Solicitation N00253-17-R-0001

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 31 Oct 2017

X

A X B X C X D

EX

X

G F 71 - 100

101 - 130 X H 131 - 141

GINA.MELOY@NAVY.MIL

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C9 1 141

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00253 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Block 7 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

GINA MELOY 360-315-0433

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 18

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

19 - 27 28 - 29

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

30 - 34 35 - 37

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 38 - 42 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 43 - 48 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

49 - 69

PART II - CONTRACT CLAUSES

NAVAL UNDERSEA WARFARE CENTER

ATTN: GINA.MELOY@NAVY.MIL

610 DOWELL STREET, BLDG 206A

KEYPORT WA 98345 360-315-0433

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

26 Sep 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00253-17-R-0001

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 9 Each ADC MK 3 First Article

CPFF

Torpedo Acoustic Device Countermeasure MK 3 Launch Tube Assembly (LTA) in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 9 Each ADC MK 4 First Article

CPFF

SONAR Acoustic Device Countermeasure MK 4 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

0003 1,500 Hours Engineering Services Base

CPFF

Engineering Services Base Year Period of Performance is:

Date of Contract Award through one year thereafter.

0004 1 Lot ODCs Base

COST

Other Direct Costs associated with CLIN 0003 Period of Performance is:

Date of Contract Award through one year thereafter.

0005 1 Lot CDRLs Base

FFP

Contract Data Requirements Lists, in accordance with DD 1423, Exhibits A, B, and C.

Not Separately Priced (NSP) Delivery is as specified in each CDRL Data Item.

NET AMT

1001 Each OPTION ADC MK 3 Opt. One

FFP

TADC MK 3 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

STEPLADDER PRICING

STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE

1001 1001 1.00 25.00

26.00 50.00

51.00 75.00

76.00 100.00

101.00 124.00

1002 Each OPTION ADC MK 4 Opt. One

FFP

SADC MK 4 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1002 1002 1.00 12.00

13.00 24.00

25.00 36.00

37.00 48.00

49.00 59.00

1003 1,500 Hours OPTION Engineering Services Opt. One

CPFF

Engineering Services Option Year Two Period of Performance is:

Date of Option Exercise through one year thereafter.

1004 1 Lot OPTION ODCs Opt. One

COST

Other Direct Costs associated with CLIN 1003 Period of Performance is:

1005 1 Lot OPTION CDRLs Opt. One

FFP

Contract Data Requirements Lists, in accordance with DD 1423, Exhibits A, B, and C.

Not Separately Priced (NSP).

2001 Each OPTION ADC MK 3 Opt. Two

FFP

TADC MK 3 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2001 2001 1.00 25.00

26.00 50.00

51.00 75.00

2002 Each OPTION ADC MK 4 Opt. Two

FFP

SADC MK 4 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2002 2002 1.00 12.00

13.00 24.00

25.00 36.00

2003 1,500 Hours OPTION Engineering Services Opt. Two

CPFF

Engineering Services Option Year Two Period of Performance is:

2004 1 Lot OPTION ODCs Opt. Two

COST

Other Direct Costs associated with CLIN 2003 Period of Performance is:

2005 1 Lot OPTION CDRLs Opt. Two

FFP

Contract Data Requirements Lists, in accordance with DD 1423, Exhibits A, B, and C.

Not Separately Priced (NSP)

2006 Each OPTION Launch Tubes

FFP

Launch Tube Production, in accordance with Drawing No. 6658880 Rev C, the Statement of Work, and all associated drawings and specifications.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2006 2006 20.00 23.00

24.00 26.00

27.00 29.00

30.00 32.00

33.00 34.00

3001 Each OPTION ADC MK 3 Opt. Three

FFP

TADC MK 3 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3001 3001 1.00 25.00

26.00 50.00

51.00 75.00

3002 Each OPTION ADC MK 4 Opt. Three

FFP

SADC MK 4 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3002 3002 1.00 12.00

13.00 24.00

25.00 36.00

3003 1,500 Hours OPTION Engineering Services Opt. Three

CPFF

Engineering Services Option Year Three Period of Performance is:

3004 1 Lot OPTION ODCs Opt. Three

COST

Other Direct Costs associated with CLIN 3003 Period of Performance is:

3005 1 Lot OPTION CDRLs Opt. Three

FFP

Contract Data Requirements Lists, in accordance with DD 1423, Exhibits A, B, and C.

Not Separately Priced (NSP) Delivery is as specified in each CDRL Data Item, 3006 Each OPTION Launch Tubes Opt. One

FFP

Launch Tube Production, in accordance with Drawing No. 6658880 Rev C, the Statement of Work, and all associated drawings and specifications.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3006 3006 20.00 23.00

24.00 26.00

27.00 29.00

4001 Each OPTION ADC MK 3 Opt. Four

FFP

TADC MK 3 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4001 4001 1.00 25.00

26.00 50.00

51.00 75.00

4002 Each OPTION ADC MK 4 Opt. Four

FFP

SADC MK 4 LTA in accordance with PMS415-LA-004-PIPS Rev D, the Statement of Work, and all associated drawings and specifications.

Delivery shall be in lots of 20 to 24 devices per month.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4002 4002 1.00 12.00

13.00 24.00

25.00 36.00

4003 1,500 Hours OPTION Engineering Services Opt. Four

CPFF

Engineering Services Period of Performance is:

4004 1 Lot OPTION ODCs Opt. Four

COST

Other Direct Costs associated with CLIN 4003.

Period of Performance is:

4005 1 Lot OPTION CDRLs Opt. Four

FFP

Contract Data Requirements Lists, in accordance with DD 1423, Exhibits A, B, and C.

Not Separately Priced (NSP)

4006 Each OPTION Launch Tubes Opt. Two

FFP

Launch Tube Production, in accordance with Drawing No. 6658880 Rev C, the Statement of Work, and all associated drawings and specifications.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4006 4006 20.00 23.00

24.00 26.00

27.00 29.00

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

(End of Text)

HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

HQ B-2-0009 NOTE (CDRL)

NOTE A - Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item on the Contract Data Requirements List(s), Exhibits A, B, and C, attached hereto.

HQ B-2-0014 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (MAY 1993)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed-fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to TBD at time of award percent ( ) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money).

Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF FUNDS" (FAR 52.232-22) or "LIMITATION OF COST" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

HQ B-2-0020 TRAVEL COSTS – ALTERNATE I (NAVSEA) (APR 2015)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs determined to be allowable, allocable and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer or their duly authorized representative, as advised by DCAA.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;

however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST/FIXED PRICE) (FEB 1997)

This contract includes the following mixture of cost reimbursement and fixed price line items:

Item CLINs Type TADC MK 3 LTA First Article 0001 Cost Plus Fixed Fee SADC MK 4 LTA First Article 0002 Cost Plus Fixed Fee TADC MK 3 LTA 1001, 2001, 3001, 4001 Firm Fixed Price SADC MK 4 LTA 1002, 2002, 3002, 4002 Firm Fixed Price

Engineering Services 0003, 1003, 2003, 3003, 4003 Cost Plus Fixed Fee Other Direct Costs 0004, 1004, 2004, 3004, 4004 Cost CDRLs 0005, 1005, 2005, 3005, 4005 Not Separately Priced Launch Tubes 2006, 3006, 4006 Firm Fixed Price

Section C - Descriptions and Specifications

HQ C-2-0026 FIRST ARTICLE

HQ C-2-0026 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (APR 2015)

(a) For the purpose of this contract, the "First Article" is synonymous with the terms "preproduction model(s) and "preproduction equipment".

(b) The First Article shall conform in every respect to the requirements of this contract and shall be fully tested by the Contractor to determine compliance with said requirements. The production equipment shall be manufactured with tools, material and methods that are the same as or representative of the tools, material and methods that were used to manufacture the First Article.

(c) Pursuant to paragraph (e) of the clause entitled "FIRST ARTICLE APPROVAL--CONTRACTOR TESTING" (FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.*

HQ C-1-0001 ITEM(S) 0005, 1005, 2005, 3005, and 4005 - DATA REQUIREMENTS (NAVSEA) (SEP 1992)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, B, and C , attached hereto.

HQ C-2-0002 ACCESS TO PROPRIETARY DATA OR COMPUTER SOFTWARE (NAVSEA) (JUN 1994)

(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party who asserts that such data or software is proprietary. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the proprietary data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains proprietary. In addition, the agreement shall not impose any limitation upon the Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).

(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with the spirit and intent of this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.

(c) The restrictions on use and disclosure of the data and software described above also apply to such information received from the Government through any means to which the Contractor has access in the performance of this contract that contains proprietary or other restrictive markings.

(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt by an individual, company, or Government representative not directly involved in the effort to be performed under this contract to gain access to such proprietary information. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.

(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting "subcontractor" for "Contractor" where appropriate.

(f) Compliance with this requirement is a material requirement of this contract.

HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS (NAVSEA) (MAY 1993)

To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or Data item Descriptions of the contract or as required by orders for spare and repair parts. The cognizant Government Contract Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.

HQ C-2-0009 ASSIGNMENT OF SERIAL NUMBER(S) (NAVSEA) (SEP 1990)

The Contractor shall request serial number assignment, in writing, from the Cognizant Technical Program Office, with a copy to the cognizant Contract Administration Office. The request for serial number assignment shall contain the following minimum information:

(a) Contract number;

(b) Assigned line item number and description;

(c) Assigned type designation;

(d) Assigned model number;

(e) Top drawing number and ID (List of Drawings) number;

(f) Exact quantity for which serial numbers are being requested, including preproduction samples required by the contract; and

(g) National Stock Number

HQ C-2-0011 COMPUTER SOFTWARE AND/OR COMPUTER DATABASE(S) DELIVERED TO

AND/OR RECEIVED FROM THE GOVERNMENT (NAVSEA) (APR 2004)

(a) The Contractor agrees to test for viruses all computer software and/or computer databases, as defined in the clause entitled "RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL COMPUTER SOFTWARE DOCUMENTATION" (DFARS 252.227-7014), before delivery of that computer software or computer database in whatever media and on whatever system the software is delivered. The Contractor warrants that any such computer software and/or computer database will be free of viruses when delivered.

(b) The Contractor agrees to test any computer software and/or computer database(s) received from the Government for viruses prior to use under this contract.

(c) Unless otherwise agreed in writing, any license agreement governing the use of any computer software to be delivered as a result of this contract must be paid-up and perpetual, or so nearly perpetual as to allow the use of the computer software or computer data base with the equipment for which it is obtained, or any replacement equipment, for so long as such equipment is used. Otherwise the computer software or computer database does not meet the minimum functional requirements of this contract. In the event that there is any routine to disable the computer software or computer database after the software is developed for or delivered to the Government, that routine shall not disable the computer software or computer database until at least twenty-five calendar years after the delivery date of the affected computer software or computer database to the Government.

(d) No copy protection devices or systems shall be used in any computer software or computer database delivered under this contract to restrict or limit the Government from making copies. This does not prohibit license agreements from specifying the maximum amount of copies that can be made.

(e) Delivery by the Contractor to the Government of certain technical data and other data is now frequently required in digital form rather than as hard copy. Such delivery may cause confusion between data rights and computer software rights. It is agreed that, to the extent that any such data is computer software by virtue of its delivery in digital form, the Government will be licensed to use that digital-form data with exactly the same rights and limitations as if the data had been delivered as hard copy.

(f) Any limited rights legends or other allowed legends placed by a Contractor on technical data or other data delivered in digital form shall be digitally included on the same media as the digital-form data and must be associated with the corresponding digital-form technical data to which the legends apply to the extent possible. Such legends shall also be placed in human-readable form on a visible surface of the media carrying the digital-form data as delivered, to the extent possible.

HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2015)

(a) Baseline Definition - For configuration control purposes, all contractual documentation in effect at the time of contract award shall constitute the Contract Baseline which shall be considered incorporated in the baseline documentation.

(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.

The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify baseline documents to resolve the conflict or to allow non-compliance.

Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer. Change documentation shall be submitted to the Contracting Officer in accordance with the Contract Data Requirements List (CDRL), and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015 and MIL-HDBK- 61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs) – An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.

DI-SESS-80640D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document.

(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the following circumstances:

(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.

(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.

(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.

(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.

(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be incorporated in the contract modification that implements the change.

(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "DISPUTES" (FAR 52.233-1).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR 52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-SESS-80639D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clause shall also be submitted as part of the change request.

HQ C-2-0014 CONTRACTOR'S PROPOSAL (NAVSEA) (MAR 2001)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal dated in response to NAVSEA Solicitation No. N00253-17-R-0001 (to be completed upon award).

(b) The technical volume(s) of the Contractor's proposal is incorporated by reference and hereby made subject to the provisions of the "ORDER OF PRECEDENCE" (FAR 52.215-8) clause of this contract. Under the "ORDER OF PRECEDENCE" clause, the technical volume of the Contractor's proposal referenced herein is hereby designated as item

(f) of the clause, following "the specification" in the order of precedence.

HQ C-2-0023 EXCLUSION OF MERCURY (NAVSEA) (MAY 1998)

Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.

HQ C-2-0024 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

HQ C-2-0032 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT - ALTERNATE II

(NAVSEA) (SEP 2009)

(a) NAVSEA Form 4340/2 or Schedule C, as applicable, Government Furnished Information, attached hereto, incorporates by listing or specific reference, all the data or information which the Government has provided or will provide to the Contractor except for

(1) The specifications set forth in Section C, and

(2) Government specifications, including drawings and other Government technical documentation which are referenced directly or indirectly in the specifications set forth in Section C and which are applicable to this contract as specifications, and which are generally available and provided to Contractors or prospective Contractors upon proper request, such as Federal or Military Specifications, and Standard Drawings, etc.

(b) Except for the specifications referred to in subparagraphs (a)(1) and (2) above, the Government will not be obligated to provide to the Contractor any specification, drawing, technical documentation or other publication which is not listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable, notwithstanding anything to the contrary in the specifications, the publications listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable, the clause entitled "GOVERNMENT PROPERTY" (FAR 52.245-1) or "GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES " (FAR 52.245-2), as applicable, or any other term or condition of this contract.

(c)(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable; or

(ii) add items of data or information to NAVSEA Form 4340/2 or Schedule C, as applicable; or

(iii) establish or revise due dates for items of data or information in NAVSEA Form 4340/2 or Schedule C, as applicable.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (c)(1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

HQ C-2-0033 LIMITATION OF LIABILITY - HIGH VALUE ITEMS (NAVSEA) (JUN 1992)

The following items are subject to the clause of this contract entitled "LIMITATION OF LIABILITY--HIGH VALUE

ITEMS" (FAR 52.246-24):

CLINs 0001 and 0002

HQ C-2-0051 SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements.

All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only.

HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)

If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

HQ C-2-0065 SOFTWARE DEVELOPMENT REQUIREMENTS (NAVSEA) (JUN 2017)

(a) The contractor shall define a general Software Development Plan (SDP) appropriate for the computer software effort to be performed under this contract. The SDP shall, at a minimum:

(1) Define the contractor's proposed life cycle model and the processes used as a part of that model. In this context, the term "life cycle model" is as defined in IEEE Std. 12207:2008;

(2) Contain the information defined by ISO/IEC/IEEE 15289:2017, section 7.3 (generic content) and the Mapping of ISO/IEC 12207:2008 (IEEE Std. 12207:2008) Clauses to Information Items for Each Software Life Cycle Process in Table 2 of ISO/IEC/IEEE 15289:2017. In all cases, the level of detail shall be sufficient to define all software development processes, activities, and tasks to be conducted;

(3) Identify the specific standards, methods, tools, actions, strategies, and responsibilities associated with development and qualification;

(4) Document all processes applicable to the system to be acquired, including the Primary, Supporting, and Organizational life cycle processes as defined by IEEE Std. 12207:2008 as appropriate. Such processes shall be equivalent to those articulated by CMMI®;

(5) Include the content defined by all information items listed in Table 2 of ISO/IEC/IEEE 15289:2017, as appropriate for the system and be consistent with the processes proposed by the developers;

(6) Adhere to the characteristics defined in section 6.1 ISO/IEC/IEEE 15289:2017, as appropriate;

(7) Describe the overall life cycle and include primary, supporting, and organizational processes based on the work content of this contract;

(8) Be in accordance with the framework defined in IEEE Std. 12207:2008, including, but not limited to, defining the processes, the activities to be performed as a part of the processes, the tasks which support the activities, and the techniques and tools to be used to perform the tasks;

(9) Contain a level of information sufficient to allow the use of the SDP as the full guidance for the developers. In accordance with 7.3 of ISO/IEC/IEEE 15289:2017, such information shall at a minimum contain, specific standards, methods, tools, actions, reuse strategy, and responsibility associated with the development and qualification of all requirements, including safety and security.

(b) The SDP shall be delivered to the Government for concurrence under CDRL and shall not vary significantly from that proposed to the Government for evaluation for award. The contractor shall follow the Government concurred with SDP for all computer software to be developed or maintained under this effort. Any changes, modifications, additions or substitutions to the SDP also require prior Government concurrence.

ADDENDUM TO STATEMENT OF WORK

1. See attachment 11 for the Statement of Work

2. The following standards, as referenced in drawings 8290900, 487266, 6561468, 6658880, 6658881, 487350, and 6658885 have been replaced, updated, canceled, or superseded:

MIL-STD-100 & DoD-STD-100 have been replaced by ASME Y14.100, Y14.24, Y14.35, Y14.34, 30 July 2013 FED-STD-595 has been updated to SAE AMS-STD-595, February 2017

DoD-P-15328 has been canceled without replacement MIL-S-46163 has been superseded by ASTM D5363, 01 April 2016 TT-E-490 has been replaced by MIL-PRF-24635, 15 September 2009 MS51861 has been updated to NASM51861, 29 March 2000 MS70085 has been updated to PIA PS70085, 28 March 2015 MIL-STD-278 has been replaced by NAVSEA S9074-AR-GIB-010/278, 14 February 2013 MIL-T-81533 has been canceled without replacement MIL-L-46147 has been updated to MIL-PRF-46147, 05 November 2013 MIL-P-24441 has been updated to MIL-DTL-24441, 27 August 2009

3. In order to ensure compliance with all the specification requirements, the contractor shall indicate in its offer and notify the Government in a cover letter, what specifications, if any, the offeror does not intend to meet. The offeror shall explain, in detail, how any proposed deviation/exception will nonetheless meet the Government's functional requirements. Should descriptive literature be supplied by the offeror, it will be presumed that the offeror intends to meet all of the specifications, regardless of the descriptive literature, unless the offeror specifically notes its exceptions. It shall be the obligation of the contractor to exercise due diligence to discover and to bring to the attention of the contracting officer at the earliest possible time, in writing, any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated by reference herein.

4. Restricted Drawings and Technical Information are only available by accessing Federal Business Opportunities (FBO). Registration instructions and Vendor Guide books can be found on the FBO homepage https://www.fbo.gov. Drawings referenced in this solicitation are restricted by the Arms Export Control Act and are ONLY available to vendors/contractors appointed Data Custodians that are registered with Defense Logistics Information Service (DLIS) Joint Certification Program (JCP).

Vendor’s/Contractor’s Data Custodian’s that are not registered with DLIS JCP can obtain registration information at www.dlis.dla.mil/jcp/ or by phone at 888-352-9333. Drawings for this solicitation have been posted to the FBO website: https://www.fbo.gov. Bidders who have registered with FBO and have registered in DLIS JCP can access this data under solicitation number: N00253-17-R-0001.

5. Classified documents may be obtained by emailing a request to gina.meloy@navy.mil. The request must include the company name; facility security officer name, email address, and phone number; and the CAGE code and mailing address of the facility at which the classified documents will be handled. Classified documents will not be provided to anyone without the requisite security clearance (see Attachment 1, Contract Security Classification Specification, DD form 254).

6. Performance under this contract requires the contractor to adhere to Operations Security (OPSEC) requirements. Explanation of these requirements is detailed in Section I of the Operations Security Guide for Defense Contractors available online at:

http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx Click on OPSEC Guide for Defense Contractors on the right-hand side.

Section D - Packaging and Marking

HQ D-1-0001 Data Packaging Language (NAVSEA) (JUL 2016)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 with Change 2 dated 18 May 2016.

HQ D-1-0002 PACKAGING OF SUPPLIES

The supplies furnished hereunder shall be packaged in accordance with best commercial practice.

HQ D-2-0005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (APR 2015)

(a) Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.

To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:

(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.

(2) Parts manufactured to Government specifications shall be marked as follows:

(i) Electrical Parts - that is, all parts in electrical equipments and electrical parts when used in equipments which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(1) dated 10 November 2010, or, where MIL-STD-1285D(1) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.

(ii) Electronic Parts - that is, all parts in electronic equipments and electronic parts when used in equipments which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.

(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N(1).

(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

HQ D-2-0007 MARKING AND PACKING LIST(S) - ALTERNATE I (NAVSEA) (APR 2015)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL-STD- 129R dated 18 February 2014.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL-STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped.

The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.

HQ D-2-0008 MARKING OF REPORTS (NAVSEA) (SEP 1990)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor

(2) contract number

(3) contract dollar amount

(4) whether the contract was competitively or non-competitively awarded

(5) sponsor: (to be completed at time of award) (Name of Individual Sponsor)

(Name of Requiring Activity)

(City and State)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Origin Government Origin Government 0002 Origin Government Origin Government 0003 Origin Government Origin Government 0004 Origin Government Origin Government 0005 Origin Government Origin Government 1001 Origin Government Origin Government 1002 Origin Government Origin Government 1003 Origin Government Origin Government 1004 Origin Government Origin Government 1005 Origin Government Origin Government 2001 Origin Government Origin Government 2002 Origin Government Origin…