Att_08_Bid_Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Bldg. 81 Refresh and Remodel Restroom
Solicitation number
N0025327Q0005
Issued by

About this file

This is a Bid Form template for solicitation N0025327Q0005 issued by Naval Undersea Warfare Center (NUWC) Division, Keyport. The form instructs contractors to provide detailed pricing and labor breakdowns for the Building 81 Refresh and Remodel Restroom project, which involves converting a men's restroom into a single-occupancy, unisex Americans with Disabilities Act (ADA) compliant restroom. Contractors must complete line items for all tasks required, specifying quantity, unit rate, material costs, labor hours with associated rates, and equipment costs. The form includes example rows demonstrating expected detail levels for tasks such as HVAC installation, site mobilization/demobilization, labor by trade (HVAC technician, electrician, general laborer, Site Safety and Health Officer), and equipment rentals. Contractors must retain all formulas in total calculation cells rather than hard-entering values and must reference the Statement of Work for complete project requirements.

The bid form requires contractors to provide a Firm Fixed Price Proposal Amount for CLIN 0001 (Base Bid), with separate lines for subcontractor performance value, prime contractor and project management costs, subtotal, and overhead and profit calculations. All quotes must be submitted via email to michelle.a.farrales.civ@us.navy.mil and kaci.j.campbell.civ@us.navy.mil in digital format using only the government-provided bid form; company quote forms will not be accepted. This solicitation is a 100% small business set-aside with the applicable NAICS code 238390 and a size standard of $19 million in annual revenue. Pricing must be FOB Destination to NUWC Division, Keyport.

View the file

Other files

File Type Posted
Att_13_Drawing_Distro_A.pdf PDF
Att_07_Past_Perf_Ref.docx DOCX document
Att_04_Guide_Environmental.pdf PDF
Att_09_PPI_Form.docx DOCX document
Att_03_Guide_Safety.pdf PDF
Att_05_Guide_OPSEC.pdf PDF
Att_02_Wage_Determination.pdf PDF
Att_01_Material_Equipment.xlsx XLSX spreadsheet
Att_10_Safety_Data_Sheet.docx DOCX document
Att_06_Schedule_of_Values.xlsx XLSX spreadsheet
Att_11_OSHA_Incident_Rate.pdf PDF
Att_12_Statement_of_Work.pdf PDF
Solicitation - N0025327Q0005.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N0025327Q0005Contractor:
PID Description:Bldg. 81 Refresh and Remodel RestroomDate:
Project Location:Naval Undersea Warfare Center Division, Keyport
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
Bldg. 81 Refresh and Remodel Restroom
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount

File details come from the government source that posted it. Updated .