Att_01_Material_Equipment.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Bldg. 81 Refresh and Remodel Restroom
- Solicitation number
- N0025327Q0005
About this file
This file is a material and equipment spreadsheet that serves as an attachment to the solicitation for the Building 81 restroom renovation project at Naval Undersea Warfare Center (NUWC) Division, Keyport. The spreadsheet functions as a detailed inventory or bill of materials specifying the equipment and materials required for the conversion of a men's restroom into a single-occupancy, unisex ADA-compliant restroom. The document appears designed to support vendor quotations by providing exact specifications, quantities, and product requirements necessary for the renovation work, ensuring that all offerors have clear visibility into the materials and equipment that must be included in their proposals submitted to the Navy.
The spreadsheet is a critical reference document for this 100% small business set-aside solicitation (RFQ N0025327Q0005), which requires FOB Destination pricing to Keyport, Washington. All vendor responses must address the materials and equipment listed in this attachment as part of their complete quote submission, which must be returned via email before the solicitation closing date. Offerors must reference this inventory when developing their proposals to ensure compliance with the government's specifications and avoid non-responsive bid rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att_13_Drawing_Distro_A.pdf | ||
| Att_07_Past_Perf_Ref.docx | DOCX document | |
| Att_04_Guide_Environmental.pdf | ||
| Att_09_PPI_Form.docx | DOCX document | |
| Att_03_Guide_Safety.pdf | ||
| Att_05_Guide_OPSEC.pdf | ||
| Att_02_Wage_Determination.pdf | ||
| Att_10_Safety_Data_Sheet.docx | DOCX document | |
| Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| Att_11_OSHA_Incident_Rate.pdf | ||
| Att_12_Statement_of_Work.pdf | ||
| Att_08_Bid_Form.xlsx | XLSX spreadsheet | |
| Solicitation - N0025327Q0005.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | Bldg. 81 Refresh and Remodel Restroom | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .