Materials Equipment In-Place List Rev. 1.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Replacing Coiling Rollup Door and Security Grille Federal contract opportunity
- Solicitation number
- N0025323Q0070
About this file
This document is a materials equipment in-place list for Contract No. N0025323Q0070 to replace a coiling rollup door and security grille at Building 15. It provides a template for contractors to list all equipment and materials installed on the project, including an asset number, description, building and room number, quantity, unit of measure, replacement cost, supplier details, manufacturer information, installation and warranty dates. Contractors must include these details in a separate line item for each asset with a unit of measure of "EACH" and provide the cost of removing old assets and installing new ones. The template also notes the federal agency, the Department of the Navy Naval Sea Systems Command, and the project name to replace the coiling rollup door and security grille.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00253-23-Q-0070-U0003.pdf | ||
| N0025323Q0070U0002.pdf | ||
| N00253-23-Q-0070-U0001.pdf | ||
| Past Performance References.docx | DOCX document | |
| Drawing - Bldg. 15 Replace Coiling Rollup door and Security grille.pdf | ||
| Joint Venture Proposed Distribution of Work Form.docx | DOCX document | |
| Safety_Data_Sheet.docx | DOCX document | |
| PPI_Form.docx | DOCX document | |
| OSHA-RK-Forms-Package.pdf | ||
| Wage Determination - Building Kitsap.pdf | ||
| Attachment _____ Past Performance References.docx | DOCX document | |
| Safety Requirements for Contractors and Subcontractors (30 AUG 2021).pdf | ||
| Contractors Guide to Env Compliance 2019 Rev1.docx | DOCX document | |
| bid form.pdf | ||
| NAVSEA Guide to Environmental Compliance Requirements.pdf | ||
| bid form.docx | DOCX document | |
| N00253-23-Q-0070.pdf | ||
| OPSEC Guide for Defense Contractors_2016.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | Bldg. 15 Replace Coiling Rollup door and Security grille | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .