N0025325Q7012.pdf
PDF 772 KB Posted
- Attached to
- Mk62 Leak Test Stand Controller
- Solicitation number
- N0025325Q7012
About this file
This is a Request for Quotation (RFQ) from the Naval Undersea Warfare Center (NUWC) for MK 62 Leak Test Stand Controllers. The solicitation is for 3 initial production units, with two additional option quantities of 2 units each, to be manufactured in accordance with NAVSEA Drawing 8290555 Rev. D. The contract will be a firm fixed-price supply contract, with a Lowest Price Technically Acceptable (LPTA) source selection procedure. The total quantity of units could reach 7 if both option quantities are exercised.
Key details include a delivery schedule of 6 months from the contract award date (estimated as 31 August 2025), with inspection and acceptance to occur at the NUWC Division in Keyport, Washington. The solicitation requires contractors to maintain a Quality Management System compliant with ISO 9001:2015 and includes provisions for Foreign Military Sales. The contract contains security requirements involving Covered Defense Information and requires contractors to have a minimum NIST SP 800-171 assessment level of BASIC. Offers will be evaluated on price and past performance, with quality and delivery sub-factors being equally important.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025325Q7012-0007.pdf | ||
| N0025325Q7012-0006.pdf | ||
| N0025325Q7012-0005.pdf | ||
| N0025325Q7012-0004.pdf | ||
| N0025325Q7012-0003.pdf | ||
| Att.1_Baseline Mk62 Ver2_25Q7012.pdf | ||
| N0025325Q7012-0002.pdf | ||
| N0025325Q7012-00001.pdf | ||
| CDRL A001_25Q7012.pdf | ||
| Att.1_Baseline Mk62_25Q7012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
1 53
N0025325Q7012 8/11/2025 DO-C9
NAVAL UNDERSEA WARFARE CENTER
JESSICA REICHARD 360-315-3496
610 DOWELL STREET
KEYPORT WA 98345-7610
8/25/2025
SEE SCHEDULE
N0025325Q7012
Section A - Solicitation/Contract Form
MK 62 MOD 1 Leak Test Stand Controller
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
MK62 Leak Test Stand Controller, IAW NAVSEA Drawing 8290555 Rev. D and all associated drawings and specifications.
Print or Drawing: 8290555 Rev. D Pricing Arrangement: Firm Fixed Price
3 Each
Contract Data Requirements List ***Not Separately Priced***
Exhibit A, Contract Data Requirements List (CDRL) Technical Data shall be provided for all CLINs in accordance with (IAW) DD1423.1. A001
Exhibit Identifier: A001 Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Production Units, Option Quantity 1 MK62 Leak Test Stand Controller, IAW NAVSEA Drawing 8290555 Rev. D and all associated drawings and specifications.
Print or Drawing: 8290555 Rev. D Pricing Arrangement: Firm Fixed Price
2 Each
Option Line Item
Production Units, Option Quantity 2 MK62 Leak Test Stand Controller, IAW NAVSEA Drawing 8290555 Rev. D and all associated drawings and specifications.
Print or Drawing: 8290555 Rev. D Pricing Arrangement: Firm Fixed Price
2 Each
Section C - Description/Specifications/Statement of Work
STATEMENT OF WORK
MK 62 LEAK TEST STAND CONTROLLER
Prepared by
NAVAL UNDERSEA WARFACE CENTER DIVISION, KEYPORT (NUWCDIVKPT)
1. Scope
1.1. This Statement of Work (SOW) defines the requirements for manufacture of the MK62 Leak Test Stand Controller, NAVSEA Drawing 8290555 Rev. D, in support of Foreign Military Sales customers. It includes the established specifications and minimum requirements for materials and services needed to manufacture, test, and deliver the end item to support the System. This requirement supports Foreign Military Sales: Contract Line Item Numbers (CLINs) may be subdivided into priced Sub-line Item Numbers (SLINs) at award or option exercise for funding purposes only. Item quantities will not change. FMS countries will be clearly identified at the CLIN or SLIN level, as required, and FMS case numbers will be provided.
2. Applicable Documents
2.1. See Attachment 1, Contract Baseline, for a list of design specifications, performance specifications, assembly drawings, and part drawings applicable to this contract. The Contract Baseline technical drawings are relevant to manufacturing, quality, production, and testing for the end item deliverables of this contract. The Contractor shall adhere to all specifications, standards, and references noted in each document and in this SOW. Note regarding drawings: Cancelled/superseded specs found: ASTM B209 Superseded By: ASTM B209/B209M FED-STD-595 Superseded By: SAE AMS-STD-595/FANDECK IEC 60320 Superseded By: IEC 60320-1 SAE AMS-DTL-23053/5 Cancelled w/o replacement (SAE AMS-DTL-23053 S/S by SAE AS23053).
3. Requirements
3.1. Production Units
3.1.1. The Contractor shall manufacture, test, and provide production units, in accordance with NAVSEA drawing 8290555 Rev. D, that meet all requirements defined in the contract, all performance specifications, test requirement documents, build-to-print drawings, as outlined in Contract J-1 Baseline Document.
3.2. Production Unit Testing.
3.2.1. The Contractor shall perform all testing for production quality and verification in accordance with NAVSEA drawing 8290555 Rev. D.
The Contractor shall perform all testing required to satisfy all test and performance requirements of this contract.
3.2.2. At the successful completion of Production Unit testing, the Contractor shall generate, document, analyze and provide Production Units Test/Inspection Report. (CDRL A001).
3.2.3. The production units may undergo conformance testing during the government acceptance period.
3.3. Inspection and Acceptance
3.3.1. Inspection and Acceptance shall be at Destination.
3.3.2. Government will have up to 45 days for IU - End User inspection.
3.4. Government Furnished Property
3.4.1. Government will NOT provide vendor with Government Furnished Property.
4. Delivery Schedule
4.1. Early and partial delivery are acceptable, at no additional cost to the Government.
4.2. Contractor shall notify Technical POC with tracking numbers of each shipment.
5. Security Requirements
5.1. The requirements of this contract contain Covered Defense Information (CDI). Per DFARS 253.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements, the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 applies to this procurement. The Offeror shall have a current (not more than three (3) years old), minimum Confidence Level assessment of BASIC.
5.2. The requirements of this contract contain export-controlled Controlled Unclassified Information (CUI). To access and view the drawings, technical requirements, and critical item specifications the Vendor shall be registered in the Defense Logistics Agency (DLA) Joint Certification Program (JCP). Vendor shall submit a copy of the approved DD Form 2345 via email to the Contract Specialist/Purchasing Agent listed as the point of contact. Instructions for filing a DD Form 2345 can be found at the following web address, https://www.dla.mil/HQ
. The contractor shall maintain a current Certification of eligibility from DLA, Joint /LogisticsOperations/JCP/SpecificDD2345Instructions.aspx Certification Office for access to export-controlled Controlled Unclassified Information (CUI).
Requirements MK 62 Leak Test Stand Controller
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(Endof Text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
(End of Text)
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
(End of Text)
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018) (Dec 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
(End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018) (Oct 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
(End of Text)
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018) (Oct 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal dated in response to NAVSEA Solicitation No.
N0025325Q7012 .
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
(End of Text)
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001 , attached hereto.
(End of Text)
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC
(NAVSEA) (OCT 2018)
(Oct 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;
and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal
(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
(End of Text)
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018) (Oct 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
(End of Text)
C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2024) (Apr 2024)
(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.
(b) - General Requirement
(1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation. The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract. If required, the Contractor's Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow noncompliance.
Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639E approved 11 February 2020, EIA-649-1A dated 10 August 2020, and MIL-HDBK-61B dated 7 April 2020 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed rewrite, to facilitate baseline documentation changes.
(d) - An NECP shall be submitted whenever necessary to Non-Engineering Change Proposals (NECPs) document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.
The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of noncompliance and the effect on ship equipment or system operation.
(f) - For its effort expended in preparing ECPs, Equitable Adjustments for Change Documentation Preparations NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.2331).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.2481) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.
(End of text)
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
(End of Text)
Section D - Packaging and Marking
Additional Regulation or Supplemental Clauses Incorporated by Full Text
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022) (Feb 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
(End of Text)
D-211-H004 IDENTIFICATION MARKING OF PARTS -- BASIC (NAVSEA) (OCT 2018) (Oct 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 - Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
(End of Text)
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018) (Oct 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) sponsor: TBD AT TIME OF AWARD
(Name of Individual Sponsor)
TBD AT TIME OF AWARD
(Name of Requiring Activity)
TBD AT TIME OF AWARD
(City and State)
D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022) (Feb 2022)
(a) . Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May 2018, Marking Standard Practice for Commercial Packing.
(b) . A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, Packing List(s) shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) . In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one Master Packing List shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) . All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit packPart Identification
(s) or shipping container by part number and/or national stock number.
(End of Text)
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)
The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.
(End of Text)
D-247-H001 ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (OCT
2018)
(Oct 2018)
(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:
NAVY FMS CASE _____TBD____________________________________________________
REQUISITION NO. ____TBD____________________________________________________
ITEM DESCRIPTION ____TBD_____________________________________________________
If a consolidated shipment of several items in one container is forwarded, add to the above information "CONSOLIDATED SHIPMENT, CONTAINS ____ ITEMS".
(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.
(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-1 Contractor Inspection Requirements. Apr 1984 52.246-15 Certificate of Conformance. Apr 1984
FAR Clauses Incorporated by Full Text
52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)
Higher-Level Contract Quality Requirement (Dec 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001, 2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:
2015 "Quality Management Systems - Requirements" and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
(End of Text)
E-246-W003 INSPECTION STANDARDS (NAVSEA) (OCT 2018) (Oct 2018)
Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4-2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.
(End of Text)
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019) (Jan 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
(End of Text)
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018) (Oct 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
(End of Text)
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: There are no instructions required for this line item
DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE CENTER
DIVISION KEYPORT NWCF, 610 DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
Inspection and Acceptance Location
Both Destination Instructions: There are no instructions required for this line item
DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE CENTER
DIVISION KEYPORT NWCF, 610 DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: There are no instructions required for this line item
DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE CENTER
DIVISION KEYPORT NWCF, 610 DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: There are no instructions required for this line item
DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE CENTER
DIVISION KEYPORT NWCF, 610 DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
Section F - Deliveries or Performance
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery Schedule From date of lead time event to delivery 6 Month Date of Award
3 Each Ship To DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE
CENTER
DIVISION KEYPORT NWCF, 610
DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
FoB Details Contractor Destination
Delivery Schedule From date of lead time event to delivery 6 Month Date of Award
1 Lot Ship To DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE
CENTER
DIVISION KEYPORT NWCF, 610
DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
FoB Details Contractor Destination
Option Line Item
Delivery Schedule From date of lead time event to delivery 6 Month Date of Award
2 Each Ship To DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE
CENTER
DIVISION KEYPORT NWCF, 610
DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
FoB Details Contractor Destination
Option Line Item
Delivery Schedule From date of lead time event to delivery 6 Month Date of Award
2 Each Ship To DoDAAC: N00253 CountryCode: USA
NAVAL UNDERSEA WARFARE
CENTER
DIVISION KEYPORT NWCF, 610
DOWELL STREET
KEYPORT, WA 98345-7610
UNITED STATES
NUWC Receiving Officer, Receiving Telephone: 360-396-2760
FoB Details Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.211-17 Delivery of Excess Quantities. Sep 1989 52.247-34 F.o.b. Destination. Jan 1991
Additional Regulation or Supplemental Clauses Incorporated by Full Text
F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018) (Oct 2018)
In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.
(End of Text)
F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018) (Oct 2018)
All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7002 Payment for Contract Line or Subline Items Not Separately Priced. Apr 2020 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Document Type: Invoice and Receiving Report (Combo) Inspection location: DESTINATION Acceptance location: DESTINATION
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Document Type: Invoice and Receiving Report (Combo) Inspection location: DESTINATION Acceptance location: DESTINATION
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62839
Issue By DoDAAC N00253
Admin DoDAAC N00253
Inspect By DoDAAC N00253
Ship To Code N00253
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
Send additional email notifications to: Receiptcontrol.nuwckpt.fct@navy.mil
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
For WAWF Invoicing questions, contact:
Keyport Vendor Pay Group: (360) 315-8500 or vendorpay.nuwckpt.fct@navy.mil
(2) Contact the WAWF helpdesk at , if assistance is needed. 866-618-5988
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
G-232-H002 H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024) (Feb 2024)
Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap /dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).
(End of text)
G-232-W001 PROMPT PAYMENT (FAR 52.232-25) REVISED Constructive Acceptance PERIOD
(NAVSEA) (OCT 2018)
(Oct 2018)
In accordance with FAR 32.904(b)(1)(ii)(B)(4), the Contracting Officer has determined that more than seven days are needed for constructive acceptance. Contractors are hereby advised that the constructive acceptance period established in paragraph (a) (5) (i) of FAR clause 52.232-25, Prompt Payment is revised to 45 days in lieu of 7 working days.
(End of Text)
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
2019)
(Jan 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction
(TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of Text)
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.
S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.
(e)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .