Amendent 0002 Q and A.pdf
PDF 88 KB Posted
- Solicitation number
- N0025326Q0007
About this file
This document is a Pre-Proposal Inquiries (PPI) Q&A for an Avian Waste Abatement project at Building 1055, Amendment 0002. It addresses contractor questions regarding the scope of work, facility logistics, and site conditions.
Scope clarifications indicate that fluorescent light bulbs are to be cleaned only, with the government handling replacements. Floor cleaning includes removal of bird waste but excludes scuff marks and grease. The contractor must clean interior wall areas (4,260.03 SF), exterior wall areas (4,491.97 SF), and ceiling areas (1,254.17 SF), with no attic space present. The estimated depth and severity of guano contamination cannot be quantified, and no existing inspection or assessment reports are available. Working hours are normally 0600–1530 Monday–Friday, though the unlocked building allows flexible scheduling. Contractor parking is designated between Buildings 84 and 1055, with the TPOC providing guidance if additional parking is needed. The government will remove forklifts prior to work commencement. Bathroom facilities are available at Building 84's south end (0600–1530) or via subway as backup. This Q&A provides prospective bidders with essential information to prepare accurate proposals for the avian waste abatement contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Inquires (PPI’s) Avian Waste Abatement Building 1055 Amendment 0002
Q: Are fluorescent light bulbs to be cleaned or replaced?
A: The fluorescent light bulbs are to be cleaned – any bulbs that need replacement will be taken care of by the government.
Q: Are scuff marks and grease / oil to be cleaned in addition to the bird debris / waste?
A: Floor cleaning includes cleaning bird waste but not scuff marks or grease.
Q: What are the working hours?
A: Normal working hours are 0600 – 1530, however, 1055 is not a locked building so working hours are flexible.
Q: Bathroom accessibility?
A: Building 84 has a bathroom on the south end of the building. The building is unlocked 0600
– 1530 Monday – Friday. Subway can be used as a backup.
Q: Please confirm the government will move out and store forklifts elsewhere while work is in progress.
A: The government will remove the forklifts.
Q: Where is the contractor to park?
A: The contractor is to park in between buildings 84 and 1055. If additional parking is required, the TPOC will provide further guidance.
Q: What is the estimated attic square footage or building?
A: Grand Total Areas:
4,260.03 SF Walls
1,254.17 SF Ceiling
5,514.19 SF Walls and Ceiling
1,254.17 SF Floor
139.35 SY Flooring
142.17 LF Floor Perimeter
154.17 LF Ceil. Perimeter
1,254.17 Floor Area
1,306.00 Total Area
4,260.03 Interior Wall Area
4,491.97 Exterior Wall Area
156.83 Exterior Perimeter of Walls
Q: How many attic sections are there?
A: There is no attic space.
Q: Could you provide any existing inspection / assessment reports?
A: None currently exist.
Q: What is the estimated depth and/or severity of guano contamination?
A: The estimated depth and severity of guano contamination is unable to be quantified.