This is an Attachment Cross Reference Matrix that maps proposal requirements to evaluation criteria for the SeaPort CNSP Readiness Assistance Training Team (RATT) Support contract solicitation N00244-26-R-3108. The matrix serves as a guide for contractors to understand how Performance Work Statement (PWS) requirements align with proposal section expectations and evaluation sub-factors.

The matrix organizes requirements into four primary evaluation categories: Technical Approach (Sub-Factor I), Evaluation Management Plan (Sub-Factor II), and Staffing (Sub-Factor III). Technical Approach requirements include Fleet Engagement and Assessment (planning and executing RATT ship visits and ORCA assessments), Mentorship and Knowledge Transfer (expert-level mentorship and on-the-job training), Root Cause Analysis and Reporting (identifying deficiencies, generating Assessment Work Reports, and recommendations), and Stakeholder Communication and Liaison (managing communications with Government stakeholders including TYCOM, ISIC, ATG, and ships). Staffing requirements mandate U.S. citizenship for all personnel, final SECRET security clearance at award, and PKI certificate capability for encrypted email communications. Key personnel positions require the RATT Program Manager to have 15+ years management experience (25+ desired), former CO and CHENG background, PMP certification, and a post-graduate degree; Team Leads require 15+ years supervisory experience (25+ desired) with extensive naval leadership and technical experience; and Functional Team Leads (MGTI, DEI, SGPI, 3M, Deck, Combat Systems) require 15+ years supervisory experience with specific Navy Inspector or Subject Matter Expert experience. The Evaluation Management Plan submission must address overall management methodology, transition and onboarding processes, organizational structure with functional relationships and reporting hierarchy, risk management approaches, subcontractor roles if applicable, and a Quality Control Plan aligned with the Government's Quality Assurance Surveillance Plan (QASP).

View the file

Other files

File Type Posted
Questions and Answers.docx DOCX document
Draft Solicitation - N0024426R3108 6-8-26.pdf PDF
1.17 OPPD 26-R-3108 CNSP RATT.docx DOCX document
1.17 RATT_ORCA CDRLs DD 1423 updated 260514.pdf PDF
1.02 RATT PWS Draft 6-3-2026.docx DOCX document
1.17 RATT DD 254 APR 2026.pdf PDF
1.17 CNSP RATT Price Template 5-7.xlsx XLSX spreadsheet
1.17 Section L M - RATT 6-4 v2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFP CNSP RATT N00244-26-R-3108
Technical Approach Reference Matrix
PWSDescriptionSection LSection MMeets minimum requirements?Proposal SectionContractor Response
4.1, 4.3-4.8, 4.10, 4.11, 4.31Fleet Engagement and Assessment: Approach for planning, scheduling, coordinating, and executing RATT ship visits and ORCA assessments.Sub-Factor ISub-Factor I
4.9, 4.12-4.15, 4.17-4.20, 4.25, 4.26Mentorship and Knowledge Transfer: Methodology for providing effective, expert-level mentorship and on-the-job training to senior shipboard personnel.Sub-Factor ISub-Factor I
4.2, 4.21-4.24, 4.33, 4.34, 4.36, 5.0Root Cause Analysis and Reporting: Approach for identifying/analyzing deficiencies, generating draft AWRs, trip reports, and actionable recommendations.Sub-Factor ISub-Factor I
4.27-4.29, 4.32, 4.37Stakeholder Communication and Liaison: Plan for managing communications with Government stakeholders (TYCOM, ISIC, ATG, ships) to de-conflict schedules and report findings.Sub-Factor ISub-Factor I
1.4.9.3, 1.4.9.4Ability to communicate with encrypted email (PKI cert) and possess CONFIDENTIAL facility clearance.Go/No Go Evaluation
Management Plan Cross Reference Matrix
PWSDescriptionSection LSection MMeets minimum requirements?Proposal SectionContractor Response
4.30, GeneralOverall Management: Methodology for managing technical requirements, contract administration, status reporting, and supervision of dispersed teams.Sub-Factor IISub-Factor II
GeneralTransition Plan: Process for assuming responsibility and onboarding personnel without disrupting scheduled visits.Sub-Factor IISub-Factor II
GeneralOrganizational Structure: Generic org chart with functional relationships, lines of authority, and reporting chain of command.Sub-Factor IISub-Factor II
GeneralRisk Management: Approach to managing unplanned events (e.g., unexpected key personnel departures) and techniques to mitigate PWS implementation risksSub-Factor IISub-Factor II
GeneralSubcontractors (if applicable): Addressed role of any subcontractors and their relationship with the prime contractor.Sub-Factor IISub-Factor II
1.4.6, 6.0Quality Control Plan (QCP): Self-monitoring QA methods, performance measurement metrics (aligning with QASP), PWS compliance, and discrepancy resolution.Sub-Factor IISub-Factor II
Staffing Cross Reference Matrix
PWSDescriptionSection LSection MMeets minimum requirements?Proposal SectionContractor Response
7.0, 7.1, 7.2Staffing Plan: Explanation of how staffing meets stringent PWS qualifications and is capable of completing all PWS tasks.Sub-Factor IIISub-Factor III
1.4.9.1.All workforce personnel are U.S. citizensSub-Factor IIISub-Factor III
GeneralRecruitment & Retention: Current staff retention rate, ability to source/recruit, and strategies (e.g., fringe benefits) to maintain competent employees.Sub-Factor IIISub-Factor III
1.4.9, 1.4.9.2Cleared Personnel: Acknowledge and document ability to provide a workforce with a final SECRET security clearance at the time of award.Sub-Factor IIISub-Factor III
7.1.1RATT Program Manager: Resume & Letter of Intent (if applicable) provided. Secret clearance. 15+ yrs mgmt exp (25+ desired). Former CO & CHENG. PMP cert. Post-graduate degree from an accredited university in management or a technical field.Sub-Factor IIISub-Factor III
7.1.2Team Leads (ORCA, RATT): Resumes & Letters of Intent (if applicable) provided. Secret clearance. 15+ yrs supervisory exp (25+ desired). Extensive naval leadership and technical exp. Under-graduate or associates degree or, 7 years demonstrated experience in a management role.Sub-Factor IIISub-Factor III
7.1.3-7.1.8Functional Team Leads (MGTI, DEI, SGPI, 3M, Deck, Combat Systems): Resumes & Letters of Intent (if applicable) provided. Secret clearance. 15+ yrs supervisory exp (25+ desired). Specific Navy Inspector/SME exp. Under-graduate or associates degree or, 7 years demonstrated experience in a management role.Sub-Factor IIISub-Factor III
7.1Key Personnel Designation: Clear designation of proposed individuals for the PM, Team Leads, and Functional Leads roles.Sub-Factor IIISub-Factor III