N00253-18-R-0002 Amendment 0004

View the file

Other files

File Type Posted
Attachment_12_NAVSEA_Pre-Award_Accounting_System_Adequacy_Checklist.docx DOCX document
Attachment_10_Cost_Summary_(Amendment_0004).xls XLS spreadsheet
Attachment_10_Cost_Summary_(Amendment_0003).xls XLS spreadsheet
N00253-18-R-0002_Amendment_0003.pdf PDF
Attachment_10_Cost_Summary_(Amendment_0002).xls XLS spreadsheet
N00253-18-R-0002_Amendment_0002.pdf PDF
N00253-18-R-0002_Amendment_0001.pdf PDF
Attachment_4_Labor_Hour_Breakdown_(Amendment_0001).xls XLS spreadsheet
Attachment_3_Clause_Applicability_Matrix_(Amendment_0001).pdf PDF
Attachment_10_Cost_Summary_(Amendment_0001).xls XLS spreadsheet
Attachment_8_Past_Performance_Questionnaire.docx DOCX document
Attachment_11_BYG-1_TI-APB_USN_Build_Schedule.pptx PPTX presentation
Attachment_5_Government_Furnished_Information_(NAVSEA_Form_4340-2).pdf PDF
Attachment_7_Standard_Labor_Category_Descriptions.pdf PDF
N00253-18-R-0002_RFP.pdf PDF
Attachment_1_SOW.pdf PDF
Exhibit_B_CDRL_B001.pdf PDF
Attachment_9_Small_Business_Participation_Commitment_Document.docx DOCX document
Q&A_Regarding_Draft_RFP.pdf PDF
Attachment_10_Cost_Summary.xls XLS spreadsheet
Attachment_3_Clause_Applicability_Matrix.pdf PDF
Exhibit_C_CDRL_C001.pdf PDF
Attachment_4_Labor_Hour_Breakdown.xls XLS spreadsheet
Attachment_2_DD254.pdf PDF
Attachment_6_Consolidated_GFP_Attachment_v1.0.pdf PDF
Exhibit_A_CDRL_A001_-_A036.pdf PDF
N00253-18-R-0002_RFP_DRAFT.pdf PDF
Attachment_3_Clause_Applicability_Matrix.pdf PDF
Attachment_6_Consolidated_GFP_Attachment_v1.0.pdf PDF
Attachment_2_DD254.pdf PDF
Attachment_5_Government_Furnished_Information_(NAVSEA_Form_4340-2).pdf PDF
Attachment_7_Standard_Labor_Category_Descriptions.pdf PDF
Attachment_11_BYG-1_TI-APB_USN_Build_Schedule.pdf PDF
Attachment_4_Labor_Hour_Breakdown.xls XLS spreadsheet
Exhibit_B_CDRL_B001.pdf PDF
Attachment_8_Past_Performance_Questionnaire.docx DOCX document
Attachment_9_Small_Business_Participation_Commitment_Document.docx DOCX document
Attachment_1_SOW-DRAFT.pdf PDF
Exhibit_C_CDRL_C001.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Subject: TIH 20/22

This amendment is issued to provide Government response to contractor-submitted question, and incorporate the resulting changes into the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

V 1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00253-18-R-0002

X 9B. DATED (SEE ITEM 11)

24-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2018

CODE

NAVAL UNDERSEA WARFARE CENTER

ATTN: JULIE THOMAS

JULIE.THOMAS@NAVY.MIL

610 DOWELL STREET, BLDG 206

KEYPORT WA 98345

N00253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00253-18-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0004 Q&A

Q1. Amendment 0002, A21 states, "Current COLUMBIA Level 1 Drawing has been uploaded into E-TIC at the following location: TIH Technical Data>Level 1 and Level 2 Drawings>Level 1>COLUMBIA." The BYG-1 combat system level drawing has been uploaded but not the corresponding Sonar drawing for COLUMBIA. Will the Government provide a Sonar Level 1 or an update to the "TIH SONAR Hardware_Rev.xlsx" document to include the TIH Sonar configuration information for COLUMBIA?

A1. Sonar/ARCI Level 1 drawing for COLUMBIA class submarines is not available. Therefore, Attachment 10 Worksheet 10G Shipset Stepladder Pricing Table is revised to delete the TI-20 ARCI NEWCON COLUMBIA to TI-20 variant. The TIH Sonar configuration information for COLUMBIA is not known at this time.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

HQ J-2-0002 STANDARD LANGUAGE FOR CONTRACTS

The following document(s), exhibit(s), and other attachment(s) form a part of this contract:

Document Description Date # Pages Exhibit A Contract Data Requirements List (A001 – A036) 20 DEC 2017 36 Exhibit B Contract Data Requirements List (B001) 2 JAN 2018 3 Exhibit C Contract Data Requirements List (C001) 20 DEC 2017 1 Attachment 1 TIH 20/22 Statement of Work (including Appendix A) 19 DEC 2017 50 Attachment 2 Contract Security Classification Specification - DD Form 254 18 DEC 2017 14 Attachment 3 Clause Applicability Matrix 31 JAN 2018 2 Attachment 4 Labor Hour Breakdown Amendment

Attachment 5 Government Furnished Information, NAVSEA Form 4340/2 Rev 6-90 1 Attachment 6 Consolidated Government Furnished Property Attachment Ver 1.0 Version 1.0 2 Attachment 7 Standard Labor Category Descriptions N/A 6 Attachment 8* Past Performance Questionnaire N/A 3 Attachment 9 Small Business Participation Commitment Document (SBPCD) N/A 3 Attachment 10 Cost Summary (Seven Worksheets: 10A through 10G) Amendment

Attachment 11* BYG-1 TI/APB USN Build Schedule Rev N 1 Attachment 12* NAVSEA Pre-Award Accounting System Adequacy Checklist N/A 12 *This attachment is for the proposal and evaluation phase only. It will not become part of the contract award.

(End of Text)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

INSTRUCTIONS TO OFFERORS

1.0 GENERAL

(a) The Government intends to award a contract that results from this solicitation to the responsible Offeror whose proposal is the most advantageous to the Government under the selection criteria set forth in Section M of the solicitation. The Government may reject any or all proposals if such action is in the Government’s interest.

Exchanges with Offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(b) The Offeror shall submit all information required by this RFP. Proposals that do not comply may be considered nonresponsive and may render the Offeror ineligible for award. The Offeror’s proposal shall be based on the requirements contained in this RFP (including those documents, exhibits, and other attachments to the RFP identified in Section J).

(c) The Government intends to evaluate proposals and award a contract upon initial proposals. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms in relation to the evaluation criteria. However, in accordance with the clause FAR 52.215-1, Instructions to Offerors - Competitive Acquisition, the Government may contact all or a limited number of Offerors with questions concerning their responses.

(d) Offerors are hereby notified that a competitive range of the most highly rated Offerors may be established for the purpose of efficiency.

(e) The solicitation will be announced on FEDBIZOPPS and will be made available only through the internet at https://www.fbo.gov.

(f) Offerors are hereby notified that the Government may post additional information to the FEDBIZOPPS web site relating to this solicitation (e.g. responses to questions, amendments, etc.). It is the Offeror’s responsibility to check the web site for any such information.

(g) It is the Offeror's responsibility to identify to the Contracting Officer at the earliest possible time, but prior to the closing date, any ambiguities, discrepancies, inconsistencies, or conflicts between the Statement of Work (SOW) and other solicitation documents attached hereto or incorporated by reference. All questions shall be submitted via email to KYPT_TeamSub_TIH@navy.mil. Only questions transmitted electronically will receive a response.

Offerors are requested to submit questions within twenty (20) days after release of the RFP in order to allow the Navy adequate time to prepare and issue responses to all Offerors prior to the date and time set for receipt of proposals. While questions may be submitted up to the time of solicitation closing, the Contracting Officer cannot guarantee those late-submitted questions will be thoroughly answered in advance of closing. It is the Government's intention that questions and responses will be provided via an amendment to the solicitation which will be posted at https://www.fbo.gov. Information provided with each question shall include the document name, document date, specific page, paragraph, clause or other definitive citation requiring clarification.

(h) Reference material will be provided by the Navy on an Electronic Technical Information Center (E-TIC). While the material will be unclassified technical information related to the Technical Insertion Hardware (TIH) effort, it may still be restricted by the Arms Export Control Act. In accordance with Department of Defense (DOD) Directive 5230.25, access to export-controlled technical data must be through the company's designated Joint Certification Program (JCP) Point of Contact (POC)/Data Custodian.

(i) To apply for access to the E-TIC for the TIH 20/22 Solicitation, the Offeror must have a valid PKI certificate and be able to supply its JCP number. The Offeror’s designated JCP Data Custodian must fill out an Advanced https://www.fbo.gov/

Interactive Management Technology Center (AIMTC) Account Request form at https://aimtc.nuwc.navy.mil/aimtcmanagement/request.asp. The following fields must be completed as shown:

'Branch' or 'Code' you support: NAVSEA PMS425 'Navy Sponsor POC': Michael Nagy 'Navy Sponsor Code': NUWCDIVKPT C432 'Justification for your need to know': Prospective Offeror for the Technical Insertion Hardware

Competition, JCP # ____________

Scroll down to the bottom of the page and expand "Electronic Technical Information Center (E-TIC)"; select "E-TIC for TIH 20/22 Solicitation N00253-17-R-0002" as the area for which you have a 'need to know'. When the AIMTC Account Request form is complete, click the send button at the bottom of the page. Upon system manager approval, the account will be set up and notification will be sent via email.

Only the JCP Data Custodian identified on the Offeror’s DD2345 form will be granted E-TIC access.

2.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS

(a) The Factors and Subfactors for this solicitation are as follows:

Factor 1: Technical Subfactor 1: Sample Tasks 1 and 2 Subfactor 2: Sample Task 3

Factor 2: Management

Subfactor 1: Personnel and Organization Subfactor 2: Management and Control Subfactor 3: Facilities

Factor 3: Past Performance

Factor 4: Small Business Participation

Factor 5: Cost / Price

(b) The solicitation response will be contained in five (5) separate volumes:

Volume I: Technical and Management Volume II: Past Performance Volume III: Small Business Participation Volume IV: Cost Proposal Volume V: Solicitation Documents

For each volume, the number of copies required and the page limit are shown in Table L-1. If a discrepancy exists between the original paper copy of the proposal and the electronic file, the paper copy will take precedence. All data submitted shall be unclassified.

Table L-1: Copies / Page Limitations

Volume Title Page Limit Original (Paper)

Add’l Paper Copies CD

I Factor 1: Technical (excludes BOE, BOM &

IMS)

150 1 7 3

I Bill of Materials (BOM) None 1 7 3 I Basis of Estimate (BOE) 100 1 7 3 https://aimtc.nuwc.navy.mil/aimtcmanagement/request.asp

I Integrated Master Schedule (IMS) None 1 7 3 I Factor 2: Management (excludes Resumes &

Teaming Arrangements) 50 1 7 3

I Resumes 3 pages /resume 1 7 3 I Teaming Arrangements None 1 7 3 II Factor 3: Past Performance None 1 4 2 III Factor 4: Small Business Participation None 1 3 2 IV Factor 5: Cost Proposal (excludes copies for

DCAA & DCMA, historical cost data files, Attachment 12)

None 1 5 2

IV Historical Cost Data files None 1 0 2 V Solicitation Documents per paragraph

2.2(a)(i) through (iii) None 1 1 1

2.1 PROPOSAL FORMAT AND DELIVERY

(a) The Offeror must comply with the detailed instructions for the format and content of the proposals. Proposals that do not comply may be considered nonresponsive and may render the Offeror ineligible for award. In order to maximize efficiency in the proposal evaluation process, the Offeror shall submit its proposal in accordance with the format presented below.

The cover page for each volume shall contain:

Volume Number and Title (e.g., Volume I – Technical & Management) Solicitation Number (N00253-18-R-0002) Company Name, Address, telephone number, and email address of the Offeror’s point of contact.

Offeror’s DUNS Number and CAGE Code Proposal Copy Number

Each volume shall include the following information, which is not included in the page limit:

Page No. Description i Cover Page ii Table Of Contents (TOC) iii List Of Figures iv List Of Tables v List Of Appendices vi Glossary Of Abbreviations And Acronyms

The Offeror shall submit each volume in both paper format and as electronic files. Instructions for paper and electronic files are in Sections 2.1.1 and 2.1.2, respectively.

(b) Duplicated information within a given factor may be included in full once and by reference thereafter, as long as there is a clear reference to the duplicated information. If the duplicated information is for different evaluation factors, it must be included in full text under each factor.

2.1.1 Paper Format

(a) Each volume shall not exceed the page limitation cited in Table L-1. Each volume shall be bound separately in a three ring binder to permit removal of sections, with each major part tabbed. The Offeror’s company name shall appear at the top of each page in the header section. Legibility, clarity, and compliance with the requirements of the solicitation are essential. Failure to provide the requested information may adversely affect the Government’s evaluation of the Offeror. The page count shall include all material with printed matter and figures unless otherwise stated herein.

(b) The material in each volume of the Offeror’s proposal shall be typed or printed with the type no smaller than size 12 Times New Roman or Courier New font on standard 8-1/2 by 11 inch paper. Text line spacing shall be at least

1.5 lines. One-inch margins on each side, including top and bottom are required. Text within tables, diagrams, pictorial charts, or graphic material may use Times New Roman or Courier New 8-point font. Fold out pages may be used for diagrams, charts or graphic material only and may not exceed 11 inches by 17 inches. Fold out pages will be counted as two pages. Unless otherwise specified, fold out pages may only include narrative sufficient to describe the diagram, chart or graphic material. Every major section, figure, and table shall be numbered. Proposal material shall be presented on double-sided pages only and in a single column on each page. Each double-sided page counts as 2 pages. Failure to comply with these requirements may result in reformatting by the Government for compliance purposes.

(c) A date corresponding to the date of the initial proposal shall be placed on each page of the proposal in the footer section. Any pages that may be revised as a result of discussions or correspondence (if required) shall contain revision numbers and dates.

(d) The page count shall include all material with printed matter and figures except (i) title pages, (ii) table of contents, (iii) lists of figures, (iv) list of tables, (v) list of appendices, and (vi) glossary of abbreviations and acronyms. Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC.

Every page, except those marked as blank, will be numbered. Pages exceeding the page count shall be removed from the end of the volume that exceeds the page count and will not be evaluated.

2.1.2 Electronic Files

(a) The electronic files shall be uncompressed and shall be submitted on Compact Disc (CD); text shall be prepared using Microsoft® Word ™ 2010 compatible applications; and spreadsheets, worksheets, or workbooks shall be prepared using Microsoft® Excel ™ 2010 compatible applications. All schedules, including the Integrated Master Schedule, shall be in Microsoft Office 2010 compatible applications. The electronic proposal material shall not contain any information not contained in the paper format.

Electronic files shall be labeled by: a) Contractor Name and b) Title of the document being attached (Example: ABC Inc. – Volume I Technical Proposal, ABC Inc. – Volume IV Cost Proposal, etc.). Refer to volume information for specific volumes and titles.

(b) Graphics, tables, photographs, and other data beyond the capability of Microsoft® Word™, Microsoft® PowerPoint™, Microsoft® Excel™, or Microsoft® Project™ may be submitted in searchable files compatible with Adobe Acrobat version 11.0. The information shall be submitted as one (1) volume per CD. Refer to Table L-1 for quantities. Each disk shall be labeled as follows:

Volume # Offeror Company Name, City, State Offeror POC Offeror POC Phone # Date of Submission Unclassified/FOUO

(c) Appropriate Security Classification markings and handling instructions shall be used for all proposals submitted.

Electronic files shall be unclassified.

(d) Complete sets of CDs shall be provided, one marked “MASTER” and the others marked “BACKUP.”

Submission of locked spreadsheets is not acceptable. The Offeror shall not embed sound or video files into the electronic files. The Offeror shall ensure CDs are virus free.

2.1.3 Proposal Submission

(a) All copies of all proposal volumes shall be submitted to the following address at or before the date and time in Block 9 of the Standard Form (SF) 33. All offers shall be marked as follows:

Naval Undersea Warfare Center (NUWC) Keyport ATTN: Julie Thomas, Building 206L, Room 104 610 Dowell Street Keyport, WA 98345

RFP #: N00253-18-R-0002

DO NOT OPEN IN MAIL ROOM

(b) Proposals shall not be submitted via fax or email.

(c) No cost or pricing information shall be included in the Offeror's forwarding letter or in any part of its submitted volumes, except for Volume III - Small Business Participation, Volume IV – Cost Proposal, and Volume V – Solicitation Documents. Forwarding letters are merely instruments for transmitting the submitted proposals; they are not part of the page count and will not be evaluated.

(d) Although legible, neat, orderly, and comprehensive proposal(s) are required, elaborate brochures or other presentations beyond that sufficient to present a complete and effective explanation are not desired. Elaborate artwork, expensive visual or other presentation aids are neither necessary nor desired.

(e) The proposal shall contain all of the pertinent information in sufficient detail to permit evaluation. The proposal shall be detailed and complete so as to clearly demonstrate that the Offeror has a comprehensive understanding of all requirements. If an Offeror fails to comply with content requirements, its proposal may be downgraded for failure to follow instructions.

(f) Offerors hand carrying proposals are requested to call Julie Thomas at (360) 315-3390 or Karen Smith at (360) 396-2594 at least 48 hours prior to arriving at the Naval Undersea Warfare Center in Keyport, Washington to make arrangements. Offerors should wait at the Keyport Pass and ID building to meet the contact. Packages should not be sealed, as they are subject to inspection.

(g) An additional CD of Volume IV – Cost Proposal of the Offeror’s proposal shall also be submitted in parallel to the Offeror’s cognizant Defense Contract Audit Agency (DCAA) office and its Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO). Subcontractor cost information may be contained within Volume IV - Cost Proposal, OR, Subcontractor data may be submitted prior to the date and time set forth in Block 9 of the SF 33 directly to the Government by following the directions above, clearly marked with Prime Contractor’s name. An additional set of Subcontractor’s data shall be submitted directly to its respective cognizant DCAA office.

2.2 PROPOSAL CONTENT

(a) The proposal shall include the following:

i. Standard Form 33, “Solicitation, Offer and Award,” with blocks 12 through 18 completed by the Offeror. Block 12 shall be filled in with a minimum of 400 days to allow for sufficient time to evaluate proposals.

ii. RFP: The Offeror must fill in all areas of the RFP identified as Offeror fill-ins and provide any other information or data required by the solicitation.

iii. RFP Section K, “Representations, Certifications and Other Statements of Offerors,” completed by the Offeror. Identify if the information is in System for Award Management (SAM) or provide if not already in SAM. Offeror is responsible for confirming that its information in SAM includes all requirements contained in Section K of this solicitation. Requirements not in SAM shall be provided with offeror’s proposal.

iv. Volumes I through V in accordance with the requirements identified herein. See Table L-1 for the number of copies to submit.

(b) Proposals shall demonstrate an understanding of the requirements and the proposed method of completing the Statement of Work. Technical and management information shall be prepared in such a manner as to enable source selection personnel to make a comprehensive and complete evaluation and arrive at a sound determination as to whether or not the solutions proposed and described will satisfy the Government’s requirements. To facilitate the evaluation, the proposal shall be sufficiently detailed and complete to clearly demonstrate that the Offeror has a comprehensive understanding of the requirements and the technical and management problems inherent therein, and has a valid, practical solution for each contemplated problem. It should also contain sufficient detail to indicate the proposed means for complying with all applicable specifications. Statements that the Offeror understands and can or will comply with all specifications, statements paraphrasing the specifications or parts thereof, and phrases such as “standard procedures will be employed” or “well known techniques will be used,” will be considered insufficient and potentially deficient.

(c) The proposal shall outline the requirements as interpreted by the Offeror, the technical and management approach to the requirement, any interpretations or deviations to the Statement of Work, and any other topics deemed pertinent. The Offeror shall comply with all solicitation requirements, terms, and conditions. Any exceptions shall be identified to the Government prior to receipt of the Offeror’s proposal. Failure to comply with all solicitation requirements may result in the Offeror being considered ineligible for award.

2.3 VOLUME I – TECHNICAL AND MANAGEMENT (FACTORS 1 AND 2)

(a) The required content of this volume is identified below. The volume shall be organized in the same order as the appropriate subparagraphs discussed below, with information specific to Sample Tasks or SOW references clearly identified. The Offeror may, however, expand on or include text in addition to the required contents, provided it is relevant and demonstrates a capability that is beneficial for performance of the resultant contract and does not exceed the page number limitation set forth in the technical volume.

(b) The Offeror shall provide its proposed technical approach and qualifications for accomplishing the Sample Tasks in compliance with the SOW. These Sample Tasks are for evaluation purposes; however, the Government reserves the right to issue one or more of these Sample Tasks, or any part thereof, under the resultant contract. The actual tasks issued under the resultant contract may vary from the Sample Tasks in terms of technical details, complexity, duration, delivery requirements, etc.

(c) For the purpose of proposal generation for Sample Tasks 1 through 3, the following assumptions are provided:

i. Equipment consists of the hardware, testing software, firmware, and/or cabinet infrastructure (including but not limited to power, cooling, cabling, etc.) within a given variant configuration.

Migrating from a previous Technology Insertion level to the TI-20 level could involve equipment modifications or changes at any level within the variant.

ii. Combat Control and Sonar Configuration Baselines are detailed in the TI-20/22 E-TIC > TIH Technical Data > Level 1 and Level 2 Drawings.

iii. Virtualization changes may affect available power, weight, cooling, equipment mounting or footprint as established on previous baselines.

(d) Technical data to support proposal preparation is contained on the TIH 20/22 E-TIC.

(e) For the purpose of these sample tasks, the critical milestones are:

i. Contract award July 2, 2019

ii. Contractor’s involvement in the design process begins upon award

iii. Refer to BYG-1 TI/APB USN Build Schedule, Attachment 11 for anticipated milestones

(f) Volume I, Factors 1 and 2 shall contain the following:

Factor 1: Technical

Subfactor 1: Sample Tasks 1 and 2 Subfactor 2: Sample Task 3

Factor 2: Management

Subfactor 1: Personnel and Organization Subfactor 2: Management and Control Subfactor 3: Facilities

No cost or price information shall be included in Volume I.

(g) The total hours for Sample Tasks 1 through 3 do not equal 100% of the hours anticipated under this contract.

However, they are meant to be substantially reflective of the labor mix of an Offeror’s workforce performing TIH 20/22. Offeror shall propose an efficient and realistic mix of labor categories. The Offeror shall propose the hours provided in Tables L-3 and L-4 for Sample Tasks 1 and 2, respectively. For sample task evaluation purposes, Offerors who do not propose the hours provided in Tables L-3 and L-4 will be evaluated as unacceptable.

FACTOR 1: TECHNICAL

The Offeror shall meet all SOW requirements specific to Sample Tasks (ST) 1 through 3 as stated in Table L-2, Sample Task Response Breakdown.

Table L-2: Sample Task Response Breakdown Sample Task Requirements

The Offeror shall:

ST

ST

ST

1. Provide its technical approach, required resources, and management strategy to design and develop the new TI-20 hardware baseline for BYG-1 and ARCI identifying the program’s critical path and associated risks and mitigation plans. The approach shall describe the differences between development of TI-14 to TI-20 and new construction baselines.

Description shall include how the approach relates to and interfaces with the technology insertion process and associated participants.

NA X NA

2. Define the approach to be employed to address virtualization. NA X NA

3. Describe test equipment and test approach, and discuss how these validate that the hardware meets the requirements of the performance specifications and/or drawings prior to delivery to the Government.

Describe any specialized test facilities required for environmental testing, and its approach to meet this requirement. Describe the objectives, limitations, thresholds, and goals for environmental testing. Identify areas of potential risk to achieving acceptable test results.

Approach shall include an explanation for use of Engineering Development Models (EDMs) and how the Offeror will manage the effects of change during the production process. Include information regarding how the approach incorporates innovative strategies for low risk design and testing, which will minimize cost and decrease risk of post-production changes.

NA X NA

4. For new construction, provide its technical approach to support Command and Control System Module (CCSM) Off-Hull Acceptance Test Site (COATS) activities for one VIRGINIA Class Submarine

NA X NA

located at the General Dynamics Electric Boat Corporation shipyard in Groton CT.

5. For modernization, provide its technical approach for the removal of one TI-14 Combat Control System (CCS) AN/BYG-1 and AN/BQQ-10 Sonar Set from a VIRGINIA Class Submarine located at the Huntington Ingalls Industries shipyard in Newport News VA. Of this CCS hardware, describe the approach to evaluate for reuse each of the Submarine Enhanced Common Display (SECD) Units 5001 - 5004 and 6001-6006.

Describe the approach to the refurbishment of each SECD Bullnose, Bullnose Plate Assembly, Lower Door, and Monitor Plate Assembly.

NA X NA

6. Provide its technical approach, required resources, and management strategy to manufacture the TI-20 and TI-22 shipsets for BYG-1 and

ARCI.

NA NA X

7. Provide a production throughput analysis demonstrating its ability to meet delivery requirements and identifying where production capacity may be limited. Provide a material and manufacturing process flow chart from material procurement through final delivery.

NA NA X

8. Provide a TI-20 (FY19/20) and TI-22 (FY20/21) BYG-1 and ARCI Bill of Material (BOM) for the top 80% material cost drivers per shipset variant identified in Attachment 10, Worksheet 10G (total 20 BOMs).

The BOM submitted with the technical proposal shall use Attachment 10, Worksheet 10C, Sample Task 3 BOM, excluding the unit price and extended price data.

The Offeror shall describe its material acquisition process. The Offeror shall identify the methods of vendor selection used to ensure consistent quality and product compliance at reasonable prices. The Offeror shall demonstrate how requirements will be communicated to vendors and how vendor quality and timeliness will be controlled and managed. The Offeror shall discuss how it plans to inspect and test subcontracted items, including identifying the party responsible for Quality Control.

NA NA X

9. Describe the processes to be used to manage the configuration identification of as-delivered items and the configuration status accounting for products as those products receive technology insertions.

NA NA X

10. Describe the detailed production process and approach to include:

a. scheduling and phasing plan, to include reporting of schedule risks, and schedule variance mitigation planning;

b. material planning, purchasing, and management;

c. make/buy decision approach;

d. facility planning, including process(es) and equipment;

e. manufacturing and assembly approach;

f. quality assurance with an emphasis on high first pass yield and achieving least probability of failures post-delivery; and

g. Post-delivery support.

NA NA X

11. Describe the processes and approach required to execute the work as identified in the sample tasks. Approach shall state how Offeror will identify efficiencies and minimize risk in a collaborative environment.

X X X

12. The Offeror shall provide a Basis of Estimate (BOE) for labor associated with each sample task reflecting level of effort and the basis for the estimates. The Offeror’s BOE shall be detailed enough for the Government to evaluate the Offeror’s knowledge of work requirements;

provide a breakdown of the proposed efforts correlated to the Contract Work Breakdown Structure (CWBS) and labor categories proposed for the resultant contract; and, include a complete description of the effort to

X X X be applied at the BOE/CWBS/Labor category level, and assumptions used in determining hours / labor categories. The BOE shall not contain any cost information. Labor categories proposed shall be consistent across Attachment 4, Labor Hour Breakdown, and Attachment 10, Worksheets 10A and 10B, such that a side-by-side review of the technical and cost proposals will yield consistent data. Any significant variations between the labor mix proposed in the cost volume as compared to the technical approach shall be explained by the Offeror, or the Government may construe that the approach offered in the technical proposal is inconsistent with the cost offered in the Cost Proposal, and may pose a substantial risk to the Government.

Provide a matrix that translates its unique labor categories and proposed labor skill mix to the standard labor category descriptions identified in Attachment 7. The Government may view Offerors that deviate substantively from the Government’s standardized labor categories as not fully understanding the scope of the effort involved.

The Offeror shall provide the estimated labor categories and hours needed to complete the proposed technical approach for Sample Tasks 1 through 3 using Attachment 4, Labor Hour Breakdown. The estimate shall be broken down by the labor categories proposed. Provide a mapping of all proposed labor hours by labor categories, broken out to correspond to its proposed CWBS, to provide a complete mapping of all efforts associated with the Sample Tasks.

13. Offeror shall provide an Integrated Master Schedule (IMS) that includes the following:

a. proposed design reviews, testing, deliveries of hardware, testing software, and documentation in accordance with SOW;

b. identification of the most critical schedule risk items, and critical and key events for each Sample Task;

c. identification of the “critical path” as determined by the Offeror;

d. identification of all assumptions and supporting information; and

e. identification of resources required to accomplish the technical approach proposed for the Sample Tasks.

Format shall be fold out page(s) schedule for the overall program plan showing the schedule for how each Sample Task will be accomplished.

X X X

14. Describe the approach to minimize duplication of efforts and to maximize “re-use” during development and design.

NA X NA

15. Provide a list of all Government Furnished Information (GFI), Property (GFP), and Material (GFM) deemed necessary to accomplish the requirements of the resultant contract. GFI must be requested using Attachment 5, Government Furnished Information (NAVSEA Form 4340/2). GFP/GFM must be requested using Attachment 6, Consolidated Government Furnished Property (Version 1.0). When, and if, approved, these listings will populate attachments in the resultant contract.

X X X

16. Describe the process and approach for test, evaluation, and qualification. NA X X

17. Provide restrictions on Technical Data (TD), Computer Software (CS), and Computer Software Documentation (CSD) for Sample Tasks. The Offeror shall provide a complete description, in accordance with DFARS 252.227-7017 and 252.227-7028, of all proposed restrictions on the Government’s ability to use, release, or disclose the TD, CS, or CSD; the time period during which the proposed Government Purpose License Rights (GPLR) shall remain in effect; and a complete description of the rights the Government shall have after the end of the GPLR period.

If there is no information to be submitted, the Offeror shall submit the list and enter “None” as the body of the list.

18. Provide Background Inventions and Licensing Associated with Sample Tasks.

The Offeror shall provide a list, entitled “Background Inventions-- Identification and Licensing” (the BIIL List), identifying all inventions described in and covered by any patents or pending patent applications in which the Offeror (1) has any right, title, or interest; and (2) intends to include in any items, components, or processes (ICP) to be developed or delivered under the resulting contract, or that are described or disclosed in any technical data (TD), computer software (CS), or computer software documentation (CSD) to be developed or delivered under the resulting contract. Such inventions are hereafter referred to as “background inventions.” The BIIL List shall be made an attachment to the resulting contract.

For each background invention, the BIIL List shall identify (1) the invention, by (i) patent or application number, (ii) title of the patent or application, and (iii) issue date of the patent, or filing date of the pending application; (2) the ICP, TD, CS, and CSD that will include or disclose the invention; (3) the nature of the Offeror's right, title, or interest in the invention; (4) whether the Government, or any third party, has any right, title, or interest in the invention, and if so, the nature of such right, title, or interest; and (5) whether the Offeror is willing to sell to the Government a license to practice the invention, and if so, the precise terms of such license. To be of any interest or value to the Government, any such license should grant the Government the right to practice, or to have practiced on its behalf, the background invention(s) at least for Government purposes related to the affected TIH equipment.

The BIIL List does not apply to, and shall not include, any “subject inventions.” Disclosure of, and rights in, subject inventions are governed by the appropriate patent rights clause.

If there are no background inventions to be identified in the BIIL List, the Offeror shall submit the list and enter “None” as the body of the list.

FACTOR 1, SUBFACTOR 1: SAMPLE TASKS 1 AND 2

SAMPLE TASK 1 – KICKOFF

Note: The Government intends to issue a task order for kickoff immediately following contract award based on this sample task.

The Offeror shall describe the approach it will use to develop the required knowledge and infrastructure to perform the initial team integration into the development process for TI-20. Offeror shall assume that it will join the Integrated Product Team (IPT) approximately 10 months after the TI-20 development process has begun. Offerors shall propose the government-provided labor hours shown in Table L-3, using an efficient and realistic mix of labor categories. Offerors who do not propose the hours provided in Table L-3 will be evaluated as unacceptable. This sample task represents the first three (3) months of effort. Response shall include the Offeror’s understanding of the development process for technology insertion, and a description of its approach to interface and interact with the program office technical teams and working groups. The Offeror shall assume that the Government has no prior knowledge of its capabilities and experience.

Table L-3: Hours for Sample Task 1

SAMPLE TASK PERFORMANCE YEAR ST 1 HOURS

Contract Year 1 (FY19/20) 3,038

SAMPLE TASK 2 - ENGINEERING

The U.S. Navy has a requirement to develop TI-20 shipsets for both new construction (NEWCON) and modernization of VIRGINIA Class submarine platforms. The NEWCON builds require all new hardware and enclosures. The modernizations will be from operational TI-14 hardware baselines to a TI-20 configuration. All the systems’ components shall facilitate future upgrades and permit incremental technology insertion to allow for incorporation of additional or higher performance elements with minimal impact on the existing systems. The architectural approach shall provide a viable technology insertion methodology and refresh strategy that supports application of a modular open systems approach and is responsive to changes and new technologies. The Offeror shall describe the approach required to design and develop the hardware upgrades, including how its approach relates and interfaces with the technology insertion process and associated participants. See SOW Section 3.2, Non- Recurring Engineering.

The U.S. Navy has a requirement for Engineering and Technical Support Services (SOW Section 3.4), including Field Service Engineering (SOW Section 3.4.3), to meet VIRGINIA Class submarine new construction and modernization installation, repair, and checkout services.

Offerors shall propose the government-provided labor hours shown in Table L-4, using an efficient and realistic mix of labor categories. Offerors who do not propose the hours provided in Table L-4 will be evaluated as unacceptable.

Table L-4: Hours for Sample Task 2

*Includes field engineering hours

FACTOR 1, SUBFACTOR 2: SAMPLE TASK 3

SAMPLE TASK 3 – PRODUCTION

The U.S. Navy has a requirement for TI-20 and TI-22 BYG-1 and ARCI shipsets for new construction (NEWCON) of VIRGINIA Class submarine platforms, BYG-1 shipsets for NEWCON COLUMBIA Class submarine platforms, and BYG-1 and ARCI modernization of VIRGINIA, LOS ANGELES, SEAWOLF, and OHIO Class submarine platforms. The BYG-1 shipsets include pre-cable kits and early installation items (See SOW Section 3.3, Production, Surge & Spares). A phased delivery schedule may be offered. However, delivery of the first shipset must be within the required delivery date of no later than nine (9) months after receipt of the delivery order.

Attachment 10 Worksheet 10G, Shipset Stepladder Pricing Table, identifies the forecasted variants. Each delivery order placed under the Production, Surge & Spares CLINs will be priced using the Variant, Stepladder Quantity ordered, and FY in which the order is placed. See the example of ordering methodology on Attachment 10, Worksheet 10G.

SAMPLE TASK (ST) PERFORMANCE YEAR HOURS

Contract Year 1 (FY19/20) 49,730

Contract Year 2 (FY20/21) 56,943

Contract Year 3 (FY21/22) 41,962*

Contract Year 4 (FY22/23) 21,490

FACTOR 2: MANAGEMENT

The narrative associated with the below sections must be sufficiently complete as to clearly demonstrate that the Offeror understands the overall management approach and resource aspects of the Technology Insertion Hardware equipment, and how the Offeror proposes to comply with the requirements of the RFP.

FACTOR 2, SUBFACTOR 1: PERSONNEL AND ORGANIZATION

(a) If teaming or joint venture is applicable, the Offeror shall expand the organizational description requested to illustrate the working levels of internal and external interfaces among subcontractors and team members.

The Offeror shall provide a description of the proposed organization, management capabilities, and planning and scheduling activities necessary to accomplish the obligations of the resulting contract. The Offeror shall provide a description of the parent corporation, company, subsidiary relationships, and subcontractors. The Offeror shall provide a copy of all proposed teaming arrangements (see FAR Subpart 9.6).

(b) The Government has identified the following “key” personnel: program manager, chief engineer, contracts manager, production manager, and manufacturing engineer. The Offeror shall identify any additional “key” personnel necessary for execution of its performance approach, and the unique knowledge of requirements or skills that factored into the assignment of those personnel to the sample tasks. The Offeror shall provide resumes for all “key” personnel. For personnel not currently employed by the Offeror, the resume should indicate “pending” and shall be signed by the individual represented by the resume.

Resumes for the key personnel shall be in Offeror’s format, not to exceed the page limit specified in Table L-1, and shall, at a minimum, include the following information:

i. Name

ii. Proposed Job Title & Labor Category

iii. Present Position & Company

iv. Time in Present Position

v. Total Years of Experience

vi. Education

vii. Current Security Clearance Level

viii. Percent of Time Assigned to applicable RFP CLINs for this effort

ix. Experience/Work History (include prior assignments)

x. Professional Memberships and Affiliations

xi. Patents and Publications

xii. Awards Received

Include the following statement on the resume of each key personnel, “We attest to the accuracy of the information contained herein, and that an agreement has been reached regarding salary, position, and work commitment to the TIH 20/22 contract.” The attestation must be signed and dated by both the employee and a company official.

For key personnel who do not currently work for the Offeror or major subcontractor (subcontractors proposed to perform at least $5M or more per year for this requirement (hereinafter all such firms are referred to as “major subcontractors”)), the Offeror shall provide documentary evidence of the individual’s availability to support these requirements (e.g., work agreements, contracts, and letters of intent). If the Offeror plans to locate key personnel off-site from the design and/or production facilities, the Offeror shall describe how engineering, production, quality, and management teams overcome risks due to geographic distance and organizational structures.

Although Section M contemplates Key Personnel becoming unavailable prior to contract award, Offerors shall only propose Key Personnel and provide resumes for individuals that, at the time of proposal submission, the Offeror has a good faith expectation of providing at award. Additionally, the Government considers the submission of Letters of

Intent for proposed contingent Key Personnel to be material to the proposal since these Letters of Intent demonstrate the offeror's ability to hire personnel with the qualifications offered at the salary proposed.

(c) The Offeror shall submit its staffing plan for the Sample Tasks. The Offeror shall identify all assumptions related to the allocation of labor mixes associated with the Sample Tasks. The staffing plan shall contain the time phased application of resources for the Sample Tasks. The hours of the Sample Tasks, in total, do not equal 100% of the hours for the total effort anticipated under this contract. However, they are meant to be substantially reflective of the labor mix of the workforce required for successful performance of TIH 20/22. The labor hours and labor mix provided in the staffing plan submitted shall match exactly the labor hours and labor mix proposed in Attachment 4, Labor Hour Breakdown, and Attachment 10, Cost Summary, Worksheets 10A and 10B. If the Offeror’s titles and job descriptions differ from Attachment 7, Standard Labor Category Descriptions, the Offeror shall provide the company’s equivalent titles and description in a cross-referenced matrix.

FACTOR 2, SUBFACTOR 2: MANAGEMENT AND CONTROL

(a) The Offeror shall provide a description of Cost, Performance, and Schedule metrics that will be generated and reported to the Government on a monthly basis during the execution of this contract. Description shall include the Offeror’s proposed Cost/Schedule Control System and how the management team will use this information to manage cost, technical performance, risk, and schedule, and to monitor and adjust project performance.

(b) The Offeror shall describe how it will generate and maintain a CWBS. The Offeror shall include a CWBS that is tied to the IMS, and shall be a minimum of three levels. It shall also contain the level necessary to reach manageable units of functional tasks that reflect the way the work is being performed. The Offeror shall provide a detailed explanation of every functional element it proposes. The Offeror shall organize its responses in a functional/organizational context within their proposed CWBS.

(c) The Offeror shall discuss how it will manage its subcontractors to ensure products are delivered on time and within budget, and are of sufficient quality to enable the Offeror to meet all contractual requirements. Description shall include contractual arrangements, qualification requirements, selection process(es), contingency plans, and management interactions, including performance feedback.

FACTOR 2, SUBFACTOR 3: FACILITIES

The Offeror shall demonstrate that it has adequate design, development, testing, and manufacturing capability and capacity for successful performance of all described requirements, including development and Defense Security Service (DSS) compliant manufacturing facilities across all proposed technology insertion baselines. The Offeror must describe and discuss the facilities in the context of specific plans for the resultant contract, including facility clearance information and status.

The Offeror’s proposal shall:

(a) Describe its facilities for the physical inspection and storage of incoming materials and vendor supplied items; production, fabrication, and assembly; performing critical processes and procedures; and development, production test and inspection.

(b) Identify any additional capital equipment required to meet the design, manufacture, inspection, and testing requirements for Technology Insertion Hardware equipment.

(c) Describe the simulations to be incorporated into the test facility and the method of accreditation of each.

(d) Describe the layout of space, provide a diagram of its facilities for this specific program, and assure the availability of the facilities to meet the Government’s requirements.

(e) State whether the facilities are leased or owned. If leased, the Offeror must provide copies of all pertinent leases. The lease documents are not included in the overall Volume I proposal page limitation of the solicitation.

(f) Identify any use of facilities, in addition to those identified above, required to fully execute the effort associated with this RFP including the plan for use, effort to coordinate the effort, and support provided at the locations.

(g) Describe the overall timeline for setting up the manufacturing processes and production facility, including obtaining and setting up the necessary capital equipment.

(h) Describe the geographic locations, including layout of space and how the locations relate to each other to facilitate delivery of the final products.

(i) The Offeror shall describe the approach to identify and mitigate increased lead times for workload when multiple orders or multiple shipsets are ordered simultaneously.

2.4 VOLUME II - PAST PERFORMANCE PROPOSAL (FACTOR 3)

Offerors are requested to submit the following information in Volume II – Past Performance Proposal:

A list of up to five (5) relevant contracts for the Offeror, and up to two (2) relevant contracts for each major subcontractor, that represent similar scope, magnitude, and complexity to the efforts described herein. The contracts identified must have been underway for at least six (6) months or longer; been performed by the same CAGE Code or provide an explanation why the different CAGE Code is relevant past performance; and if completed, must have been completed within the past three (3) years.