This file is a material and equipment spreadsheet that serves as an attachment to the solicitation for the Building 81 restroom renovation project at Naval Undersea Warfare Center (NUWC) Division, Keyport. The spreadsheet functions as a detailed inventory or bill of materials specifying the equipment and materials required for the conversion of a men's restroom into a single-occupancy, unisex ADA-compliant restroom. The document appears designed to support vendor quotations by providing exact specifications, quantities, and product requirements necessary for the renovation work, ensuring that all offerors have clear visibility into the materials and equipment that must be included in their proposals submitted to the Navy.

The spreadsheet is a critical reference document for this 100% small business set-aside solicitation (RFQ N0025327Q0005), which requires FOB Destination pricing to Keyport, Washington. All vendor responses must address the materials and equipment listed in this attachment as part of their complete quote submission, which must be returned via email before the solicitation closing date. Offerors must reference this inventory when developing their proposals to ensure compliance with the government's specifications and avoid non-responsive bid rejection.

View the file

Other files

File Type Posted
Att_13_Drawing_Distro_A.pdf PDF
Att_07_Past_Perf_Ref.docx DOCX document
Att_04_Guide_Environmental.pdf PDF
Att_09_PPI_Form.docx DOCX document
Att_03_Guide_Safety.pdf PDF
Att_05_Guide_OPSEC.pdf PDF
Att_02_Wage_Determination.pdf PDF
Att_10_Safety_Data_Sheet.docx DOCX document
Att_06_Schedule_of_Values.xlsx XLSX spreadsheet
Att_11_OSHA_Incident_Rate.pdf PDF
Att_12_Statement_of_Work.pdf PDF
Att_08_Bid_Form.xlsx XLSX spreadsheet
Solicitation - N0025327Q0005.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract No:
Project Title:Bldg. 81 Refresh and Remodel Restroom
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:Replace Breathing Air Filters and Install Carpet
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043563/12/213/12/175094-0-101-154A-40-1H
Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043573/12/213/12/175094-0-101-154A-40-1J
CARPET5094116, 117, 118300SQFT$4,200.00Carpets - 156 Lumber Way,

Bert WA 98317 carpets@msn.com

360-266-0154MohawkMOHAWH - STRBUN/A3/21/193/12/17N/A
Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

File details come from the government source that posted it. Updated .