Solicitation Amendment N0025326R70060001 SF 30.pdf
PDF 637 KB Posted
- Solicitation number
- N0025326R7006
About this file
This document is Amendment 0001 to Solicitation N0025326R7006, issued by the Naval Undersea Warfare Center Division Keyport on October 19, 2026.
The amendment extends the solicitation closing date from October 19, 2026 to October 27, 2026 at 1400 Pacific time. Key changes include removal of ISO 9001:2015 certification requirements and related quality management system clauses (C-246-H002, 52.246-11, E-246-H020, and H-246-H001), along with elimination of associated evaluation subfactors. Three DFARS clauses regarding magnets, tantalum, tungsten, and Russian fossil fuel restrictions were removed and replaced with updated versions, including DFARS 252.225-7964 (June 2026 deviation), DFARS 252.225-7966 (Revision 2), and DFARS 252.225-7967 (Revision 2). A new clause addressing DEI discrimination (52.222-90) was added, and Attachment 04 containing vendor questions and answers was incorporated.
The solicitation remains an indefinite-quantity (IDIQ) contract for refurbishment of Torque Motor Magnetic Field Ring Assemblies in accordance with NAVSEA Drawings 7447999 Rev I and 7448000 Rev F. Evaluation will use Lowest Price Technically Acceptable (LPTA) procedures based on technical capability, past performance, and price factors. Proposals are due via encrypted email to rebecca.a.jett.civ@us.navy.mil with a 15-page limit for technical proposals and up to three past performance references. Small Business Subcontracting Plans are required for large business offerors. Offerors must hold Conditional Level 2 (Self) CMMC certification and JCP certification to access controlled technical data.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this amendment is as follows:
1. Remove the requirement for ISO 9001:2015 as a higher-level quality management system and all related requirements and references as follows:
- C-246-H002, Government Use of Contractor's Inspection Equipment o Clause Removed
- 52.246-11, Higher-Level Contract Quality Requirement o Clause Removed
- E-246-H020, Quality Management System Requirements o Clause Removed
- H-246-H001, Calibration System Requirements o Clause Removed
- Section L, 1.3 Submission Factors, Subfactor 2 o Changed to Reserved
- Section M, 1. Evaluation Factors for Award, A. Evaluation Criteria, 1. Factor 1 Technical, b. Subfactor 2: Technical Quality o Changed to Reserved
2. Add Attachment 04, Vendor Questions and Answers.
3. Remove the following DFARS Clauses and Provisions:
- DFARS 252.225-7052, Restrictions on the Acquisition of Certain Magnets, Tantalum, and Tungsten.
- DFARS 252.225-7966, Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (Deviation 2024-O0006, Revision 1)
- DFARS 252.225-7967, Prohibition Regarding Russian Fossil Fields Business Operations (Deviation 2024-O0006, Revision 1)
4. Add the following DFARS clauses and Provisions:
- DFARS 252.225-7964, Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten (JUN 2026) (DEVIATION 2026-O0041).
- DFARS 252.225-7966, Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (Deviation 2024-O0006, Revision 2)
- DFARS 252.225-7967, Prohibition Regarding Russian Fossil Fields Business Operations (Deviation 2024-O0006, Revision 2)
5. Extend the solicitation closing date and time from 1400 (Pacific) on 19 October 2026 to 1400 (Pacific) on 27 October 2026.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 19 Oct 2026 27 Oct 2026
N0025326R70060001
Section C - Description/Specifications/Statement of Work
Additional Information/Notes
The following clauses were deleted:
Other Clauses
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
C-246-H002
GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT
(NAVSEA) (OCT 2018)
(Oct 2018)
The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor's personnel shall be made available for operation of such devices and for verification of their accuracy and condition.
(End of Text)
Section E - Inspection and Acceptance
The following clauses were deleted:
FAR Clauses Incorporated by Full Text
52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)
Higher-Level Contract Quality Requirement (Dec 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015 Certification, or an equivalent QA Program
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Other Clauses
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:
2015 "Quality Management Systems - Requirements" and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
(End of Text)
Section H - Special Contract Requirements
Additional Information/Notes
The following clauses were deleted:
Other Clauses
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
H-246-H001 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (FEB 2023) (Feb 2023)
(a) Definitions:
(1) All definitions, with the exception of Commercial Service Provider, are found in OPNAVINST3960.16 (series).
(2) Commercial Service Providers. Suppliers of tools, instruments, fixtures, test, measurement, and diagnostic equipment, including original equipment manufacturers, who may calibrate their own products but are not engaged in calibration as a major line of business, and other commercial laboratories that provide either calibration services in support of Navy contracts, or low volume, model specific, or unique parameter calibration services.
(b) The accuracy of Navy and Contractor calibrated equipment used for quantitative and qualitative measurements are ensured through measurement traceability. The Contractor is required to ensure that all calibrated equipment used for quantitative or qualitative measurements required for the research, design, test, production, and maintenance of NAVSEA systems will be maintained and calibrated in accordance with references OPNAVINST 3960.16 and NAVSEAINST 4734.1. Calibration sources shall be accredited by a U.S.
based, Navy approved accreditation body to U.S. national standards:
(1) ANSI/NCSL Z540.3, Requirements for the Calibration of Measuring and Test Equipment, dated 3 Aug 2006; or
(2) ISO/IEC 17025:2017, General Requirements for the Competence of Testing and Calibration Laboratories (3rd Edition), dated 29 Nov 2017; or
(3) Certified by the U.S. Navy to NAVSEA 04-4734, Navy and Marine Corps Calibration Laboratory Audit /Certification Manual.
(c) ISO/IEC 17025:2017 and ANSI/NCSL Z540.3 accreditations must be performed by a U.S. based accreditation body. Calibration accreditation must include the parameters required to execute the calibration at appropriate ranges and tolerances. A calibration certificate meeting the requirements of ANSI/NCSL Z540.3 or ISO/IEC 17025:2017 must be provided with the returned calibrated unit. The calibration certificate must be evaluated to confirm that the calibration was performed within the laboratory's accreditation scope and that each calibration measurement met or exceeded a 4:1 Test Uncertainty Ratio (TUR).
(d) Certification to Navy standard NAVSEA 04-4734, is acceptable in place of ANSI/NCSL Z540.3 and ISO /IEC 17025:2017 accreditations. For activities certified to NAVSEA 04-4734, calibrations must be evaluated to confirm that the calibration was performed within the laboratory's NAVSEA scope of certification, and calibration event records shall be provided to the Government upon request. Calibration intervals that deviate from NAVSEA OD 45845, Metrology Requirements List (METRL), shall reflect Test, Measurement and Diagnostic Equipment (TMDE) end of period reliability greater than 85%. TMDE reliability data shall be provided upon request. TURs shall be greater than or equal to 4:1, or ensure a Probability of False Acceptance (PFA) of 2% or less and a Probability of False Rejections (PFR) of 15% or less. Measurement traceability, including TUR, PFA, and PFR shall be documented in accordance to MIL-STD-1839. Calibration procedures, methods, and measurement traceability used by the Contractor shall be provided to the Government upon request.
(e) All calibrations supporting this contract shall meet the requirements of OPNAVINST 3960.16. If the Contractor executes, subcontracts or outsources the initial or reoccurring calibration of calibrated equipment, the respective calibration laboratory, and all of their employees who perform calibration or supply calibrated equipment, shall be certified or accredited to the requirements of paragraphs (b), (c), and (d).
(f) Contractors electing certification to NAVSEA 04-4734 will contact the Contracting Officer's Representative (COR) or Technical Point of Contact (TPOC) within 60 days of contract award, who will then contact the NAVSEA09MM METCAL Technical Warrant Holder (TWH), at NAVSEA_METCAL_INSERVICE@us.navy.
mil, to begin the Navy certification process.
(End of Text)
N0025326R70060001 mailto:NAVSEA_METCAL_INSERVICE@us.navy.mil mailto:NAVSEA_METCAL_INSERVICE@us.navy.mil
Section I - Contract Clauses
Miscellaneous text in this section has been modified to:
Additional Clauses Added by Reference
FAR / DFARS Clause Number
Title Date
52.203-3 Gratuities (Apr 1984)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014)
52.211-13 DEV Time Extensions (Sept 2000)
52.215-2 Audit and Records-Negotiation (Apr 2026)
52.215-8 DEV Order of Precedence-uniform Contract Format (Apr 2026)
52.215-11 DEV Price Reduction for Defective Certified Cost or Pricing Data-Modifications (Apr 2026)
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022)
52.219-9 Alt II Small Business Subcontracting Plan (Alt II) (Jan 2025)
52.219-16 Liquidated Damages - Subcontracting Plan (Feb 2026)
52.244-6 DEV Subcontracts for Commercial Products and Commercial Services (Apr 2026)
52.246-23 Limitation of Liability (Feb 1997)
52.248-1 Value Engineering (Apr 2026)
252.219-7996 DEV Small Business Subcontracting Plan (DoD Contracts) (DEVIATION 2026-O0037)(FEB 2026) (Feb 2026)
252.225-7961 DEV
Restriction on Acquisition of Certain Magnets, Tantalum, and Tungsten (JUN 2026)
(DEVIATION 2026-O0041)
(Jun 2026)
252.225-7967 DEV
Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006, Revision 2)
(Oct 2026)
252.227-7025 Limitations on the Use or Disclosure of Government-Furnished Information Marked With Restrictive Legends
(Jan 2025)
Additional Clauses Added by Full Text
52.216-22 Indefinite Quantity (Apr 2026)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the
Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the ordering period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order, which may include order options to be exercised after the ordering period of this contract but before the end of the period of performance of the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order, including options exercised, to the same extent as if the order were completed during the contract's ordering period; provided, that the Contractor shall not be required to make any deliveries under this contract after . 185 days after the date of contract expiration
(End of clause)
52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) (DEVIATION Apr 2026)
(a) Definition. As used in this clause -means membership or participation in, or access or admission to: training, mentoring, orProgram participation leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.
means disparate treatment based on rave orRacially discriminatory diversity, equity, and inclusion (DEI) activities ethnicity in the recruitment, employment (e.g. hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.
(b) In connection with the performance of work under this contract, the Contractor agrees as follows:
(1) The Contractor will not engage in any racially discriminatory DEI activities.
(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause.
(3) In the event of the Contractor's or subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further
Government contracts.
(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer.
(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.
(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).
(c) The Contractor must include the substance of this clause, including paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, for which the place of delivery or performance is in the United States.
(End of clause)
Additional Information/Notes
The following clauses were deleted:
DFARS Clauses Incorporated by Reference
Variation
Number Title Effective Date Alternate/ Deviation
Effective Date
252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten. May 2024
252.225-7967 Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006, Revision 1)
Feb 2024 Deviation 2024-O0006 Feb 2024
Section J - List of Attachments
The following attachments were added:
N0025326R7006 Attachment 04, Vendor Questions and Answers
Section K - Representations, Certification, & Other Statements
Additional Clauses and/or Provisions Added by Reference
FAR / DFARS Clause or Provision Number
Title Date
252.225-7966 (DEV)
Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (Deviation 2024-O0006, Revision 2)
(Oct 2026)
The following clauses were deleted:
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operations- Representation (Deviation 2024-O0006, Revision 1)
Mar 2024 Deviation 2024-O0006 Mar 2024
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Additional Clauses by Reference
FAR Provision Number
Title Date
DFARS Provision Number
Title Date
252.215-7008 Only One Offer
(DEC
2022)
252.215-7010 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data--Basic
(MAY
2024)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
PROPOSAL SUBMITTAL INSTRUCTION
GENERAL
A. Failure to provide all information required by this solicitation and any subsequent amendment(s) may render your offer to non-compliant.
B. The Government intends to evaluate proposals and award a single IDIQ contract based upon initial proposals. Therefore, the Offeror's initial proposal should contain its best terms in relation to the evaluation criteria. However, in accordance with the clause FAR 52.215-1, Instructions to Offerors - Competitive Acquisition, the Government may contact all or a limited number of Offerors with questions concerning its proposal.
C. With regards to L-215-H007, Submission of Questions by Offerors - Alternate I (NAVSEA)(NOV 2021), the point of contact for this solicitation is identified in Block 10 of the Standard Form 33 (SF33). Do not include Government drawings or Government protected information in the email unless the email is digitally encrypted per Federal Information Processing
.Standard (FIPS) Publication 140-3
D. The solicitation is available at SAM.gov and through the Solicitation Module on PIEE at https://piee.eb.mil/sol/xhtml/unauth /index.xhtml. The Government may post additional information relating to this solicitation (e.g. responses to questions, amendments, etc.). It is the Offeror's responsibility to check the site[s] for any such information.
E. Drawings, the Exhibits, and/or Attachments identified in Section J are provided at SAM.gov and through the Solicitation Module on PIEE at https://piee.eb.mil/sol/xhtml/unauth/index.xhtml. To obtain Drawings, Exhibits, and Attachments, the Offeror must submit a request to the POC identified in Block 10 of the SF33. The request shall include company name; complete address; CAGE code;
and POC name, email address, phone number, and a current and signed DD Form 2345. All drawings are restricted by the Arms
Export Control Act and Distribution Statement D. Drawings will be provided only those companies that meet the following requirements:
1. Compliance with K-227-W001, Instructions for Obtaining Export-Controlled Technical Data (NAVSEA)(OCT 2018).
Only the entity bearing an active JCP certification may allow their Data Custodian or Alternate Data Custodian identified on the entity's DD 2345 (The Contracts Department will validate the DD2345, against https://cage.dla.mil/, and with DLA directly) to request access to and be provided with attachments. Instructions for completing and submitting the DD Form 2345 to request JCP certification can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/. The Government will not extend or delay the procurement for pending contractor JCP certifications or validations.
2. Per DFARS clauses 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (JAN 2023) and 252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirement (NOV 2025), applies to this procurement. The Offeror shall have a current (not more than 180 days for Conditional Level 2 (Self) assessments), minimum Conditional Level 2 (Self) on the Cybersecurity Maturity Model Certification (CMMC) Report within the Supplier Performance Risk System (SPRS). Guidance regarding the CMMC Condition Level can be found at https://www.sprs.csd.disa.mil/ . Drawing access will only be granted to those vendors with a current (not more than 180 days for Conditional Level 2 (Self) assessments), minimum Conditional Level 2 (Self) on the Cybersecurity Maturity Model Certification (CMMC) Report within the Supplier Performance Risk System (SPRS). The Government will not extend or delay the procurement for pending Contractor CMMC assessments.
F. In order to ensure compliance with all the specification requirements, the Offeror shall indicate in its offer and notify the Government in a cover letter, what specifications, if any, the Offeror does not intend to meet. The Offeror shall explain, in detail, how any proposed deviation/exception will nonetheless meet the Government's functional requirements; failure to do so may result in a rating of "unacceptable". Failure to notify the Government of all exceptions prior to award may be grounds for contract termination. Should descriptive literature be supplied by the Offeror, it will be presumed that the Offeror intends to meet all of the specifications, regardless of the descriptive literature, unless the Offeror specifically notes its exceptions. If no exceptions are taken, clearly so state.
G. It is the Offeror's responsibility to exercise due diligence to discover and to bring to the attention of the contracting officer at the earliest possible time, in writing, any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated by reference herein.
H. Offeror shall comply with DFARS 252.204-7000, Disclosure of Information, regarding the release of any unclassified information (e.g. Attachments, Drawings) to anyone outside the Contractor's organization.
1. PROPOSAL SUBMISSION
The Offeror shall submit all proposal requirements via encrypted email to rebecca.a.jett.civ@us.navy.mil before the date and time (Pacific) specified on page 1 of the SF33 or the most recent SF30 Amendment.
A. The factors for this solicitation are:
1. Factor 1: Technical
2. Factor 2: Past Performance
3. Factor 3: Price as indicated on the SF 33
4. Factor 4: Contract Documentation
a. Cover Letter
b. Solicitation Fill-ins if not completed within the SF 33
c. Small Business Subcontracting Plan in accordance with L-219-H001
B. The proposal submission will be contained in the following separate electronic files (eFiles):
1. Technical Price SF 33 and all Amendments, signed by Offeror
2. Past Performance
3. Price SF 33 and all Amendments, signed by Offeror
4. Contract Documentation
N0025326R70060001 https://cage.dla.mil/ https://www.sprs.csd.disa.mil/ mailto:rebecca.a.jett.civ@us.navy.mil
C. Use the Offeror's Company Name and the Title of the document as the eFile name. Since the submittal documents will contain Source Selection Information and Business Sensitive Information, the documents are considered Controlled Unclassified Information (CUI); therefore, each eFile name shall begin with "CUI". For example:
1. CUI Company Name Technical;
2. CUI Company Name Past Performance;
3. CUI Company Name Priced SF33;
4. CUI Company Name Contract Documentation
1.1 Format
A. It is the Offeror's responsibility to include the appropriate classification marking(s) and handling instruction for all proposal submittals. All submittals shall be Unclassified.
B. The Offeror must comply with the detailed instructions for the format and content of the proposals in order to maximize efficiency in the proposal evaluation process. Proposals that do not comply may be considered non-compliant and may render the Offeror ineligible for award.
C. Only eFiles will be submitted/accepted (no paper files). The eFiles shall be uncompressed. Only PDF files will be accepted, with the exception of spreadsheets, worksheets, or workbooks, which shall be submitted using Microsoft Excel 2016 compatible applications. Google Docs format is not acceptable.
D. All files shall be searchable.
E. It is the Offeror's responsibility to ensure the printed format of the files are acceptable. If the Government decides to print a file, it will not reformat the file to fix formatting issues.
F. Each eFile shall include the following information, which are not included in the page limits:
1. Cover Page
2. Table of Contents
3. List of Figures, if applicable
4. List of Tables, if applicable
5. List of Appendices, if applicable
6. List of Abbreviations and Acronyms, if applicable
G. Duplicated information within a given factor may be included in full once and by reference thereafter, as long as there is a clear reference to the duplicated information. If the duplicated information is for different evaluation factors, it must be included in full text within each factor's eFile.
H. Each document shall contain the Offeror's name and solicitation number at the top of each page. Each document shall contain the date of the proposal and page number at the bottom of each page. Any pages that may be revised as a result of discussions, if required, shall contain revision numbers and dates. Legibility, clarity, and compliance with the solicitation requirements are essential.
I. Use font style Times New Roman or Courier New and a font size no smaller than 12-point on standard 8-1/2 by 11-inch page. Text line spacing shall be at least 1.5 lines. One-inch margins on all sides. Text within tables, diagrams, pictorial charts, or graphic material may use Times New Roman or Courier New 10-point font. Page size up to 11 by 17 inches may be used only for diagrams, charts, or graphic material. Page sizes larger than 8- 1/2 by 11 inches will be counted as two pages. Unless otherwise specified, pages larger than 8-1/2 by 11 inches may include only the narrative sufficient to describe the diagram, chart, or graphic material. Every major section, figure, and table shall be numbered. Proposal material shall be presented in a single column on each page. Failure to comply with these requirements may result in the proposal being deemed non-compliant.
J. Page Count. Each page that includes material with printed matter and figures, except those items identified in paragraph 2.1.F above, is counted. Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally Left Blank". Every page, except those marked as blank, must be numbered. Pages exceeding the page limit shall be removed from the end of the volume that exceeds the page count and will not be evaluated.
K. Include unlocked spreadsheets. Submission of locked or non-editable spreadsheets is not acceptable.
L. The Offeror shall not embed any files in the eFiles. The Offeror shall ensure all files are virus free.
M. Although legible, neat, orderly, and comprehensive proposal(s) are required, elaborate brochures or other presentations beyond sufficient to present a complete and effective explanation are not desired. Elaborate artwork, expensive visual or other presentation aids are neither necessary nor desired.
N. The proposal shall contain all of the pertinent information in sufficient detail to permit evaluation. The proposal shall be detailed and complete to demonstrate clearly that the Offeror has a comprehensive understanding of all requirements. If an Offeror fails to comply with content requirements, its proposal may be deemed non-compliant for failure to follow instructions.
O. Subcontractor price information may be contained within the Prime's Price eFile, or the Subcontractor may submit its data directly to the Government. It must be received prior to the date and time set forth in Block 9 of the SF33, comply with all applicable instructions contained herein, and clearly identify the Prime Contractor.
1.2 Content
The page counts include all material with printed matter and figures except as stated in paragraph 1.1.F (Format E-file) above. Any deviation from the requirements below may render your offer non-compliant, and therefore not considered. The Offeror's proposal shall include:
Technical - See paragraph 1.3.A, Factor 1, Technical.
Past Performance - See paragraph 1.3.B, Factor 2, Past Performance.
Price - See paragraph 1.3.C, Factor 3, Price.
Contract Documentation - See paragraph 1.3.D, Factor 4, Contract Documentation.
1.3 Submission Factors
The Offeror's proposal shall demonstrate understanding of the requirements and the proposed method of completing the Section C Specifications and all other requirements of the solicitation. The proposal must meet or exceed the specifications in the solicitation and any subsequent amendments to be considered for award. Offeror's proposal shall address Factors 1 through 3.
a) Factor 1, Technical
i) The technical proposal shall not exceed 15 pages for all Subfactors combined, not including the cover page. The technical proposal shall not contain any price-related information. Offeror shall provide all necessary information for a comprehensive technical evaluation for the Government to determine the extent of the Offeror's technical ability to perform the requirements described in Section C of the solicitation. The Offeror's technical proposal shall address each of the Subfactors listed below.
(1) Subfactor 1: Technical Capability
(a) Offeror shall demonstrate the technical ability to Refurbishment of Torque Motor Magnetic Field Ring Assemblies, in accordance with (IAW) NAVSEA Drawings 7447999 Rev I and 7448000 Rev F, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications.
(2) RESERVED
(a) RESERVED
(3) Subfactor 3: Technical Risk Management
(a) Offeror shall provide its risk mitigation process, an assessment of the risk areas specific to the requirements in this solicitation, and a plan for risk mitigation based on the drawings provided.
b) Factor 2, Past Performance
i) Not to exceed 3 pages per reference and shall not contain any pricing information.
ii) Contractor shall submit up to three references for the Prime and up to two references for each proposed major subcontractor in accordance with the solicitation, utilizing Attachment 2 from Section J, "Past Performance References". Please ensure all information is current and Points of Contact are accessible.
iii) Offeror shall demonstrate past performance and the ability to deliver products of high quality by completing Attachment 2, Past Performance References, for up to three relevant contracts for the Offeror, and up to two relevant contracts for each major subcontractor. For purposes of this solicitation, a major subcontractor is defined as a subcontractor proposed to perform more than 30% of the per-unit cost for this requirement. The contracts identified must have been underway for at least six months or longer; been performed by the same CAGE Code or provide an explanation why the different CAGE Code is relevant past performance; and if completed, must have been completed within the past three years. If the Offeror does not have any Federal Government contracts, it may list State, local, commercial contracts, or performance on a subcontractor basis, in that order, to complete its Past Performance References. Offeror shall include an accessible point of contact, including name, telephone number, and email address for each reference provided. Failure to submit the Past Performance References may be considered certification that the contractor has no past performance for similar items for the Government to evaluate.
iv) If the Offeror has not performed similar projects, it is requested to discuss other related projects that demonstrate its capability to perform work of similar size, scope, and complexity.
v) The Offeror is requested to include in its submittal the written consent from its proposed major subcontractors to allow the Government to discuss the subcontractor's past performance assessment(s) with the Offeror.
vi) Include in the Past Performance Reference Sheet
(1) Contract number and Title
(2) Name of Contracting Agency
(3) Name, phone number, and email of Contracting Official Point of Contact.
(4) Type of Contract (e.g. Indefinite Delivery/Indefinite Quantity (IDIQ), Blanket Purchase Agreement (BPA), Cost Reimbursable or Firm Fixed Price, Incentive Fee, etc).
(5) Whether the Offeror was Prime Contractor or Subcontractor
(6) Award Date
(7) Contract Value
(8) Short Description of requirement
(9) Short description of why referral is relevant to the requirement Offeror is proposing.
(10) If Offeror was prime contractor, description of major subcontracts.
c) Factor 3, Price
i) Unless otherwise stated, the requirements of this factor apply equally to the Offeror and all proposed subcontractors, regardless of subcontract type. Factor 3 has no page limit.
ii) The Offeror's price proposal shall include:
(1) Prices for all priced line items and quantities included in the solicitation SECTION B of the SF33. Failure to submit a price for any priced item may result in the offer being rejected as non-compliant. Prices shall be submitted using Section B of the SF33. The prices proposed in Section B of the SF33 are contractually binding. All assumptions, exceptions, or explanations regarding the price proposal must be delineated in the Price Narrative submittal (if applicable).
(2) "Not Separately Priced (NSP)" CLINS are not priced. Any costs associated with the management of NSP CLINS are pro-rated to the priced CLINs.
iii) Spreadsheets (if provided) shall allow access to all formulas.
d) Factor 4, Contract Documentation
i) Cover Letter
(1) Two-page limit.
(2) Shall not contain any pricing information.
(3) The cover letter is an instrument for transmitting the proposal only; it will not be evaluated.
(4) Cover letter must contain:
(5) Solicitation number.
(6) Offeror's name, address, SAM Unique Entity Identifier (UEI) number, and Company Commercial and Government Entity (CAGE) Code.
(7) Name, title, phone number, and email address of person(s) authorized to negotiate and sign on the Offeror's behalf regarding this solicitation.
(8) Statement acknowledging unconditional acceptance of all terms and conditions contained in the solicitation, or clearly identify which factors, if any, include exceptions.
ii) SF33 (and if applicable SF30 Amendments)
(1) Offeror shall complete Page 1, Blocks 12 through 18. Block 12 must identify a to allow minimum of 365 days sufficient time to evaluate proposals.
(2) Complete Section B of the SF33 with pricing information
(3) Offeror shall complete all fill in fields contained in Sections C through M of the SF33 including any fill in fields in the provisions and clauses.
(4) If Offeror is proposing different delivery terms, please indicate on section F and provide an explanation in the cover letter.
(5) Section K, Representations, Certifications and Other Statements of Offerors of the SF33. The Offeror is responsible for confirming that its information in SAM.gov includes all requirements contained in Section K of this solicitation. Section K requirements identified herein that are not contained in the Offeror's SAM.gov records shall be provided with the Offeror's proposal.
(6) Offer shall return all pages of the RFP.
(7) If SF30 Amendments are issued, all amendments but be returned in full and boxes 15A, 15B, and 15C must be filled in.
(8) If SF30 Amendments are issued and there are fill in fields, Offeror shall complete all fill in fields.
iii) Small Business Subcontractor Plan
(1) Required for "other-than-small" business offerors only. In accordance with FAR 19.702, any offeror that is a large business must submit a Small Business Subcontracting Plan to be eligible for award. This plan is not required if the offeror is certified as a Small Business for the primary NAICS code of this solicitation.
(2) The subcontracting plan must be structured strictly around the statutory elements and requirements of FAR 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan - DoD Agreement).
(3) Offerors must outline specific, realistic percentage and dollar goals for subcontracting with the following socio-economic categories: Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone), and Service-Disabled Veteran-Owned Small Business (SDVOSB).
(4) Subcontracting goals must be defined by individual Period of Performance (PoP) including the base period and each option period, and must also be presented as a cumulative total representing the entire lifecycle of the contract.
(5) The Subcontracting Plan must fully align with, and mirror, the commitments made in the technical/management volume. Total planned subcontracting dollars, specific small business partners, and socio-economic classifications must match identically across all submitted volumes.
(End)
Section M - Evaluation Factors for Award
M-215-H004 BASIS OF AWARD (NAVSEA) (DEC 2018)
ALL UNITS OF ALL ITEMS WILL BE AWARDED TO ONE OFFEROR. OFFERS, THEREFORE, MUST BE ON THE BASIS OF FURNISHING ALL UNITS OF ALL ITEMS TO THE SPECIFICATION(S) DETAILED IN THIS SOLICITATION
PROPOSAL EVALUATION CRITERIA
GENERAL INFORMATION
A. Lowest Price Technically Acceptable (LPTA) source selection procedures will be used for the evaluation of proposals received in response to this solicitation.
B. The Government may award to other than the Offeror with the lowest total price if the lowest price Offeror is found to be "Non-Compliant" to any part of Section L.1.2 Content or "Unacceptable" in any of the non-price factors of Section L.1.3 Submission Factors.
C. If it is determined that a proposal exceeds a Factor's page limit identified in Section L, pages in excess of the specified page limit will be removed from the end of the submittal and will not be evaluated.
D. The Government intends to make award based on initial proposals without discussions but reserves the right conduct to discussions if determined necessary (see FAR 52.215-1). Accordingly, Offeror is advised to submit its most favorable terms and conditions in its initial proposal. If unexplained discrepancies are identified, the proposal may not be considered for award.
E. It is the Offeror's responsibility to provide clear indications of how its proposal meets the requirements of the Statement of Work in Section C. If the proposal is not clear, it may be an indication that the Offeror does not understand the requirements.
F. Proposals may be evaluated without consideration of any proposed subcontractor that is deemed to have an organizational conflict of interest.
1. EVALUATION FACTORS FOR AWARD
The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. Proposals are evaluated for acceptability, but not ranked, using the non-price factors. The Offeror must be determined to have an "Acceptable" rating for all non-price factors before further consideration will be given.
The LPTA non-price factors include Technical and Past Performance. The Contracting Officer will select the proposal, in conformance with the solicitation, which is determined "acceptable" for Technical and Past Performance and offers the lowest evaluated price.
A proposal that is rated "Unacceptable" for any non-price factor is excluded. Therefore, if any non-price factor is rated "Unacceptable", the Government reserves the right to not evaluate the remaining factors.
A. EVALUATION CRITERIA
The Government will evaluate each Offeror's technical capability to perform the requirements in the solicitation and any subsequent amendments. The proposal will be evaluated for completeness, accuracy, quality of detail, and degree of demonstration for the following:
1. Factor l, Technical
a. Subfactor 1: Technical Capability:
The quality of detail and the degree to which the proposal demonstrates the Offeror's technical capability, approach and unique skills or solutions to manufacturing the DMISA Rings from the drawings.
b. RESERVED
RESERVED
c. Subfactor 3: Technical Risk Management
The quality of detail and the degree to which the Offeror has demonstrated its risk mitigation process, assessment of the risk areas specific to the requirements in this solicitation, and a plan for risk mitigation based on the drawings provided.
Technical acceptability will be assessed according to Table M- 1.
Table M-1: Technical Acceptable/Unacceptable Evaluation Ratings
Rating Description
Acceptable Proposal meets the minimum requirements of the solicitation.
Unacceptable Proposal does meet the minimum requirements of the not solicitation.
The Offeror's technical proposal must be rated "Acceptable" to be further considered.
2. Factor 2, Past Performance
a. Past performance will be evaluated based on the Offeror's demonstrated ability to satisfy its customers, deliver products and services of high quality, meet delivery schedules, and comply with applicable Federal, State, and local laws and regulations.
b. The Government may contact some or all of the Offeror's references to ask questions such as: (1) was the Offeror is capable, efficient, and effective; (2) did the Offeror's performance conformed to the terms and conditions of its contract; (3) was the Offeror was reasonable and cooperative during performance; (4) was the Offeror was committed to customer satisfaction; (5) did the Offeror meet proposed subcontracting goals, if applicable; and (6) did the Offeror hire and retain qualified personnel necessary for successful completion of the contract requirements.
c. The Government will evaluate up to three references for the Prime and up to two references for each proposed major subcontractor. References exceeding the quantity requested shall be removed from the end of the volume and will not be evaluated.
d. The Government may consider information obtained from sources other than those identified by the Offeror, including Federal, State and local Government agencies, better business bureaus, published media and any other sources available to the Government, to include, but not limited to, Contractor Performance Assessment Reporting System (CPARS), Supplier Performance Risk System (SPRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), Federal Subaward Reporting System (FSRS), or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.
e. The Government will consider recent and relevant past performance information (within the last 3 years) obtained in relation to the scope of this requirement. It is the Offeror's responsibility to relate its past performance to the requirements of this solicitation. Past performance, either positive or negative, which is considered by the Government to be more closely related to the scope of this effort will be given higher consideration in determining the Offeror's past performance acceptability/unacceptability.
f. The Government will consider the Offeror's past performance in complying with requirements of the clauses at FAR 52.219-8, Utilization of Small Business Concerns, and 52.219-9, Small Business Subcontracting Plan.
g. Relevancy, as it pertains to past performance information, is a measure of the extent of similarity between the product, complexity, dollar value, contract type, and subcontract/teaming, or other comparable attributes of past performance examples and the solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
h. If the Offeror does not provide past performance information with its proposal, the Contracting Officer need not pursue further information if it is clear that the Offeror's price is not competitive.
NOTE: In the case of an Offeror without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (or "neutral") past performance. In the context of acceptability /unacceptability, a neutral shall be considered "acceptable."
Past Performance acceptability will be assessed according to Table M- 2.
Table M-2: Past Performance Evaluation Ratings
Rat ing
Description
Acc epta ble
Based on the Offerors performance record, the Government has a expectation that the Offeror will reasonable successfully perform the required effort, or the Offeror's performance record is unknown. (See NOTE above.)
Una cce pta ble
Based on the Offerors performance record, the Government does not have a reasonable expectation that the Offeror will be able to perform successfully the required effort.
The Offeror's past performance must be rated "Acceptable" to be further considered.
3. Factor 3, Price
The Offeror shall submit all pricing using . The prices proposed in , are SECTION B of the SF33 Section B of the SF33 contractually binding.
The Government will evaluate the Offeror's proposal based on the overall price for all items (including base and options) utilizing the following criteria:
a. Completeness . An Offeror's price proposal may be deemed non-responsive if, in the judgment of the Government, the price proposal is incomplete, erred, or does not accurately reflect the Offeror's proposed effort in meeting the technical requirements, thereby indicating that the Offeror does not understand the scope of the technical requirements.
Any inconsistency, whether real or apparent, between promised performance and price shall be explained in the price narrative. Failure to submit a price on an item may result in the proposal being deemed non-responsive.
b. Reasonableness . The Government anticipates making a determination of fair and reasonable pricing based on adequate competition. However, the Government may use any of the analysis techniques in FAR 15.404-1, either individually or in combination with each other, to determine that the final price is fair and reasonable.
The Government may reject an offer as nonresponsive if the CLIN/SLIN Unit prices are materially unbalanced between line items or subline items. An offer is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the offer will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
4. Factor 4, Contract Documentation
The Government will evaluate the submitted contract documentation to ensure that all the required information has been provided and to verify compliance with all requirements. The Government will assign an adjectival rating of "pass" or "fail" indicating whether the requirements have been fully satisfied. If the Offeror has failed to meet any of the pass/fail requirements, the proposal is ineligible for award and will be eliminated from further consideration. The Government may waive minor oversights and irregularities in the submitted contract documentation provided that they are considered immaterial in its judgment. The Government reserves the right to not evaluate other proposal volumes I-III (Factors 1-3) if Offeror is assigned a "fail" adjectival rating under Factor 4.
(End of provision)
| IDCode: J |
| Page: 1 |
| Pages: 22 |
| AmendNo: 0001 |
| EffDate: 19 Oct 2026 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .