Solicitation - N0025326R7006.pdf

PDF 3 MB Posted

Attached to
Refurbishment of Torque Motor Magnetic Field Ring Assemblies
Solicitation number
N0025326R7006
Issued by

About this file

This is a Solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract issued by the Department of the Navy, Naval Sea Systems Command (NAVSEA). The solicitation N0025326R7006, dated February 11, 2025, seeks refurbishment of magnetic azimuth and elevation rings (DMISA rings) used in torque motor assemblies. The work involves removal of magnets, refurbishment of ring assemblies, installation of new magnets, grinding where necessary, and comprehensive testing and inspection of four ring variations: plated steel elevation rings, stainless steel elevation rings, plated steel azimuth rings, and stainless steel azimuth rings. Offers must be submitted using firm fixed-price arrangements with a 60-calendar-day acceptance period unless otherwise specified by the offeror.

The contract includes first-article testing requirements for all four ring variations, with deliverables due 180 calendar days after receipt of Government-furnished property (GFP). Production requirements span five contract years (Years 1-5) with quantities of 125 each in Year 1 and 127 each in Years 2-5 for each ring type. The minimum order quantity is 1 each with a maximum of 508 each per order; the Government's maximum cumulative quantity is 2,540 each. Inspection and acceptance will be performed by the Government at NUWC Division Keyport, Naval Sea Logistics Center, Keyport, Washington 98345-7610, with 60-90 day inspection/acceptance periods depending on the line item. All deliveries must include Test and Inspection Data Sheets (CDRL A001) and comply with ISO 9001:2015 quality management system requirements. The contract is rated under the Defense Priorities and Allocations System (DPAS). Offerors must provide DoD unique identification or equivalent for all items and comply with DFARS 252.211-7003 item identification and valuation requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

Refurbishment of Magnetic Azimuth and Elevation Rings

Refurbishment of Elevation Rings Product Service Code: 4920 Date: 11 Feb 2025

N0025326R7006

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Offeror shall submit Section B pricing for each priced CLIN/SLIN. The Section B pricing will take precedence should there be any discrepancies with any other pricing information submitted. As such, any delivery orders placed against the resulting Indefinite-Delivery Indefinite-Quantity (IDIQ) contract will be made to the successful Offeror using its proposed Section B pricing.

MINIMUM GUARANTEE: As referred to in paragraph (b) of the "Indefinite Quantity" clause (FAR 52.216-22 of this contract, the contract minimum guarantee will be met with the issuance of the first delivery order for first articles or the value of the first articles. The maximum quantity is the total 'not to exceed' quantity for each item as set forth in the schedule. The maximum quantity is not to be exceeded without prior approval of the Procuring Contracting Officer.

Allowed Per Order Minimum: 1 Each Maximum: 508 Each

Government Minimum/Maximum to Order Maximum: 2,540 Each

Item Supplies/Service Estimated Quantity

Unit Unit Price Amount

PLATED STEEL ELEVATION MAGNET RING - FIRST

ARTICLE TESTING REQUIREMENT

This is a first article/pre-production requirement.

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-001 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

2 Each

STAINLESS STEEL ELEVATION MAGNET RING - FIRST

ARTICLE TESTING REQUIREMENT

This is a first article/pre-production requirement.

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-002 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435

2 Each

PR Line Item Number: 0000

PLATED STEEL AZIMUTH MAGNET RING - FIRST ARTICLE

TESTING REQUIREMENT

This is a first article/pre-production requirement.

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-003 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

2 Each

STAINLESS STEEL AZIMUTH MAGNET RING - FIRST

ARTICLE TESTING REQUIREMENT

This is a first article/pre-production requirement.

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-004 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

2 Each

CDRL A001 - TEST & INSPECTION DATA SHEET

Data in accordance with Exhibit A, Data Items A001: Contract Data Requirements Lists, DD Form 1423-1.

Provide Test & Inspection Data Sheet with every delivery.

Delivery Schedule is with every delivery.

(Not Separately Priced).

Classification: CDRL Pricing Arrangement: Firm Fixed Price

1 Lot

YEAR ONE (1) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-01 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

125 Each

YEAR ONE (1) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-002 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

125 Each

YEAR ONE (1) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-003 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

125 Each

YEAR ONE (1) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-004 Pricing Arrangement: Firm Fixed Price PR Number: 1301094435 PR Line Item Number: 0000

125 Each

YEAR TWO (2) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-01 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR TWO (2) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item 127 Each

Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-002 Pricing Arrangement: Firm Fixed Price

YEAR TWO (2) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-003 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR TWO (2) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-004 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR THREE (3) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-01 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR THREE (3) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-002 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR THREE (3) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD

127 Each recognized unique identification equivalent.

Print or Drawing: 7447999-003 Pricing Arrangement: Firm Fixed Price

YEAR THREE (3) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-004 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FOUR (4) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-01 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FOUR (4) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-002 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FOUR (4) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-003 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FOUR (4) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

127 Each

Print or Drawing: 7447999-004 Pricing Arrangement: Firm Fixed Price

YEAR FIVE (5) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-01 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FIVE (5) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL ELEVATION MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-002 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FIVE (5) PRICING - PRODUCTION REQUIREMENT -

PLATED STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-003 Pricing Arrangement: Firm Fixed Price

127 Each

YEAR FIVE (5) PRICING - PRODUCTION REQUIREMENT -

STAINLESS STEEL AZIMUTH MAGNET RING

Delivery Schedule is 180 days after receipt of GFP

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Print or Drawing: 7447999-004 Pricing Arrangement: Firm Fixed Price

127 Each

Section C - Description/Specifications/Statement of Work

Statement of Work (SOW) for Refurbishment of Torque Motor Magnetic Field Ring Assemblies (DMISA RINGS)

1. SCOPE

1.1. Work includes the refurbishment and repopulation of Government supplied magnetic rings following the procedures specified in the applicable references of Section 2. Magnetic rings come in four variations, with specific requirements defined for each within the applicable procedure. Rings require the removal of magnets, refurbishment, and installation of new magnets. Depending on the variation, the repopulated magnet rings may need grinding in order to ensure the item meets the final required dimensions. Tests and inspections are required for all refurbished rings. Coordinate with the Contracting Officer and Technical Point of Contact regarding any damaged magnet rings.

2. APPLICABLE DOCUMENTS

2.1. Required documents are listed in Table 2-1.

TABLE 2-1. Applicable Documents

ID Document Number Revision Title

2.1 7447999 I Rebuild Requirements for Torque Motor Permanent Magnetic Field Ring Assemblies

2.2 7448000 F Magnet, Torque Motor

3. GENERAL REQUIREMENTS

3.1. Identify part number of magnet ring to be worked in accordance with (IAW) Reference 2.1.

3.2. Perform magnet ring depopulation IAW Section 3.1 of Reference 2.1.

3.3. Obtain required replacement magnets as specified by Section 4.0 of Reference 2.1. See Reference 2.2 for requirements of each individual magnet part number.

3.4. Perform magnet ring repopulation IAW Section 4.0 of Reference 2.1. Applicable subsections within Section 4.0 are specific to each magnetic ring part number.

3.5. Perform test and inspections IAW with applicable subsections in 4.0 of Reference 2.1.

3.6. CDRL A001

3.7. Package and ship per the following:

Contractor shall individually wrap each ring in a polyethylene material of such thickness that normal handling will not cause abrasions or punctures and, there will be no interchange of environmental air. Each wrapped ring shall be placed in the NUWC Division Keyport supplied foam packaging. Each ring package shall be marked with the motor type number, ring serial number, date of rebuild, name of supplier, and contract or order number. Packaged rings shall be prepared for shipping in accordance with best commercial practices. Note that if rings are to be shipped by air, packaging must conform to 49 CFR 173.21 and other applicable regulations. Boxes shall be clearly labeled to indicate magnetic contents. See Section 6 of Reference 2.1.

4. Government Furnished Property (GFP):

4.1. This contract includes GFP in the form of torque motor magnetic field ring assemblies.

4.2. DAMAGED MAGNETIC RINGS - During performance a Government supplied magnetic ring may be identified as damaged, requiring repair or return to the Government. In such an event, the contractor shall coordinate with the Contracting Officer and Technical Point of Contact to establish a process for repairs or return to the Government.

Requirements Refurbish (De-Populate and Re-Populate) Industrial Magnets on Azimuth and Elevation Rings

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(Endof Text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of Text)

C-209-H002 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (APR 2024) (Apr 2024)

(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used. The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "First Article Approval--Government Testing" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements.

(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A dated 25 June 2013.

(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Government Testing", the First Article shall not be delivered as part of the production quantity.

(End of text)

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018) (Dec 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

(End of Text)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of Text)

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018) (Oct 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

(End of Text)

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018) (Oct 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal dated in response to NAVSEA Solicitation No.

N0025326R7006.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

(End of Text)

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List (CDRLs), DD Form 1423, , Exhibit(s) CDRL A001 A, attached hereto.

(End of Text)

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC

(NAVSEA) (OCT 2018)

(Oct 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;

and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal

(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

(End of Text)

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018) (Oct 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

(End of Text)

C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2024) (Apr 2024)

(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.

(b) - General Requirement

(1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation. The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract. If required, the Contractor's Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow noncompliance.

Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639E approved 11 February 2020, EIA-649-1A dated 10 August 2020, and MIL-HDBK-61B dated 7 April 2020 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed rewrite, to facilitate baseline documentation changes.

(d) - An NECP shall be submitted whenever necessary to Non-Engineering Change Proposals (NECPs) document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.

The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of noncompliance and the effect on ship equipment or system operation.

(f) - For its effort expended in preparing ECPs, Equitable Adjustments for Change Documentation Preparations NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:

(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.

(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.

(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.

(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.

(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.

(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.2331).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.2481) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.

(End of text)

C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE

I (NAVSEA) (MAY 2019)

(May 2019)

(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.

(b) . GFI is defined as that information essential for the installation, test, operation, Government Furnished Information (GFI) and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:

(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or

(ii) add items of data or information to the attachment identified in Section J; or

(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:

(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or

(2) By submitting a request to the

Department of Defense Single Stock Point (DoDSSP)

Building 4, Section D

700 Robbins Avenue

Philadelphia, Pennsylvania 19111-5094

Telephone (215) 697-6396

Facsimile (215) 697-9398

Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.

(End of Text)

C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA)

(OCT 2018)

(Oct 2018)

The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor's personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

(End of Text)

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

(End of Text)

N0025326R7006 https://assist.dla.mil/online/start/

Section D - Packaging and Marking

Additional Regulation or Supplemental Clauses Incorporated by Full Text

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022) (Feb 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.

(End of Text)

D-211-H005 IDENTIFICATION MARKING OF PARTS -- ALTERNATE I (NAVSEA) (OCT 2018) (Oct 2018)

(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 - Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.

(2) Parts manufactured to Government specifications shall be marked as follows:

(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.

(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK- 454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.

(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N (1).

(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

(End of Text)

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018) (Oct 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

(End of Text)

D-247-W002 UNPACKING INSTRUCTIONS (NAVSEA) (OCT 2018) (Oct 2018)

(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked "UNPACKING INFORMATION" and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked "UNPACKING INFORMATION".

(b) Marking Containers. When unpacking instructions are provided, shipping containers will be stenciled "CAUTION-THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS ARE CAREFULLY FOLLOWED. UNPACKING INSTRUCTIONS ARE LOCATED [ ]." When practical, this marking will be applied adjacent to the identification marking on the side of the container. insert location

(End of Text)

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)

Item(s) The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for 0001 - 0004 and 1001 - 5004 Commercial Packing.

(End of Text)

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022) (Feb 2022)

(a) . Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May 2018, Marking Standard Practice for Commercial Packing.

(b) . A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, Packing List(s) shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) . In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one Master Packing List shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) . All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit packPart Identification

(s) or shipping container by part number and/or national stock number.

(End of Text)

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-15 Certificate of Conformance. Apr 1984 52.246-16 Responsibility for Supplies. Apr 1984

FAR Clauses Incorporated by Full Text

52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015 Certification, or an equivalent QA Program

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such…

This is the start of the file's text. The full file is on GovTribe.