetting outage requests, including Hot Work permits or
Fire Alarm outages. Contractor pricing shall include all Contractor support and associated costs in their proposal.
4. All submittals requiring NUWC Keyport Environmental signature shall be routed through the TPOC for review. The TPOC shall be copied on all correspondence sent to Environmental. No work shall begin until all required Environmental forms have been accepted by Environmental.
5. The contractor may submit an invoice no more frequently than once a month for progress made on the project. Therefore, the Schedule of Values (Attachment 06) submitted with each invoice shall have a section for each area of the project listed separately on the invoice. The Schedule of Values will be submitted to the Government TPOC for acceptance prior to final submission of the invoice. Failure to submit an invoice, which lists each area separately, will result in rejection of the invoice until properly submitted according to these instructions. Questions may be directed to the Contracting Officer.
6. All contractors working this project are subject to labor interviews and shall provide the information requested per “Labor Standards Interview” Standard Form 1445. The TPOC/Contracting Officer will conduct these interviews randomly during the performance of the work.
III. Products:
1. All materials and products provided by the Contractor in the performance of this contract shall be new or exceed the manufacturer’s specifications.
2. The materials and/or products listed here are a description of the minimum specifications or characteristics of the noted items, and not intended to be an all-inclusive list of materials required for the project.
A. Wall hung sink and faucet.
White, Enameled cast-iron Cast-iron or steel brackets secured to the underside of the apron and drilled for bolting to the wall in a manner similar to the hanger plate.
Exposed brackets must be porcelain enameled.
Provide ADA compliant polished stainless steel WaterSense faucets
B. ADA Compliant Toilet and flush valve.
White, vitreous china, siphon jet, elongated bowl, floor-mounted, floor outlet. Provide wax bowl ring including plastic sleeve. Water flushing volume of the water closet must not exceed 4.8 liters 1.28 gallons per flush. Provide data identifying WaterSense label for flush tank water closet.
Provide large diameter flush valve including angle control-stop valve, vacuum breaker, tail pieces, slip nuts, and wall plates; exposed to view components must be chromium-plated or polished stainless steel.
Flush valves must be nonhold-open type. Mount flush valves not less than 11 inches above the fixture. Mounted height of flush valve must not interfere with the hand rail in ADA stalls.
C. Wall hung flush valve Urinal.
White Vitreous china Mounted at 28”-30” above finished floor.
D. Lavatory mirror.
24” Width by 36” Height Rectangular with Satin Stainless Steel
Frame, Fixed Tilt Mirror, with Shatter Proof Glass.
E. New LED Overhead lights.
Color Temp: 4200K (±200K); Minimum CRI: 80; Minimum fixture life (L70 method): 50,000 hours; Minimum fixture warranty: 4 years.
Provide audio and motion sensors for all lights with minimum 20-minute timeout setting.
F. ADA compliant Grab Bars.
Brushed stainless steel
G. Exhaust Fan.
Exhaust fans need a minimum airflow capacity of 100 cubic feet per minute (cfm) for intermittent operation or 20 cfm for continuous operation, and must exhaust directly outdoors, not into a recirculated space.
Must match size and shape of existing fan to fit in existing exterior opening.
Whisper quiet technology.
H. Ground Fault Circuit Interrupter (GFCI) Electrical duplex outlets and covers I. One (1) Drinking fountain and bottle filling station
Wall Mount Touchless sensor activated bottle filler LED filter status indicator Stainless Steel and silver housing ADA compliant Laminar flow and 1.1 gpm fill rate Refrigerated Cooling capacity 8 gph @ 50 degrees F.
Factory set but adjustable temperature.
Front and side pushbar Connect to existing plumbing.
J. Interior latex paint, low volatile organic compound (VOC) matching existing color and sheen.
K. Steel door and frame 18-gauge door and 14 gauge welded frame.
10” x 34” Stainless Steel Kick Plate on door.
Commercial Grade Hinges ADA complaint door hardware and Deadbolt Lock with occupancy indicator, thumb turn only. No key bypass.
L. ADA Compliant Unisex restroom Sign
Minimum 6” x 9” Blue Pictogram with braille raised characters.
M. 18” x 18” Square Commercial Grade Slip Resistant Luxury Vinyl Tile (LVT) Flooring 20 MIL wear layer with 3.0 mm overall thickness.
3 neutral tone color samples to be provided to the TPOC for color selection during submittal process.
ADA-compliant vinyl flooring must be level, slip-resistant, and firm.
N. 1500W Electric Wall Mount Heater and manual thermostat.
O. 6” Rubber Cove Base
Color shall be black.
IV. Quality Control:
1. The Contractor shall comply with all applicable Washington State licensing requirements, from the time of proposal submission through the entire performance period. All components and services are to be installed per manufacturer’s specifications by trained technicians with a minimum of five (5) years’ recent experience or have journeyman certification, who specialize in the type of work indicated herein.
2. The Contractor shall perform all work according to accepted standards, safety procedures, and applicable laws, regulations, codes, and standards to include the Unified Facilities Guide Specifications (UFGS), Unified Facilities Criteria (UFC), International Building Code (IBC), International Mechanical Code (IMC), International Plumbing Code (IPC), National Electrical Code (NEC), National Electrical Safety Council (NESC), and National Fire Protection Association
(NFPA).
3. The Contractor shall be responsible for all quality control, inspections, and tests required in the completion of this project. The Contractor shall obtain all acceptances except those required for field installations, field applications, and post-field tests, prior to delivery of materials and equipment to the project site unless otherwise specified. The Contractor shall arrange for tests and inspections where and when required as defined in the approved Quality Control Plan.
4. Contractor shall verify all dimensions of all equipment to ensure that all access clearances can be met.
5. The contractor is responsible for providing a complete and useable system including providing manufactures manuals, specifications, any field tests, wiring diagrams and as- built prints (red line drawings) as necessary.
V. Execution: (general)
1. All accepted project packages shall be kept on the jobsite and all employees shall be aware of its contents. Current, up-to-date Site-Specific Activity Hazard Analysis (AHA) forms shall be available for review, if applicable. The Contractor shall inform all employees prior to the start of performance as to the process for contacting Base Emergency Services in the event of an emergency.
2. Scheduling: The Contractor shall schedule work to cause the least amount of interference with station operations. The government will attempt to provide the Contractor 24 hours’ notice prior to work interruptions due to unscheduled/emergent operational requirements.
3. Delivery, handling, storage, and protection of products to, and at the project site:
Inspect for damages, store in a clean dry place, and protect from construction traffic. Handle carefully to avoid damage to components, enclosures, and finish.
4. Access to NUWC Keyport is limited to cleared personnel and vehicles.
5. Disposal of any material resulting from demolition shall be per applicable Environmental regulations, including all documentation (Waste Designation Tables, Waste Generation Record WGRs, and documented in accordance with Attachment 04.
6. Contractor shall locate all utilities prior to starting any excavation work.
7. Contractors performing a Weight Handling Evolution shall adhere to Ref (C) and Attachment 03.
8. Contractors utilizing lifting and handling equipment shall adhere to Ref (C) and Attachment 03.
9. The TPOC shall be contacted to coordinate access for job walks and scheduling of work.
VI. NUWC Keyport General
1. Safety and Security Brief
A. Compliance with the security directions of NBK Security Force Personnel is mandatory.
B. Performance under this contract requires the contractor to adhere to Attachment 05, Operations Security (OPSEC) requirements, which are attached to this solicitation and will be incorporated into the subsequent award and are also available online at: http://www.navsea.navy.mil/Home/Warfare- Centers/NUWC-Keyport/Resources; search for OPSEC Guide for Defense Contractors.
2. Smoking
A. Smoking is only permitted in designated smoking areas.
3. Delays
A. Contractor operations are subject to reasonable delays, suspensions, and/or restrictions because of emergencies, alerts, drills, equipment movements and other such activities.
4. Flame Producing Devices
A. Matches, lighters, and other spark producing devices are not allowed without a Hot Work permit.
5. Portable Electronic Device(s) (PED)
A. PED is defined as a portable electronic device having the capability to store, record, and/or transmit text, images/video, or audio data. Examples of PED include, but are not limited to pagers, laptops, cellular telephones, radios, compact disc and cassette players/recorders, portable digital assistants, audio devices, watches with input capability, reminder recorders, and mobile devices.
B. PEDs are not allowed inside of NUWC Keyport Buildings. PED use will be clarified and discussed at the site walk and pre-construction meeting
C. The Government TPOC or Building POC will provide location of phone for emergency use.
6. Photography
A. Photography by the Contractor is prohibited. Construction progress photos, and all other necessary photo documentation, will be provided by authorized Government personnel only.
7. Lock out Tag Out
A. Lock Out/Tag Out: Contractors must notify the TPOC five (5) working days before anything can be locked out. The notification should include: what is being locked out, the tag number, the person on the tag and phone number shall also be provided to the TPOC within 24 hours of removal.
8. Vehicle Access
A. Only government and authorized company vehicles will be allowed access to Naval Base Kitsap (NBK). Vehicle registration must have the company's name as the owner. If the vehicle is leased or rented the lease or rental agreement must be in the company's name.
B. All vehicles will be subject to inspection and search prior to entering and within NBK. Avoid transporting sealed containers into Naval Base Kitsap. If such containers must be introduced, prior coordination with the TPOC is required.
9. Parking
A. Parking at NUWC Keyport sites is generally unreserved unless otherwise explicitly marked with specific signage or common markings such as (but not limited to) handicap markings, “government vehicle”, and red & yellow marked zones. Numeric marked spaces are no longer indicators of reserved parking. However, this means parking availability is generally in order of arrival and conventional parking stalls cannot necessarily be guaranteed to the contractor.
For large projects with several contractor vehicles and/or outdoor laydown needs for material and/or equipment, contractor shall apply for a Parking Disruption, Road Closure, or Area Outage per Ref. (A).
For small projects with very limited number of work vehicles and little to no outdoor laydown, company-marked contractor vehicles may generally utilize yellow-marked “loading” zones for parking, so long as this does not block building doorways nor marked personnel egress paths, nor intrudes into vehicle traffic lanes, nor causes other safety problems.
VII. Deliverables:
1. The Contractor is responsible for providing a complete and useable system.
2. The Contractor shall prepare and submit one (1) Electronic Copy in PDF of the Operations and Maintenance (O&M) Manuals to the TPOC. O&M’s shall include Attachment 01 above, all product data, manufacturer’s manuals, warranty, specifications, field test results, wiring diagrams, and as-built prints (red line drawings), as necessary.
3. Submit all manufacturers' signed warranties to Contracting Officer prior to final commissioning and acceptance.
4. The Contractor shall provide a list of significant equipment and materials removed, replaced, or installed under this contract with the required information below, including the warranty expiration date.
A. Examples of equipment and materials to report.
Materials: Roofing products, floor coverings, windows, doors, lighting, and all material with a manufacturer’s warranty.
Equipment: Mechanical (pumps, backflow preventers, HVAC components, pressurized piping systems, panel boxes, emergency lights, street lighting, etc.); mechanized doors, elevators, conveying systems, all equipment with an O&M manual or manufacturer’s warranty.
B. Required format and information: The Contractor shall provide material and equipment data in the attached format (Attachment 01 Material/Equipment In-Place List). All of the requested data shall be provided prior to final inspection or final acceptance.
5. Before final payment will be approved, the Contractor shall provide all necessary training required on all new systems.
6. This project will not be accepted as complete until all project documentation and punch list items have been submitted to and accepted by the TPOC in their entirety and the Customer provides their concurrence electronically to the TPOC that the project is complete.
VIII. Work Description:
1. Coordinate with TPOC prior to commencement of work.
2. Refer to floor plan provided for work location of the below listed tasks.
3. Provide means and methods to seal off proposed areas of work during performance of work for limiting construction dust & finishing odor migration in other areas of the building. Volatile Organic Compounds (VOC’s) shall be kept below the Permissible Exposure Limit (PEL).
4. This is a historic building. No new penetrations or alterations to the exterior are permitted.
5. This building includes paint and floor tile mastics that contain lead and asbestos.
Care should be taken during this project to handle, remove and dispose of these items in accordance with applicable lead and asbestos regulations.
6. Temporary ADA compliant portable restroom and handwashing station will be required to be provided by the contractor for government and contractor workers while restroom is out of service.
7. Restroom Demolition:
Remove existing restroom accessories (toilet paper holder, soap dispenser, paper towel holder and seat cover dispenser). Preserve these items for re-installation.
Remove and dispose of Bathroom fixtures including toilets, sinks, urinals, faucets, partitions, grab bars, and mirrors.
Rubber cove base.
Exhaust fan.
Light fixtures.
Drinking fountain.
Door frame/jamb.
Wall heater.
All plumbing and electrical shall be shut off at nearest disconnect and any conduit or piping including associated hangers not being re-used as part of this project shall be removed/demolished back to the nearest shut off or disconnect.
Any equipment to be removed as part of this project that contains an equipment number tag must have the tag be removed and turned over to the TPOC. If tag cannot be removed contact the TPOC to get photos before equipment is removed from base.
8. Provide and install new wall heater and thermostat in new location outside ADA circle radius shown on floor plan.
Exposed electrical conduit is acceptable.
9. Provide and install new ADA compliant floor mount toilet, wall mount urinal, and wall mount sink and faucet.
Provide all plumbing, brackets, pipe/vent extension necessary to provide a complete and useable plumbing fixture installation per manufacture’s installation instruction and current codes.
Patch and repair any portions of concrete floor or wall as necessary.
For unused toilet drain where new wall mount urinal is going, provide and install permanent drain plug below the concrete. Fill with non shrink grout or concrete patch smooth with existing floor.
10. Provide and install ADA compliant wall mounted grab bars around at new toilet location
11. Provide and install new LVT flooring including transition strip at door as necessary to provide smooth ADA compliant transition into restroom.
12. Remove and replace the existing door, frame and hardware.
Frame and hardware shall meet ADA requirements.
Door and frame shall be painted grey color similar to existing. The government will choose specific color based on color samples provided by the contractor during submittal review.
13. Provide and install ADA compliant unisex restroom sign on new door.
14. Remove existing water meter and backflow preventer assembly from West wall of restroom. This assembly interferes with ADA compliance of restroom. Reinstall and reconnect assembly on North wall outside the restroom as shown on floor plan.
Remove existing drain to exterior and patch and repair exterior wall to match existing.
Provide and install new drain line with air gap and route through wall to discharge into existing floor drain in restroom.
Provide all plumbing, brackets, pipe/vent extension necessary to provide a complete and useable installation meeting current codes.
15. Provide and install a new exhaust fan.
Fan shall meet current mechanical codes for restroom ventilation.
Exhaust fan shall be same size and shape as existing fan to fit in existing opening.
Exhaust fan shall be tied to light switch and come on automatically when lights are activated.
16. Provide and install new water fountain/bottle filling station.
Hang at ADA accessible height.
Reconfigure/relocated existing electrical, plumbing supply and drain lines as necessary to provide a complete and useable system.
Relocate existing bulletin board West as necessary to accommodate new drinking fountain and water meter assembly location.
Patch and repair drywall disturbed or damaged during installation. All drywall patching shall match the existing finish and color. Drywall patches shall not be visible after completion.
17. Paint all walls and ceiling in restroom and the entire wall where new drinking fountain was hung (including exposed conduit, piping and hangers) with 2 coats of paint. Color shall be off-white. The government will choose specific color based on color samples provided by the contractor during submittal review.
Remove blistering, cracking, flaking, and peeling or otherwise deteriorated coatings from walls and ceilings in preparation for painting.
Feather and sand smooth edges of chipped paint.
Patch and repair all holes and drywall damage.
All drywall patching shall match the existing finish and color. Drywall patches shall not be visible after completion.
Prior to surface preparation and coating applications, remove, mask, or otherwise protect hardware, hardware accessories, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
18. Provide and install new 6” black rubber cove base around perimeter of restroom room.
19. Provide and install new wall hung mirror. The new mirror shall be hung above new sink meeting ABA requirements.
20. Re-install existing restroom accessories (toilet paper holder, soap dispenser, paper towel holder and seat cover dispenser) meeting ADA location and height requirements.
21. All dimensions provided by the Government are only approximations; the
Contractor is responsible for field verifying all existing site conditions, dimensions, elevations, clearances, egresses and finishes at jobsite prior to commencement of any work.
22. Perform work in accordance with the manufacturer's published diagrams, recommendations, and equipment warranty requirements.
23. Pipe, fittings, hangars and valves: All piping shall be properly supported, installed straight and uniform. All access panels and service valves shall be non-obstructed and easily accessible for maintenance purposes.
24. All penetrations and openings that can be susceptible to water intrusion from the exterior elements to the interior facility/equipment, shall be sealed to prevent water intrusion. Insulate and/or seal all penetrations accordingly.
25. Where pipes pass through walls, furnish and install tested and listed fire stopping systems, combination of materials, or devices to form an effective barrier against the spread of flame, smoke and gases, and maintain the integrity of fire resistance rated walls. Through-penetrations include the annular space around pipes.
26. All surrounding walls or structural surfaces affected by removal or installation of all equipment must be restored to the match the surrounding finish.
27. After becoming familiar with all details of the work, perform Verification of Dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
28. Carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.
29. All field verification will be the contractor’s responsibility. Including but not limited load requirements and sizing.
30. Upon completion of the work, the Contractor shall inform the TPOC, and customer to demonstrate operational tests.
IX. Title to Materials:
1. All excess and/or discarded materials shall become property of the Contractor and shall be removed from government property, unless specifically noted.
2. Recycling is preferred and recommended. AWGR is required for disposal and recycling is required for metal.
X. Cleanup:
1. Contractor shall not dispose of debris/rubble on NBK property or in NBK dumpsters.
XI. Safety
1. The contractor is responsible for the actions of their personnel on site and any person on the project site has the authority to stop work if an unsafe condition exists.
2. Read and sign Attachment 03 NAVSEA Safety Requirements for Contractors and Subcontractors.
3. Ensure all workers are wearing the proper PPE for the assigned task.
4. The Contractor is responsible for inspecting their worksite for any hazards at all times, no exceptions. If an unsafe condition exists, work to correct or mitigate the hazard and contact the TPOC to assist in determining how to proceed, if needed.
XII. Environmental:
1. The Contractor shall comply with all federal, state, and local laws, codes, regulations, acts, ordinances, and rules for Environmental Protection and Hazardous Waste Management / Disposal, including facility instructions and facility permits for work taking place on government properties. Take actions to mitigate creation of hazardous waste (HW) by recycling and other available methods.
2. The Contractor shall perform all work according to accepted Industry Standards, Safety and Environmental Procedures, and regulations, including Attachment 03 NAVSEA Safety Requirements for Contractors and Subcontractors and the latest revision of Occupational Safety and Health Administration (OSHA) regulations.
3. Prior to the start of work on site, the contractor shall provide an Environmental Protection Plan (EPP) detailing specific methods of handling encountered wastes and refuse, project storm water management and control, and spill response procedures. If sampling and analysis services will be provided, the EPP shall include qualifications of sampling personnel and analytical services provider laboratory accreditation documentation. Include Refrigerant Handling License:
Documentation of 40 CFR 82 refrigerant technician certification for contractor service technicians if contract involves HVAC system work involving refrigerants.
4. Facility Environmental Permits:
A. Equipment and work performed under this contract shall be in compliance with federal, state, and local environmental regulations and existing facility permits.
B. NUWC Keyport has facility permits that place requirements on certain types of work being performed at the facility. Obtain information on requirements from the Base Environmental Office (BEO).
C. Existing Facility Permits include but are not limited to: NA
5. Contractor Employee Required Environmental Training
A. Training must be completed and documented prior to commencing work under this contract at the government facilities. Contact the BEO for instructions on accessing required training.
NBK EMS Awareness/General Environmental Awareness Training (0.5 hr). Available online or in person from the BEO.
Required for all personnel performing work NBK property.
Read and sign Contractor’s Guide to Environmental Compliance
B. NBK Keyport Required Environmental Training (required only for work taking place at NBK Keyport facility)
Hazardous Waste Site Manager/Alternate (Waste Generator) (1.0 hr). Required prior to generation of waste at NBK Keyport facility, for personnel involved in managing hazardous waste generated during the performance of the contract. Available online or in person from the BEO.NBK EMS Awareness/General Environmental Awareness Training (0.5 hr). Available online or in person from the BEO. Required for all personnel performing work NBK property.
NUWC EMS General Environmental Awareness Training (0.5 hr).
Available online or in person from the BEO. Required for all personnel performing work on NBK Keyport property.
Read and sign NAVSEA Warfare Centers Keyport Guide to Environmental Compliance for Contractors and Subcontractors
6. The Contractor shall safely store and manage Hazardous Materials used in the performance of this contract in accordance with applicable federal, state, and local regulations. Submit Safety Data Sheets (SDS’s) and expected quantities of HM to be used and stored in performance of the project and receive approval from the Government prior to HM use in conjunction with this contract, and prior to bringing HM onto government property for the purposes of this contract. For approval to use any hazardous material, submit material SDS’s and Contractor Hazardous Material Inventory (CHMI) form detailing expected material use and storage information for government review and approval. Submit CHMI form prior to performing onsite work and update monthly while actively working on government property.
7. Products prohibited by the Government, which will not be approved for use, include but are not limited to: leads, chromiums, mercury, phenols, trichloroethylene, halons, PCBs, asbestos, silica sand (for use as blasting agent), Class I ODS, radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed in 40 CFR 355.50, Appendix A. This prohibition prevails over any other provision, specification, drawings, or referenced documents. The Contracting Officer may consider exceptions to the use of any of the above excluded materials upon written request by the Contractor, and with BEO approval.
8. Clean Air Act Compliance: Work performed shall be in compliance with the Puget Sound Clean Air Agency (PSCAA) Regulations I, II, and III. Contractor shall identify and receive approved permit for any air pollution generating equipment or processes that may require a Notice of Construction (NOC) pursuant to PSCAA Regulation prior to bringing equipment on site including non-road engines meeting PSCAA Regulation I, Article 15 applicability. Equipment meeting requirements for use under existing government facility NOC permits shall be approved for use by the BEO prior to being brought onsite.
9. All work involving refrigerants shall comply with the requirements of 40CFR 82 and other applicable federal, state, and local regulations to include Section 608 of the Clean Air Act. Any new equipment provided shall not contain Class I or Class II ODS in pure or blended form. All new shore-based, HVAC&R equipment supplied by the contract must use an EPA-SNAP program approved refrigerant with an Ozone Depletion Potential (ODP) of zero. Excess Class I and Class II ODS removed from existing equipment as part of the contract shall be turned in to the government for recycling/disposal. The contractor is responsible for providing adequate cylinders/containers for Class I and Class II ODS. Provide Refrigerant Work Checklist submittal for work performed on equipment containing refrigerants in accordance with 40 CFR 82 requirements.
10. Hazardous (Dangerous) Waste Management: Naval Base Kitsap Keyport is designated as a Large Quantity Generator in accordance with WAC 173-303, and waste generated onsite must be managed under the facility Hazardous Waste management program. Hazardous (dangerous) waste generated at the facility must be shipped and disposed of under the government’s site EPA Waste ID#’s.
The contractor is required to meet the regulatory requirements for large quantity generators for any work conducted within the boundaries of the Naval Base Kitsap Keyport and shall comply with provisions of federal, state, and local regulatory requirements applicable to this generator status regarding training and storage, handling, and disposal of generated wastes.
11. The government shall be responsible for disposal costs for Hazardous (dangerous) waste generated during work performed on government property. The Contractor shall reimburse the Government for HW disposal costs associated with a) spent cleaning supplies, such as contaminated rags, cleaning absorbents, solvents from cleaning machines, and degreasers; and, b) HW from Contractor spills and the spent materials and supplies used to clean the spill. All unused or partially used regulated material ordered by the contractor is the property of the contractor and shall not be left at the facility or turned in to the government for disposal as Hazardous Waste.
12. Hazardous (Dangerous) Waste Profiling (Determination): The Government shall determine whether waste generated during the performance of the contract at government facilities is Hazardous (Dangerous) waste.
A. Naval Base Kitsap (NBK) Keyport: Information required for the control and disposal of Hazardous Waste at NBK Keyport is included in the "Hazardous Waste Site Manager/Alternate (Waste Generator)" training module and the NAVSEA Keyport Contractor's Guide to Environmental Compliance.
Complete Waste Generation Record forms for waste determination for each waste stream expected during work performed under the contract. Contractor personnel submitting Waste Generation Record (WGR) forms must have received facility Hazardous Waste Site Manager/Alternate (Waste Generator) Training and Certification for NBK Keyport.
13. Laboratory Analysis: When, at the sole discretion of the Government, laboratory analytical information is necessary to designate waste, the contractor shall provide sampling and analysis services in accordance with WAC-173-303 and EPA SW-
846. Sampling personnel shall be trained and proficient in environmental sampling and laboratory must meet applicable accreditation for the analysis conducted. Submit sampling personnel qualifications and laboratory accreditation as part of the Environmental Protection Plan (EPP)
14. Submit analytical results and reports to the Government as part of the Waste Generation Record. If the government determines that a waste is not a hazardous (dangerous) waste, the contractor shall dispose of the waste in accordance with federal, state, and local regulations and per guidance in Waste Generation Record form.
15. Hazardous (Dangerous) Waste Management:
A. Identify, minimize, segregate, contain, package, label and turn in Hazardous (dangerous) waste to the Government for disposal. Collect dangerous waste in Department of Transportation (DOT)-approved containers in accordance with 49 CFR 171, 49 CFR 172, and 49 CFR 178 properly labeled to identify the type of waste, hazard to personnel, and the start date. Containers and labels will be supplied by the Government for waste that has been designated as Hazardous/Dangerous. Containers and disposal for waste designated as non-hazardous is the responsibility of the Contractor.
B. Notify the Contracting Officer fourteen (14) calendar days in advance for request of bulk containers that have been designated as Hazardous/Dangerous waste.
C. Accumulate waste in a satellite or Central accumulation area that meets the requirements set forth in WAC-173-303 and approved by the BEO. Contact the Government no more than 45 calendar days from the start date for Central accumulation areas to arrange for transport. Accumulate bulk dangerous waste in a less than Central accumulation area. Turn in non-bulk dangerous waste from a Central accumulation area within 45 days of the start date. Turn in dangerous waste from satellite accumulation areas to the Government prior to exceeding time and quantity limits. Onsite treatment of waste by the contractor is prohibited. Contractor shall not transport Dangerous Waste on or off Government facilities without BEO authorization.
16. Discharge of any industrial wastewater to the sanitary sewer or storm water system is prohibited without prior written approval from the cognizant Government Environmental Division.
17. All contractors and personnel on the project site shall be the competent person and responsible for their own actions. All persons on the project site will have the right to stop work if for any reason that unsafe conditions exist.
1. GENERAL INFORMATION
1.1 Construction Work Categories
Category III construction services are primarily composed of minor renovation or repair. Local environmental or usage permits are required; state or federal permits are not required unless specifically requested in the contract.
Building and/or site approvals are not required. There are no plans and specifications; work is developed from a scope of work supplemented by professional engineering staff as needed with sketches, catalog cuts, and/or narrative descriptions. Examples of typical Category III work include fire protection alarm relocation; pre-engineering buildings (>120 sf) with no utilities; installation of pre-fabricated carports; replacement of conveyors; non-structural demolition; overhead door repair/replacement (>100 sf); replacement of non-load bearing wall; exterior insulation finish system; HVAC package units (<5 tons, ground level); paving, asphalt overlay, large repair; sprinkler head, fire protection relocation/replacement (<21); roof replacement, structural repair in-kind; stairs, interior or exterior, single flight pre-engineering; utilities -connecting to existing with provider consultation; walls partition, no ingress/egress issues, no utilities; and window installation on non-load bearing walls.
1.2 The Unified Facility Guide Specifications
The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of this contract. Where two specifications are listed for a certain item of work the Navy section as denoted by an “N” shall be used. In the absence of specifications use an industry standard specifications or others listed in the Construction Criteria Identified in the Scope of Work. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs
1.3 Proposal Preparation Costs
The costs for preparation of contract proposals shall be the responsibility of the Contractor and not directly reimbursable. The Contractor shall furnish all project management, planning, estimating, labor, transportation, mobilization, materials, equipment, tools, supervision, design if applicable, and all other associated costs necessary to fulfill the requirements of the contract.
1.4 Joint Venture (JV), Limited Liability Companies (LLC), Limited Partnerships (LTD), and ETC.:
Joint Ventures and Limited Liability Companies and Limited Partnerships shall submit the following additional documentation regarding their business entities with the bid:
a. A copy of the JV, LLC or LTD agreement.
b. A detailed statement outlining the following in terms of percentages where appropriate:
1) The relationship of the team/partners/parties in terms of business ownership, capital contribution, profit distribution or loss sharing.
2) The management approach in terms of who will conduct, direct supervise, and control.
3) The structure and decision-making responsibilities of the partners/parties in terms of who will control the manner and method of performance of work.
4) Identify (by name and title) the personnel having the authority to legally bind the partners/parties (including authority to executed the contract documents and bonds).
c. A list of partners/parties, to include company name, DUNS and CAGE numbers, address, point of contact, e-mail address, phone number and facsimile number
NOTE: A bid may be rejected if the company name identified on the bonds is different from the JV, LLC or LTD name identified on the agreement.
1.5 E-PAYROLL
SPECIAL CONTRACT REQUIREMENT FOR CONTRACTOR TO SUPPLY AND USE AN
ELECTRONIC SOFTWARE FOR PROCESSING WAGE RATE REQUIREMENTS (CONSTRUCTION)
ACT CERTIFIED PAYROLLS IN COMPLIANCE WITH FAR 52.222-8, PAYROLLS AND BASIC
RECORDS AND FAR 52.222-13, COMPLIANCE WITH WAGE RATE REQUIREMENTS
(CONSTRUCTION) AND RELATED ACT REGULATIONS.
The US Department of Labor accepts the electronic submission of certified payrolls and the “electronic signature” is accepted for the purposes of “certifying the payroll”. There are several electronic systems currently commercially available to contractors for payroll processing in compliance with the Wage Rate Requirements (Construction) and Related Acts.
The contractor may use a supplemental electronic Wage Rate Requirements (Construction) Act payroll processing system to process and submit certified payrolls electronically to the Government that are compliant with appropriate Wage Rate Requirements (Construction) Act payroll provisions in the FAR. The contractor shall be responsible for obtaining and providing all access, licenses, and other services required for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Wage Rate Requirements (Construction) and Related Act Regulations. The electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion, and providing a durable record copy of all payrolls and other documentation to the government at contract closeout.
The contractor shall obtain and provide access to the Government via the internet with login authorization, as required to comply with the Wage Rate Requirements (Construction) and Related Act Regulations over the duration of this construction contract. The access shall include electronic review access via the internet by the Government contract administrative office to the electronic payroll processing system used by the contractor.
The supplemental electronic payroll processing service shall meet the following basic functional criteria:
commercially available;
compliant with appropriate Wage Rate Requirements (Construction) Act payroll provisions in the FAR;
able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract;
demonstrated security of data and data entry rights;
ability to produce contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate requirements (Construction) payrolls submitted to the government over the life of the contract;
capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout.
This durable record copy of data from the electronic Wage Rate Requirements (Construction) payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor’s provision and use of an electronic payroll processing service shall be included in the contractor’s price for the overall work under the contract. The costs for Wage Rate Requirements (Construction) Act compliance using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract.
1.6 Project Plans and Specifications
This solicitation identifies all available project plans, drawings and specifications that are applicable to the requirement in the Scope of Work.
1.7 Pre-award Site Inspections
Upon receipt of the scope of work, including applicable drawings, and following a brief time period for reviewing the documents, the Contractor shall inspect the job site per the site visit instructions scheduled in Provision L-237- W001. Any deficiencies, conflicts, or other areas of concern existing in the scope of work and applicable drawings should be brought to the attention of the Contracting Officer through the PPI process. The Contractor shall also notify the Contracting Officer upon observing any features in the work required to be performed that appear to be ambiguous, confusing, conflicting or erroneous.
1.8 Subcontracting Responsibilities
The contractor shall be responsible for the management and performance of all subcontractors. The contractor shall ensure subcontractors are competent and capable of handling all assigned work. The contractor shall ensure subcontractor work is completed within the stated requirements.
1.9 Notice of Constructive Changes
No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representative of the Government, shall contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
1.10 Payments
Designated paying office and invoicing procedures will be identified in contract award. Invoices shall be processed according to DFARS 252.232-7003 Electronic Submission of Payment Requests (December 2018) and DFARS 252.232-7006 Wide Area Workflow Payment Instructions. To comply with the clause 252.232.7003, Electronic Submission of Payment Requests (December 2018), the contractor is required to register for WAWF at:
https://wawf.eb.mil/
WAWF information, payment status and training is available from the Procurement Integrated Enterprise Environment or PIEE at: https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml WAWF questions should be directed to the WAWF helpdesk at 866-618-5988 or email at:
disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil
1.11 Construction Schedule
Submit a baseline schedule with start date, end date, major work activities and durations, estimated pre-final (substantially complete) and final (entirely complete) inspection dates, and other major milestones. Provide updates to baseline schedule as needed or as requested (when there is a change to the critical path). Requirements of this deliverable are in Section C – General Requirements under Deliverables and Performance
1.12 Schedule of Values (SOV)
Submit a schedule of values, Attachment 06, with a breakdown of component work activities for which progress payments will be requested twenty-one (21) days after award. The total costs for the component work activities shall equal the total contract price. Requirements of this deliverable are posted in Deliverables and Performance.
Monthly Work-Hour Reports: Monthly work-hour reporting to the Contracting Officer is required to be attached to the monthly billing request. Requirements of this deliverable are posted in Deliverables and Performance. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor.
The Contracting Officer will provide copies of any special forms at the contract Pre-Performance meeting.
1.13 Pre-Performance Conference
Prior to commencing work under this contract, the Contractor shall meet with the Contracting Officer and/or designated technical personnel at a mutually agreeable time to discuss and develop mutual understandings concerning schedule and administering work.
1.14 Weekly and Daily Progress Reports
Reports are to be prepared, signed and dated by the Contractor Project Manager assigned to the project. The contractor shall provide a weekly report that addresses the progress made and how issues identified in Daily Progress Reports were mitigated, to the Government Project Manager through electronic mail. The Contracting Officer will have five (5) business days to address any concerns raised in the weekly Progress Reports that are outstanding. At a minimum, the following information shall be included in each daily report:
Progress this period Status of all tasks developed in the project management plan (with attachment copies of meeting notes, point and working papers).
Indication that the Contract Completion Date (CCD) is being met or if not, a description of new CCD. It must include the reasons for a change in the date and identify the impact of the change on the project.
What is needed from Government in order to meet the CCD.
Activity planned for the next reporting period; planned supporting activities, as well as the status of all products/working papers, including planned CCD and actual and/or anticipated CCD.
Problems encountered; identification of any problems, issues or delays and recommendations as to their resolution concerning the problems submitted during the interim, and any corrective action that was taken to correct identified problems.
Pictures of construction progress of key milestones or events on the project.
1.15 As-Built Drawings
1. When required to be provided as a project close-out submittal, revise identified existing facility record drawings as specified to show all variations between the work performed under this contract and the features shown on the existing facility record drawings.
2. Hard copies of the existing facility drawings will be provided for use after the contract is awarded as requested.
3. Requests for partial payment will not be approved if the marked prints are not kept current. Final payment will not be processed until complete and accurate marked prints are submitted and approved.
CONTRACT ADMINISTRATION DATA
2. MANAGEMENT AND ADMINISTRATION
2.1 Identification of Procuring Contracting Officer
The Procuring Contracting Officer (PCO) is located at: NUWC Division, Facilities Contracting Service, 610 Dowell Street, Keyport WA 98345. Overall administration of the basic contract will be the responsibility of this office. The PCO is responsible for the contract in its entirety and possesses complete authority to modify the terms of the basic contract to include contract interpretation, claims avoidance and resolution, negotiated change orders (as applied to the contract in its entirety), award of option periods, and direction authority.
All correspondence…
This is the start of the file's text. The full file is on GovTribe.