This is a Statement of Work (SOW) for the fabrication, delivery, and installation of custom mixed media art displays and murals at Naval Base Point Loma SUBASE Galley in San Diego, California.
The contractor must provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to create and install twenty mixed media art installations across various galley locations. Deliverables consist of mixed media art installations with hand-done art relief on drywall, cut to size, using CMYK 3M materials. Installation locations and dimensions range from a 39' W x 7' H wall at the drink line to smaller 3' W x 5.5' H walls in the mess line areas, with a prominent 27' W x 12' H feature wall. The contractor must employ a professional visual artist to design installations incorporating custom commercial-grade wallpaper or high-tack vinyl, hand-painted accents, high-definition photography integration, LED backlighting, wood elements, floating walls for three-dimensional effects, and other materials to enhance the overall aesthetic. The contractor shall provide design drafts using photo-specific references, assess and prepare all affected areas for installation, fabricate floating walls with integrated LED lighting, and ensure proper wiring and wire management of all electronic elements.
Contractor responsibilities include verifying all dimensions prior to bidding and installation, providing certified personnel, and coordinating work schedules with the Food Service Officer to accommodate meal service hours (Breakfast 0600-0730, Lunch 1100-1230, Dinner 1600-1730). Work is permitted Monday through Friday from 0730-1700 outside meal hours, with night or weekend shifts available at no additional cost if coordinated with the FSO. The contractor must provide plastic barriers for dust and paint containment, perform daily cleanup and debris disposal to designated containers, obtain required base security clearance, and ensure work areas do not interfere with dining operations. The period of performance is 25 September 2026 to 24 September 2027, with work performed at Naval Base Point Loma SUBASE, 140 Sylvester Rd Bldg 500, San Diego, CA 92106.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 02-SOW-NBPL SUBASE-MURALS.pdf | ||
| RFQ N0024426Q0099v2.pdf | ||
| QUESTIONS - Amendment 1.pdf | ||
| RFQ N0024426Q0099.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Naval Base Point Loma SUBASE 140 Sylvester Rd Bldg 500, San Diego, CA 92106 San Diego, CA 92147
Project Title: Mixed Media Art Installation
1.0 Objective
The purpose of this Statement of Work is to define the requirements for the fabrication, delivery, and installation of custom mixed media art displays and murals at Naval Base Point Loma SUBASE Galley located in Point Loma.
2.0 Scope of Work
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to fulfill the requirements of the art installations as specified in this document. The work includes the creation of mixed media art with integrated photography, artist relief elements, and proper mounting/application to designated glass and drywall surfaces.
3.0 Deliverables and Specifications
All deliverables are to be Mixed Media Art Installations with Hand Done Art Relief on Dry Wall, cut to size, using CMYK 3M materials.
Item No. Location / Description Dimensions Qty
0001 Drink Line First Wall 39' W x 7' H 1
0002 Drink Line Wall 2 12' W x 7' H 1
0003 Drink Machine Wall 16' W x 3' H 1
0004 Mess Line to Mess Deck Wall (Site A) 3' W x 5 1/2' H 1
0005 Mess Line to Mess Deck Wall (Site B) 3' W x 5 1/2' H 1
0006 Mess Deck Wall 1 11 1/2' W x 5 1/2' H 1
0007 Mess Deck Wall 2 29 1/2' W x 5 1/2' H 1
0008 Salad Bar STBD Side 20' W x 3' H 1
0009 Salad Bar Port Side 1 24' W x 3' H 1
0010 Salad Bar Port Side 2 8' W x 5 1/2' H 1
0011 Khaki Side Hat Area 19' W x 5 1/2' H 1
0012 Khaki Side Wall 1 5' W x 5 1/2' H 1
0013 Khaki Side Wall 2 15 1/2' W x 5 1/2' H 1
0014 Khaki Side Wall 3 9' W x 5 1/2' H 1
0015 Point Loma Wall 27' W x 12' H 1
0016 Grill Serving Line 1 10' W x 2 1/2' H 1
0017 Serving Line 2 9 1/2' W x 2 1/2' H 1
0018 Serving Line 3 8 3/4' W x 2 1/2' H 1
0019 Inside Galley Wall 1 9 1/2' W x 8 1/2' H 1
0020 Inside Galley Wall 2 21' W x 8 1/2' H 1
4.0 Additional Requirements
a. The contractor shall provide consultation services to gain an understanding of specific visual references to incorporate into the mural work that are expressive of the location, culture, interest, or desired aesthetic of the client.
b. The contractor shall use a professional visual artist, design a mixed-media mural wall(s) that incorporates custom, commercial-grade wallpaper or high tach commercial grade vinyl, hand painted accents, high definition photography integration, LED lighting, wood, floating walls to create a 3 dimensional effect, and any other materials needed to enhance the overall look and feel of the space. (Consideration to the use of props, such as hanging décor, should be included and provided to further established the desired look and feel of the space.) The design should be artistic in nature and employ the use of stylization, fonts, negative and positive space, color, and texture to create a final look.
c. The contractor shall provide a visual artist’s draft using photo specific references of the space to show the full layout of elements, colors, textures, lighting, etc.
d. The contractor shall asses and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc.
e. The contractor shall fabricate floating walls that create a three dimensional effect and layered aesthetic while simultaneously integrating walls into an overall cohesive design.
f. The contractor shall install LED lighting (backlighting) integrated into floating walls that create visual interest and align with the overall look and feel of the space. The contractor shall ensure the proper wiring and wire management of all electronic elements.
g. The contractor shall fabricate and install all visual aspects of mixed-media walls, including but not limited to, custom wallpaper or vinyl, hand-done painting, wood accents, veneers, stains or other specialty finishes. The contractor shall ensure the full design extends throughout floating walls while maintaining one cohesive look.
5.0 Contractor Responsibilities
a. Contractor is responsible for verifying all dimensions prior to bidding and installation.
b. The contractor will provide personnel who are certified to perform required tasks.
c. Contractor will be permitted to work inside of the Dining Facility during the following hours: Monday through Friday - 0730-1700 except during meal hours and holidays.
Meal Hours (No work permitted): Coordinate with the Installation FSO Breakfast 0600 - 0730 Lunch 1100 - 1230 Dinner 1600 - 1730
Night or weekend shift may be coordinated with Food Service Officer with no additional cost in pricing. Night shift is preferred if project involves loud noise and heavy dust to not interfere with patrons during meal hours and must be coordinated with the FSO. Exact days of work will be coordinated before commencement to ensure space availability. Coordinate with LCPO /FSO before commencing work to ensure serving line or each section is secured for work while utilizing different serving lines to serve the patrons. Immediate work area will be properly secured by the contractor and will not conflict with meals being served or dining area being utilized.
d. Contractor will provide plastic barriers to contain dust or paint.
e. Contractor is responsible for daily clean up and disposal of all generated debris/materials to proper disposal or recycle containers at the back dock.
f. Contractor is responsible to obtain necessary security pass for base access. The government will not provide escorts to and from the gate.
6.0 Period and Place of Performance & Contacts
Category Details
Period of Performance
25 September 2026 to 24 September 2027
Place of Performance
Naval Base Point Loma SUBASE, 140 Sylvester Rd Bldg 500, San Diego, CA 92106.
Primary POC TBD
Alternate POC TBD
WAWF Information and routing Data Table
Field Name in WAWF Data to be entered in WAWF Pay Official DoDACC N50082 Issue By DoDACC N00244 Admin DoDACC N00244 Inspect By DoDACC N63406 LPO DoDACC N00052 Acceptor DoDACC N00242 Acceptor E-mail address TBD
File details come from the government source that posted it. Updated .