Attachment 2-Material Handling Equipment PM Schedule.xlsx
XLSX spreadsheet 77 KB Posted
- Attached to
- Material Handling Equipment (MHE) Maintenance Services Federal contract opportunity
- Solicitation number
- N00244-25-R-S015
About this file
This Excel file is a detailed Preventive Maintenance (PM) Schedule for Material Handling Equipment (MHE) at Naval Base Ventura County, specifically covering locations in Port Hueneme and Point Mugu. The schedule encompasses 52 pieces of equipment including forklifts (electric, diesel, and propane), golf carts, sweepers, turret trucks, container handlers, and a tug, with various capacities ranging from 3K to 100K. Each equipment entry includes serial numbers, manufacturer details, current hours, maintenance frequencies, and specific service requirements such as 3 times per 120 days, annual steam cleaning, opacity testing, and calibration.
The maintenance schedule is part of a pre-solicitation (N00244-25-R-S015) for MHE Maintenance Services by NAVSUP Fleet Logistics Center, San Diego. The anticipated contract is a Firm Fixed Price (FFP) with a 12-month base period and four 12-month option periods. The total preventative maintenance budget is $121,296.26, with an additional $35,000 allocated for corrective maintenance. The solicitation targets small businesses under NAICS code 811310 with a size standard of $12.5 million. Interested parties are required to submit a 5-page Capability Statement by July 25, 2025, at 11:59 PM PST, with questions due by July 22, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice.pdf | ||
| Attachment 1- PWS MHE Maintenance.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MHE
| CLIN | USN | Serial Number | Type of Equipment | Manufacturer | Model | Capacity | Status | Installation Name, Bldg | Schedule | Freq | Opacity Test Due | Current Hours | Primary POC | Supervisor | Plate* |
| 0001 | 13-90645 | E108V18721A | Forklift (Electric) | YALE | ERC040 | 4K | Non-Op | Point Mugu Bldg. 65 | T | 3 T Year 120 Days | Non OP | Lee | |||
| 0002 | 13-90646 | E108V18722A | Forklift (Electric) | YALE | ERC040 | 4K | Non-Op | Point Mugu Bldg. 65 | T | 3 T Year 120 Days | Non OP | Lee | |||
| 0003 | 13-03240 | FGA08-1790-07907 | Forklift With Scale (Propane) | DOOSAN | G-25E-5 | 5K | Point Mugu Bldg. 65 | T, A*‡ | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Calibration) | 441 | Frederico Galindo | Lee | |||
| 0004 | 13-03242 | FGA08-1790-07908 | Forklift (Propane) | DOOSAN | G-25E-5 | 5K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 785 | Frederico Galindo | Lee | |||
| 0005 | 13-03243 | FGA08-1790-07906 | Forklift (Propane) | DOOSAN | G-25E-5 | 5K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 171 | Frederico Galindo | Lee | |||
| 0006 | 13-03194 | 68276 | Forklift (Propane) | TOYOTA | 8FGU32 | 6K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 528 | Frederico Galindo | Lee | |||
| 0007 | 13-19314 | FDC09-2300-00095 | Forklift (Diesel) | DOOSAN | D120S-7 | 23K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 79 | Frederico Galindo | Lee | |||
| 0008 | 13-19316 | FDC09-2300-00096 | Forklift (Diesel) | DOOSAN | D120S-7 | 23K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 30 | Frederico Galindo | Lee | |||
| 0009 | 13-03189 | 67295 | Forklift (Propane) | TOYOTA | 8FGU32 | 6K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 147 | Frederico Galindo | Lee | |||
| 0010 | 13-98023 | H177G55390C | Forklift (Propane) | HYSTER | S60XM | 6K | Point Mugu Bldg. 65 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2144 | Frederico Galindo | Lee | |||
| 0011 | 13-07002 | K007E01616L | Forklift (Diesel) | HYSTER | H230HD2 | 25K | Port Hueneme Bldg. 380 | T, A*† | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | 1-Apr-25 | 1691 | Carl Cates | Hill | ||
| 0012 | 20134557 | F187V24921L | Forklift (Propane) | HYSTER | S60FT | 6K | Port Hueneme Bldg. 380 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2430 | Arthur Hill Jr. | Hill | PH0615 | ||
| 0013 | 20133398 | K007E02395N | Forklift (Diesel) | HYSTER | H250HD2 | 20k | Port Hueneme Bldg. 380 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 348 | Arthur Hill Jr. | Hill | PH0616 | ||
| 0014 | 20149758 | 3810160100002 | Sweeper (Propane) | PROTERRA | 13300109 | Port Hueneme Bldg. 380 | T | 3 T Year 120 Days | 151 | Arthur Hill Jr. | Hill | PH1220 | |||
| 0015 | 20163107 | G006G05065E | Forklift (Diesel) | HYSTER | H155XL | 10k | Non-Op | Port Hueneme Bldg. 380 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | Non OP | Hill | 13-85660 | ||
| 0016 | 20199803 | 3510183400023 | Sweeper (Propane) | PROTERRA | 13300109 | Port Hueneme Bldg. 380 | T | 3 T Year 120 Days | 56 | Hill | 3510183400023 | ||||
| 0017 | 20199804 | 3510183100713 | Sweeper (Propane) | PROTERRA | 13300109 | Port Hueneme Bldg. 380 | T | 3 T Year 120 Days | 39 | Hill | 3510183100713 | ||||
| 0018 | 13-98021 | H177G55347C | Forklift (Propane) | HYSTER | H60XM | 6K | Port Hueneme Bldg. 380 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 1674 | Carl Cates | Hill | |||
| 0019 | 13-83051 | D187G27164Z | Forklift (Propane) | HYSTER | H60XMM | 6K | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 3860 | Carl Cates | Hill | |||
| 0020 | 13-90631 | H177G44253A | Forklift (Propane) | HYSTER | H40XM | 4K | Non-Op | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | Non OP | Carl Cates | Hill | ||
| 0021 | 13-04731 | E007G03160U | Forklift (Diesel) | HYSTER | H230XL | 20K | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 6852 | Carl Cates | Hill | |||
| 0022 | 13-03210 | P177V10482S | Forklift (Propane) | HYSTER | H70FT | 6K | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 552 | Carl Cates | Hill | |||
| 0023 | 13-98014 | D187G34153C | Forklift (Propane) | HYSTER | S40XMM | 4K | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2407 | Carl Cates | Hill | |||
| 0024 | 13-98013 | D187G34077C | Forklift (Propane) | HYSTER | S40XMM | 4K | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 4165 | Carl Cates | Hill | |||
| 0025 | 13-98024 | H177G55401C | Forklift (Propane) | HYSTER | H60XM | 6K | Port Hueneme Bldg. 381 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 1283 | Carl Cates | Hill | |||
| 0026 | 13-03241 | FGA08-1790-07909 | Forklift With Scale (Propane) | DOOSAN | G-25E-5 | 5K | Port Hueneme Bldg. 382 | T, A*‡ | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Calibration) | 218 | Adams | ||||
| 0027 | 18-09034 | B463T02324T | Turret Truck (Electric) | HYSTER | V30ZMU | 3K | Port Hueneme Bldg. 382 | T | 3 T Year 120 Days | 6 | Adams | ||||
| 0028 | 18-09033 | B463T02323T | Turret Truck (Electric) | HYSTER | V30ZMU | 3K | Port Hueneme Bldg. 382 | T | 3 T Year 120 Days | 13 | Adams | ||||
| 0029 | 20124558 | F187V24941L | Forklift (Propane) | HYSTER | H60FT | 6K | Port Hueneme Bldg. 475 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2628 | Hill | PH0611 | |||
| 0030 | 20124559 | F187V24942L | Forklift (Propane) | HYSTER | H60FT | 6K | Port Hueneme Bldg. 475 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2937 | Hill | PH0612 | |||
| 0031 | 20124560 | F187V24944L | Forklift (Propane) | HYSTER | H60FT | 6K | Port Hueneme Bldg. 475 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2811 | Hill | PH0613 | |||
| 0032 | 20149759 | 3810160100003 | Sweeper (Propane) | PROTERRA | 13300109 | Port Hueneme Bldg. 475 | T | 3 T Year 120 Days | 9211 | Hill | PH1219 | ||||
| 0033 | PH9002 | PG0212-130806 | Golf Cart (Gasoline) | CLUB CAR | Carryall 2 | Port Hueneme Bldg. 475 | T | 3 T Year 120 Days | 892 | Hill | PH9002 | ||||
| 0034 | 20124174 | F187V24920L | Forklift (Propane) | HYSTER | H60FT | 6K | Port Hueneme Bldg. 800 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 1495 | Lee | PH0614 | |||
| 0035 | 20127885 | 1V94B1113EC113356 | Golf Cart (Electric) | VANTAGE | EV 1000 | Non-Op | Port Hueneme Bldg. 800 | SA | 2 T Year 180 Days | Non OP | Lee | ||||
| 0036 | 20155758 | 201717 | Tug (Propane) | TAYLOR DUNN | TC40 | Port Hueneme Bldg. 800 | T | 3 T Year 120 Days | 167 | Kevin Hamilton | Lee | ||||
| 0037 | 20163211 | F187V23982L | Forklift (Propane) | HYSTER | S40F2 | 4k | Port Hueneme Bldg. 800 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2443 | Kevin Hamilton | Lee | PH0409 | ||
| 0038 | 20163212 | F187V23987L | Forklift (Propane) | HYSTER | S40FT | 4K | Port Hueneme Bldg. 801 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 2820 | Kevin Hamilton | Lee | PH0410 | ||
| 0039 | 20163213 | F187V23989L | Forklift (Propane) | HYSTER | S60FT | 6K | Port Hueneme Bldg. 801 | T, A* | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning) | 1824 | Kevin Hamilton | Lee | PH0610 | ||
| 0040 | 20203932 | B463T02266T | Turret Truck (Electric) | HYSTER | V30ZMU | 3K | Port Hueneme Bldg. 801 | T | 3 T Year 120 Days | 73 | Kevin Hamilton | Lee | |||
| 0041 | 20203975 | 540-16-C32558 | Turret Truck (Electric) | RAYMOND | 540-OPC30TT | 3K | Non-Op | Port Hueneme Bldg. 801 | T | 3 T Year 120 Days | Non OP | Kevin Hamilton | Lee | ||
| 0042 | PH9001 | A-29933 | Golf Cart (Gasoline) | EZGO | GXT-804 | Port Hueneme Bldg. 801 | T | 3 T Year 120 Days | 565 | Kevin Hamilton | Lee | PH9001 | |||
| 0043 | 13-03307 | E007G03983W | Forklift (Diesel) | HYSTER | H230XL | 15K | Port Hueneme Bldg. 803 | T, A*† | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | 1-Apr-25 | 6036 | Carl Cates | Hill | ||
| 0044 | 13-19389 | 31553 | Heavy Forklift (Diesel) | HOIST | PD 450 | 45K | Port Hueneme Bldg. 803 | EOM, A*† | 6 T Year 60 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | 1-Apr-25 | 348 | Carl Cates | Hill | ||
| 0045 | 13-19390 | 31554 | Heavy Forklift (Diesel) | HOIST | PD 450 | 45K | Port Hueneme Bldg. 803 | EOM, A*† | 6 T Year 60 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | 1-Apr-25 | 301 | Carl Cates | Hill | ||
| 0046 | 13-07003 | K007E01617L | Forklift (Diesel) | HYSTER | H230HD2 | 25K | Port Hueneme Bldg. 803 | T, A*† | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | 1-Apr-25 | 1782 | Carl Cates | Hill | ||
| 0047 | 13-19092 | G117E01601L | Container Handler (Diesel) | HYSTER | H1150HDCH | 100K | Port Hueneme Bldg. 803 | SA, A*† | 2 T Year 180 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | 1-Apr-25 | 1421 | Carl Cates | Hill |
Pivot
| USN | Preventative Maintenance | Sum of Cost Each | Sum of Invoice Amount |
| 13-03189 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $687.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-03189 Total | $1,064.50 | $0.00 | |
| 13-03194 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $687.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-03194 Total | $1,064.50 | $0.00 | |
| 13-03210 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-03210 Total | $1,031.50 | $0.00 | |
| 13-03240 | 1 T Year 365 (Calibration) | $315.00 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Calibration), 1 T Year 365 (Fork Inspection) | |||
| 13-03240 Total | $1,469.50 | $0.00 | |
| 13-03241 | 1 T Year 365 (Calibration) | $315.00 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Calibration), 1 T Year 365 (Fork Inspection) | |||
| 13-03241 Total | $1,469.50 | $0.00 | |
| 13-03242 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-03242 Total | $1,154.50 | $0.00 | |
| 13-03243 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-03243 Total | $1,154.50 | $0.00 | |
| 13-03307 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $1,716.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 13-03307 Total | $2,533.57 | $0.00 | |
| 13-04731 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $1,716.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 13-04731 Total | $2,533.57 | $0.00 | |
| 13-07002 | 1 T Year 365 (Opacity Test) | $980.70 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 13-07002 Total | $3,443.20 | $0.00 | |
| 13-07003 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 13-07003 Total | $2,902.57 | $0.00 | |
| 13-19092 | 1 T Year 365 (Opacity Test) | $1,434.00 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $477.00 | $0.00 | |
| 2 T Year 180 Days | $2,868.00 | $0.00 | |
| 2 T Year 180 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | |||
| 13-19092 Total | $4,779.00 | $0.00 | |
| 13-19314 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-19314 Total | $2,462.50 | $0.00 | |
| 13-19316 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-19316 Total | $2,462.50 | $0.00 | |
| 13-19389 | 1 T Year 365 (Opacity Test) | $1,172.00 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 6 T Year 60 Days | $7,032.00 | $0.00 | |
| 6 T Year 60 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 13-19389 Total | $8,581.50 | $0.00 | |
| 13-19390 | 1 T Year 365 (Opacity Test) | $1,172.00 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 6 T Year 60 Days | $7,032.00 | $0.00 | |
| 6 T Year 60 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 13-19390 Total | $8,581.50 | $0.00 | |
| 13-90645 | 3 T Year 120 Days | $756.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| 13-90645 Total | $756.00 | $0.00 | |
| 13-90646 | 3 T Year 120 Days | $756.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| 13-90646 Total | $756.00 | $0.00 | |
| 13-98021 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-98021 Total | $1,031.50 | $0.00 | |
| 13-98023 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-98023 Total | $1,031.50 | $0.00 | |
| 13-98024 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 13-98024 Total | $1,031.50 | $0.00 | |
| 18-09033 | 3 T Year 120 Days | $756.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| 18-09033 Total | $756.00 | $0.00 | |
| 18-09034 | 3 T Year 120 Days | $756.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| 18-09034 Total | $756.00 | $0.00 | |
| 20124174 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 20124174 Total | $1,031.50 | $0.00 | |
| 20127885 | 2 T Year 180 Days | $390.00 | $0.00 |
| 20127885 Total | $390.00 | $0.00 | |
| 20133398 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 20133398 Total | $2,462.50 | $0.00 | |
| 20149758 | 2 T Year 180 Days | $390.00 | $0.00 |
| 20149758 Total | $390.00 | $0.00 | |
| 20149759 | 2 T Year 180 Days | $390.00 | $0.00 |
| 20149759 Total | $390.00 | $0.00 | |
| 20155758 | 2 T Year 180 Days | $358.00 | $0.00 |
| 20155758 Total | $358.00 | $0.00 | |
| 20163107 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $1,017.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 20163107 Total | $1,394.50 | $0.00 | |
| 20163211 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 20163211 Total | $1,031.50 | $0.00 | |
| 20163212 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 20163212 Total | $1,031.50 | $0.00 | |
| 20163213 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $654.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 20163213 Total | $1,031.50 | $0.00 | |
| 20199803 | 2 T Year 180 Days | $390.00 | $0.00 |
| 20199803 Total | $390.00 | $0.00 | |
| 20199804 | 2 T Year 180 Days | $390.00 | $0.00 |
| 20199804 Total | $390.00 | $0.00 | |
| 20203932 | 3 T Year 120 Days | $756.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| 20203932 Total | $756.00 | $0.00 | |
| 20203975 | 3 T Year 120 Days | $756.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| 20203975 Total | $756.00 | $0.00 | |
| PH9001 | 2 T Year 180 Days | $318.00 | $0.00 |
| PH9001 Total | $318.00 | $0.00 | |
| PH9002 | 2 T Year 180 Days | $318.00 | $0.00 |
| PH9002 Total | $318.00 | $0.00 | |
| SD-0040 | 1 T Year 365 (Opacity Test) | $1,434.00 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $477.00 | $0.00 | |
| 2 T Year 180 Days | $2,868.00 | $0.00 | |
| 2 T Year 180 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | |||
| SD-0040 Total | $4,779.00 | $0.00 | |
| 1340-25042 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 1340-25042 Total | $2,902.57 | $0.00 | |
| 134063496 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $2,085.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| 134063496 Total | $2,902.57 | $0.00 | |
| SD-00041 | 3 T Year 120 Days | $777.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| SD-00041 Total | $777.00 | $0.00 | |
| SD-00042 | 3 T Year 120 Days | $777.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| SD-00042 Total | $777.00 | $0.00 | |
| SD-00043 | 3 T Year 120 Days | $777.00 | $0.00 |
| 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | |||
| SD-00043 Total | $777.00 | $0.00 | |
| 1330-25017 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $665.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 1330-25017 Total | $1,042.50 | $0.00 | |
| 1330-25026 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| 1330-25026 Total | $1,154.50 | $0.00 | |
| SD-00021 | 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | |||
| SD-00021 Total | $1,154.50 | $0.00 | |
| SD-00022 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| SD-00022 Total | $1,594.57 | $0.00 | |
| SD133021610 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| SD133021610 Total | $1,594.57 | $0.00 | |
| SD133021611 | 1 T Year 365 (Opacity Test) | $440.07 | $0.00 |
| 1 T Year 365 (Steam Cleaning) | $377.50 | $0.00 | |
| 3 T Year 120 Days | $777.00 | $0.00 | |
| 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | |||
| SD133021611 Total | $1,594.57 | $0.00 | |
| Other | Corrective Maintenance Budget | $35,000.00 | |
| Other Total | $35,000.00 | ||
| Grand Total | $121,296.26 | $0.00 |
MHE Schedule
| Filter | CLIN | USN | ERP Asset | Serial Number | Type of Equipment | Manufacturer | Model | Capacity | Status | Installation Name, Bldg | Schedule | Preventative Maintenance | Start Date | Due Date | Date Completed | Cost Each | Invoice Amount | Cost Each Sub-Total | Invoice Amount Sub-Total | Current Hours | Primary POC | Supervisor | Plate* | Location | Bldg. |
| Yes | 0001-00 | 20127885 | 875070 | 1V94B1113EC113356 | Golf Cart (Electric) | Vantage | EV 1000 | N/A | 0 | Port Hueneme, Bldg. 800 | SA | 2 T Year 180 Days | $390.00 | $0.00 | 0 | Kevin Hamilton | Leslie Lee | 20127885 | Port Hueneme | 800 | |||||
| 0001-01 | 20127885 | 875070 | 1V94B1113EC113356 | Golf Cart (Electric) | Vantage | EV 1000 | N/A | 0 | Port Hueneme, Bldg. 800 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $195.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20127885 | Port Hueneme | 800 | |||||
| 0001-02 | 20127885 | 875070 | 1V94B1113EC113356 | Golf Cart (Electric) | Vantage | EV 1000 | N/A | 0 | Port Hueneme, Bldg. 800 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $195.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20127885 | Port Hueneme | 800 | |||||
| 0002-00 | 20149758 | 875072 | 3810160100002 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 380 | SA | 2 T Year 180 Days | $390.00 | $0.00 | 168.19 | Marilyn Arellano | Leslie Lee | 20149758 | Port Hueneme | 380 | ||||||
| Yes | 0002-01 | 20149758 | 875072 | 3810160100002 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 380 | SA | 2 T Year 180 Days | 10/1/25 | 46112.00 | $195.00 | $0.00 | Marilyn Arellano | Leslie Lee | 20149758 | Port Hueneme | 380 | ||||
| 0002-02 | 20149758 | 875072 | 3810160100002 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 380 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $195.00 | $0.00 | Marilyn Arellano | Leslie Lee | 20149758 | Port Hueneme | 380 | |||||
| 0003-00 | 20149759 | 875076 | 3810160100003 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 475 | SA | 2 T Year 180 Days | $390.00 | $0.00 | 92.11 | Ronald Ford | Arthur Hill | 20149759 | Port Hueneme | 475 | ||||||
| 0003-01 | 20149759 | 875076 | 3810160100003 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 475 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $195.00 | $0.00 | Ronald Ford | Arthur Hill | 20149759 | Port Hueneme | 475 | |||||
| Yes | 0003-02 | 20149759 | 875076 | 3810160100003 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 475 | SA | 2 T Year 180 Days | 4/1/26 | 46295.00 | $195.00 | $0.00 | Ronald Ford | Arthur Hill | 20149759 | Port Hueneme | 475 | ||||
| 0004-00 | 20155758 | 875080 | 201717 | Tug (Propane) | Taylor Dunn | TC40 | N/A | 0 | Port Hueneme, Bldg. 801 | SA | 2 T Year 180 Days | $358.00 | $0.00 | 184.1 | Kevin Hamilton | Leslie Lee | 20155758 | Port Hueneme | 801 | ||||||
| 0004-01 | 20155758 | 875080 | 201717 | Tug (Propane) | Taylor Dunn | TC40 | N/A | 0 | Port Hueneme, Bldg. 801 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $179.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20155758 | Port Hueneme | 801 | |||||
| 0004-02 | 20155758 | 875080 | 201717 | Tug (Propane) | Taylor Dunn | TC40 | N/A | 0 | Port Hueneme, Bldg. 801 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $179.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20155758 | Port Hueneme | 801 | |||||
| 0005-00 | 20199803 | 875092 | 3510183400023 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Point Mugu, Bldg. 65 | SA | 2 T Year 180 Days | $390.00 | $0.00 | 62.68 | Daniel Deutinger | Arthur Hill | 20199803 | Point Mugu | 65 | ||||||
| 0005-01 | 20199803 | 875092 | 3510183400023 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Point Mugu, Bldg. 65 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $195.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20199803 | Point Mugu | 65 | |||||
| Yes | 0005-02 | 20199803 | 875092 | 3510183400023 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Point Mugu, Bldg. 65 | SA | 2 T Year 180 Days | 4/1/26 | 46295.00 | $195.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20199803 | Point Mugu | 65 | ||||
| 0006-00 | 20199804 | 875093 | 3510183100713 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 380 | SA | 2 T Year 180 Days | $390.00 | $0.00 | 92.62 | Daniel Deutinger | Arthur Hill | 20199804 | Port Hueneme | 380 | ||||||
| 0006-01 | 20199804 | 875093 | 3510183100713 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 380 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $195.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20199804 | Port Hueneme | 380 | |||||
| 0006-02 | 20199804 | 875093 | 3510183100713 | Sweeper (Propane) | Proterra | 13300109 | N/A | UP | Port Hueneme, Bldg. 380 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $195.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20199804 | Port Hueneme | 380 | |||||
| 0007-00 | PH9001 | 921342 | A-29933 | Golf Cart (Gasoline) | Ezgo | GXT-804 | N/A | 0 | Port Hueneme, Bldg. 801 | SA | 2 T Year 180 Days | $318.00 | $0.00 | 565 | Kevin Hamilton | Leslie Lee | PH9001 | Port Hueneme | 801 | ||||||
| Yes | 0007-01 | PH9001 | 921342 | A-29933 | Golf Cart (Gasoline) | Ezgo | GXT-804 | N/A | 0 | Port Hueneme, Bldg. 801 | SA | 2 T Year 180 Days | 10/1/25 | 46112.00 | $159.00 | $0.00 | Kevin Hamilton | Leslie Lee | PH9001 | Port Hueneme | 801 | ||||
| 0007-02 | PH9001 | 921342 | A-29933 | Golf Cart (Gasoline) | Ezgo | GXT-804 | N/A | 0 | Port Hueneme, Bldg. 801 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $159.00 | $0.00 | Kevin Hamilton | Leslie Lee | PH9001 | Port Hueneme | 801 | |||||
| 0008-00 | PH9002 | 921368 | PG0212-130806 | Golf Cart (Gasoline) | Club Car | CARRYALL 2 | N/A | UP | Port Hueneme, Bldg. 477 | SA | 2 T Year 180 Days | $318.00 | $0.00 | 9030 | Ronald Ford | Arthur Hill | PH9002 | Port Hueneme | 477 | ||||||
| 0008-01 | PH9002 | 921368 | PG0212-130806 | Golf Cart (Gasoline) | Club Car | CARRYALL 2 | N/A | UP | Port Hueneme, Bldg. 477 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $159.00 | $0.00 | Ronald Ford | Arthur Hill | PH9002 | Port Hueneme | 477 | |||||
| 0008-02 | PH9002 | 921368 | PG0212-130806 | Golf Cart (Gasoline) | Club Car | CARRYALL 2 | N/A | UP | Port Hueneme, Bldg. 477 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $159.00 | $0.00 | Ronald Ford | Arthur Hill | PH9002 | Port Hueneme | 477 | |||||
| Yes | 0009-00 | 13-19092 | 810969 | G117E01601L | Container Handler (Diesel) | Hyster | H1150HDCH | 100K | UP | Port Hueneme, Bldg. 803 | SA, A*† | 2 T Year 180 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | $4,779.00 | $0.00 | 1592 | Carl Cates | Arthur Hill | 134019092 | Port Hueneme | 803 | |||||
| 0009-01 | 13-19092 | 810969 | G117E01601L | Container Handler (Diesel) | Hyster | H1150HDCH | 100K | UP | Port Hueneme, Bldg. 803 | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $1,434.00 | $0.00 | Carl Cates | Arthur Hill | 134019092 | Port Hueneme | 803 | |||||
| 0009-02 | 13-19092 | 810969 | G117E01601L | Container Handler (Diesel) | Hyster | H1150HDCH | 100K | UP | Port Hueneme, Bldg. 803 | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $1,434.00 | $0.00 | Carl Cates | Arthur Hill | 134019092 | Port Hueneme | 803 | |||||
| 0009-03 | 13-19092 | 810969 | G117E01601L | Container Handler (Diesel) | Hyster | H1150HDCH | 100K | UP | Port Hueneme, Bldg. 803 | A† | 1 T Year 365 (Opacity Test) | 3/1/26 | 4/1/26 | $1,434.00 | $0.00 | Carl Cates | Arthur Hill | 134019092 | Port Hueneme | 803 | |||||
| 0009-04 | 13-19092 | 810969 | G117E01601L | Container Handler (Diesel) | Hyster | H1150HDCH | 100K | UP | Port Hueneme, Bldg. 803 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $477.00 | $0.00 | Carl Cates | Arthur Hill | 134019092 | Port Hueneme | 803 | |||||
| Yes | 0010-00 | SD-0040 | TBD | 0 | Container Handler (Diesel) | Hyster | RS46-29HD/62 | 0 | Port Hueneme, Bldg. TBD | SA, A*† | 2 T Year 180 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test) | $4,779.00 | $0.00 | 0 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0010-01 | SD-0040 | TBD | 0 | Container Handler (Diesel) | Hyster | RS46-29HD/62 | 0 | Port Hueneme, Bldg. TBD | SA | 2 T Year 180 Days | 10/1/25 | 3/31/26 | $1,434.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0010-02 | SD-0040 | TBD | 0 | Container Handler (Diesel) | Hyster | RS46-29HD/62 | 0 | Port Hueneme, Bldg. TBD | SA | 2 T Year 180 Days | 4/1/26 | 9/30/26 | $1,434.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0010-03 | SD-0040 | TBD | 0 | Container Handler (Diesel) | Hyster | RS46-29HD/62 | 0 | Port Hueneme, Bldg. TBD | A† | 1 T Year 365 (Opacity Test) | 3/1/26 | 4/1/26 | $1,434.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0010-04 | SD-0040 | TBD | 0 | Container Handler (Diesel) | Hyster | RS46-29HD/62 | 0 | Port Hueneme, Bldg. TBD | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $477.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| Yes | 0011-00 | 1340-25042 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T, A*†# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | $2,902.57 | $0.00 | 0 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0011-01 | 1340-25042 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $695.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0011-02 | 1340-25042 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $695.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0011-03 | 1340-25042 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $695.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0011-04 | 1340-25042 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | A† | 1 T Year 365 (Opacity Test) | 3/1/26 | 4/1/26 | $440.07 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| Yes | 0011-05 | 1340-25042 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 46295.00 | $377.50 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | |||||
| 0012-00 | 134063496 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T, A*†# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Opacity Test), 1 T Year 365 (Fork Inspection) | $2,902.57 | $0.00 | 0 | 0 | 0 | SD0040 | Port Hueneme | TBD | |||||||
| 0012-01 | 134063496 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $695.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0012-02 | 134063496 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $695.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0012-03 | 134063496 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $695.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| Yes | 0012-04 | 134063496 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | A† | 1 T Year 365 (Opacity Test) | 3/1/26 | 46113.00 | $440.07 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | |||||
| 0012-05 | 134063496 | TBD | 0 | Forklift (Diesel) | Doosan | D80S-9 | 17K | Port Hueneme, Bldg. TBD | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0013-00 | 18-09033 | 805928 | B463T02323T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | UP | Port Hueneme, Bldg. 382 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $756.00 | $0.00 | 14 | Vincent Guadagno | Leslie Lee | 189009033 | Port Hueneme | 382 | ||||||
| 0013-01 | 18-09033 | 805928 | B463T02323T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | UP | Port Hueneme, Bldg. 382 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $252.00 | $0.00 | Vincent Guadagno | Leslie Lee | 189009033 | Port Hueneme | 382 | |||||
| 0013-02 | 18-09033 | 805928 | B463T02323T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | UP | Port Hueneme, Bldg. 382 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $252.00 | $0.00 | Vincent Guadagno | Leslie Lee | 189009033 | Port Hueneme | 382 | |||||
| Yes | 0013-03 | 18-09033 | 805928 | B463T02323T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | UP | Port Hueneme, Bldg. 382 | T | 3 T Year 120 Days | 6/1/26 | 46295.00 | $252.00 | $0.00 | Vincent Guadagno | Leslie Lee | 189009033 | Port Hueneme | 382 | ||||
| 0014-00 | 18-09034 | 805929 | B463T02324T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | NON-OP | Port Hueneme, Bldg. 382 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $756.00 | $0.00 | 16 | Vincent Guadagno | Leslie Lee | 189009034 | Port Hueneme | 382 | ||||||
| 0014-01 | 18-09034 | 805929 | B463T02324T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | NON-OP | Port Hueneme, Bldg. 382 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $252.00 | $0.00 | Vincent Guadagno | Leslie Lee | 189009034 | Port Hueneme | 382 | |||||
| 0014-02 | 18-09034 | 805929 | B463T02324T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | NON-OP | Port Hueneme, Bldg. 382 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $252.00 | $0.00 | Vincent Guadagno | Leslie Lee | 189009034 | Port Hueneme | 382 | |||||
| 0014-03 | 18-09034 | 805929 | B463T02324T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | NON-OP | Port Hueneme, Bldg. 382 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $252.00 | $0.00 | Vincent Guadagno | Leslie Lee | 189009034 | Port Hueneme | 382 | |||||
| 0015-00 | 13-90646 | 809460 | E108V18722A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $756.00 | $0.00 | 0 | Marilyn Arellano | Leslie Lee | 137090646 | Point Mugu | 65 | ||||||
| Yes | 0015-01 | 13-90646 | 809460 | E108V18722A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 46053.00 | $252.00 | $0.00 | Marilyn Arellano | Leslie Lee | 137090646 | Point Mugu | 65 | ||||
| 0015-02 | 13-90646 | 809460 | E108V18722A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $252.00 | $0.00 | Marilyn Arellano | Leslie Lee | 137090646 | Point Mugu | 65 | |||||
| 0015-03 | 13-90646 | 809460 | E108V18722A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $252.00 | $0.00 | Marilyn Arellano | Leslie Lee | 137090646 | Point Mugu | 65 | |||||
| 0016-00 | 13-90645 | 809462 | E108V18721A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $756.00 | $0.00 | 0 | Marilyn Arellano | Leslie Lee | 137090645 | Point Mugu | 65 | ||||||
| 0016-01 | 13-90645 | 809462 | E108V18721A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $252.00 | $0.00 | Marilyn Arellano | Leslie Lee | 137090645 | Point Mugu | 65 | |||||
| Yes | 0016-02 | 13-90645 | 809462 | E108V18721A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 46173.00 | $252.00 | $0.00 | Marilyn Arellano | Leslie Lee | 137090645 | Point Mugu | 65 | ||||
| 0016-03 | 13-90645 | 809462 | E108V18721A | Forklift (Electric) | Yale | ERC040 | 4K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $252.00 | $0.00 | Marilyn Arellano | Leslie Lee | 137090645 | Point Mugu | 65 | |||||
| 0017-00 | 20203932 | 875094 | B463T02266T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | 0 | Port Hueneme, Bldg. 801 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $756.00 | $0.00 | 73 | Kevin Hamilton | Leslie Lee | 20203932 | Port Hueneme | 801 | ||||||
| 0017-01 | 20203932 | 875094 | B463T02266T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $252.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20203932 | Port Hueneme | 801 | |||||
| 0017-02 | 20203932 | 875094 | B463T02266T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $252.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20203932 | Port Hueneme | 801 | |||||
| Yes | 0017-03 | 20203932 | 875094 | B463T02266T | Turret Forklift (Electric) | Hyster | V30ZMU | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 6/1/26 | 46295.00 | $252.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20203932 | Port Hueneme | 801 | ||||
| 0018-00 | 20203975 | 875095 | 540-16-C32558 | Turret Forklift (Electric) | Raymond | 540-OPC30TT | 3K | 0 | Port Hueneme, Bldg. 801 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $756.00 | $0.00 | 0 | Kevin Hamilton | Leslie Lee | 20203975 | Port Hueneme | 801 | ||||||
| 0018-01 | 20203975 | 875095 | 540-16-C32558 | Turret Forklift (Electric) | Raymond | 540-OPC30TT | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $252.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20203975 | Port Hueneme | 801 | |||||
| 0018-02 | 20203975 | 875095 | 540-16-C32558 | Turret Forklift (Electric) | Raymond | 540-OPC30TT | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $252.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20203975 | Port Hueneme | 801 | |||||
| Yes | 0018-03 | 20203975 | 875095 | 540-16-C32558 | Turret Forklift (Electric) | Raymond | 540-OPC30TT | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 6/1/26 | 46295.00 | $252.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20203975 | Port Hueneme | 801 | ||||
| 0019-00 | SD-00041 | 934698 | FOA01-5052-00514 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | UP | Point Mugu, Bldg. 65 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $777.00 | $0.00 | 0.6 | Marilyn Arellano | Leslie Lee | SD00041 | Point Mugu | 65 | ||||||
| 0019-01 | SD-00041 | 934698 | FOA01-5052-00514 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | SD00041 | Point Mugu | 65 | |||||
| 0019-02 | SD-00041 | 934698 | FOA01-5052-00514 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | SD00041 | Point Mugu | 65 | |||||
| 0019-03 | SD-00041 | 934698 | FOA01-5052-00514 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | SD00041 | Point Mugu | 65 | |||||
| Yes | 0020-00 | SD-00042 | 934699 | FOA01-5052-00515 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $777.00 | $0.00 | 1.1 | Kevin Hamilton | Leslie Lee | SD00042 | Port Hueneme | 801 | |||||
| 0020-01 | SD-00042 | 934699 | FOA01-5052-00515 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $259.00 | $0.00 | Kevin Hamilton | Leslie Lee | SD00042 | Port Hueneme | 801 | |||||
| 0020-02 | SD-00042 | 934699 | FOA01-5052-00515 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $259.00 | $0.00 | Kevin Hamilton | Leslie Lee | SD00042 | Port Hueneme | 801 | |||||
| 0020-03 | SD-00042 | 934699 | FOA01-5052-00515 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $259.00 | $0.00 | Kevin Hamilton | Leslie Lee | SD00042 | Port Hueneme | 801 | |||||
| Yes | 0021-00 | SD-00043 | 934701 | FOA01-5052-00516 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T# | 3 T Year 120 Days, 1 T Year 365 (Fork Inspection) | $777.00 | $0.00 | 0.9 | Kevin Hamilton | Leslie Lee | SD00043 | Port Hueneme | 801 | |||||
| 0021-01 | SD-00043 | 934701 | FOA01-5052-00516 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $259.00 | $0.00 | Kevin Hamilton | Leslie Lee | SD00043 | Port Hueneme | 801 | |||||
| 0021-02 | SD-00043 | 934701 | FOA01-5052-00516 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $259.00 | $0.00 | Kevin Hamilton | Leslie Lee | SD00043 | Port Hueneme | 801 | |||||
| 0021-03 | SD-00043 | 934701 | FOA01-5052-00516 | Turret Forklift (Electric) | Doosan | BOP 15S-9 | 3K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $259.00 | $0.00 | Kevin Hamilton | Leslie Lee | SD00043 | Port Hueneme | 801 | |||||
| Yes | 0022-00 | 1330-25017 | TBD | 0 | Forklift (Diesel) | Doosan | H70A | 7K | Port Hueneme, Bldg. TBD | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,042.50 | $0.00 | 0 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0022-01 | 1330-25017 | TBD | 0 | Forklift (Diesel) | Doosan | H70A | 7K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $218.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0022-02 | 1330-25017 | TBD | 0 | Forklift (Diesel) | Doosan | H70A | 7K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $218.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0022-03 | 1330-25017 | TBD | 0 | Forklift (Diesel) | Doosan | H70A | 7K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $229.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0022-04 | 1330-25017 | TBD | 0 | Forklift (Diesel) | Doosan | H70A | 7K | Port Hueneme, Bldg. TBD | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| Yes | 0023-00 | 1330-25026 | TBD | 0 | Forklift (Diesel) | Doosan | D25S-9 | 5K | Port Hueneme, Bldg. TBD | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,154.50 | $0.00 | 0 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0023-01 | 1330-25026 | TBD | 0 | Forklift (Diesel) | Doosan | D25S-9 | 5K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $259.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0023-02 | 1330-25026 | TBD | 0 | Forklift (Diesel) | Doosan | D25S-9 | 5K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $259.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0023-03 | 1330-25026 | TBD | 0 | Forklift (Diesel) | Doosan | D25S-9 | 5K | Port Hueneme, Bldg. TBD | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $259.00 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| 0023-04 | 1330-25026 | TBD | 0 | Forklift (Diesel) | Doosan | D25S-9 | 5K | Port Hueneme, Bldg. TBD | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | 0 | 0 | SD0040 | Port Hueneme | TBD | ||||||
| Yes | 0024-00 | 13-03210 | 805915 | P177V10482S | Forklift (Propane) | Hyster | H70FT | 7K | UP | Port Hueneme, Bldg. 380 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,031.50 | $0.00 | 641 | Carl Cates | Arthur Hill | 130503210 | Port Hueneme | 380 | |||||
| 0024-01 | 13-03210 | 805915 | P177V10482S | Forklift (Propane) | Hyster | H70FT | 7K | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $218.00 | $0.00 | Carl Cates | Arthur Hill | 130503210 | Port Hueneme | 380 | |||||
| 0024-02 | 13-03210 | 805915 | P177V10482S | Forklift (Propane) | Hyster | H70FT | 7K | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $218.00 | $0.00 | Carl Cates | Arthur Hill | 130503210 | Port Hueneme | 380 | |||||
| 0024-03 | 13-03210 | 805915 | P177V10482S | Forklift (Propane) | Hyster | H70FT | 7K | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $218.00 | $0.00 | Carl Cates | Arthur Hill | 130503210 | Port Hueneme | 380 | |||||
| 0024-04 | 13-03210 | 805915 | P177V10482S | Forklift (Propane) | Hyster | H70FT | 7K | UP | Port Hueneme, Bldg. 380 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Carl Cates | Arthur Hill | 130503210 | Port Hueneme | 380 | |||||
| Yes | 0025-00 | 13-03194 | 811085 | 68276 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,064.50 | $0.00 | 556.1 | Marilyn Arellano | Leslie Lee | 130503194 | Point Mugu | 65 | |||||
| 0025-01 | 13-03194 | 811085 | 68276 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $229.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503194 | Point Mugu | 65 | |||||
| 0025-02 | 13-03194 | 811085 | 68276 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $229.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503194 | Point Mugu | 65 | |||||
| 0025-03 | 13-03194 | 811085 | 68276 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $229.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503194 | Point Mugu | 65 | |||||
| 0025-04 | 13-03194 | 811085 | 68276 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Marilyn Arellano | Leslie Lee | 130503194 | Point Mugu | 65 | |||||
| Yes | 0026-00 | 13-19314 | 865203 | FDC09-2300-00095 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $2,462.50 | $0.00 | 105.4 | Marilyn Arellano | Leslie Lee | 134019314 | Point Mugu | 6-61 | |||||
| 0026-01 | 13-19314 | 865203 | FDC09-2300-00095 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $695.00 | $0.00 | Marilyn Arellano | Leslie Lee | 134019314 | Point Mugu | 6-61 | |||||
| 0026-02 | 13-19314 | 865203 | FDC09-2300-00095 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $695.00 | $0.00 | Marilyn Arellano | Leslie Lee | 134019314 | Point Mugu | 6-61 | |||||
| 0026-03 | 13-19314 | 865203 | FDC09-2300-00095 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $695.00 | $0.00 | Marilyn Arellano | Leslie Lee | 134019314 | Point Mugu | 6-61 | |||||
| 0026-04 | 13-19314 | 865203 | FDC09-2300-00095 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Marilyn Arellano | Leslie Lee | 134019314 | Point Mugu | 6-61 | |||||
| Yes | 0027-00 | 13-19316 | 865204 | FDC09-2300-00096 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $2,462.50 | $0.00 | 41.3 | Marilyn Arellano | Leslie Lee | 134019316 | Point Mugu | 6-61 | |||||
| 0027-01 | 13-19316 | 865204 | FDC09-2300-00096 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $695.00 | $0.00 | Marilyn Arellano | Leslie Lee | 134019316 | Point Mugu | 6-61 | |||||
| 0027-02 | 13-19316 | 865204 | FDC09-2300-00096 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $695.00 | $0.00 | Marilyn Arellano | Leslie Lee | 134019316 | Point Mugu | 6-61 | |||||
| 0027-03 | 13-19316 | 865204 | FDC09-2300-00096 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $695.00 | $0.00 | Marilyn Arellano | Leslie Lee | 134019316 | Point Mugu | 6-61 | |||||
| 0027-04 | 13-19316 | 865204 | FDC09-2300-00096 | Forklift (Diesel) | Doosan | D120S-7 | 23K | NON-OP | Point Mugu, Bldg. 6-61 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Marilyn Arellano | Leslie Lee | 134019316 | Point Mugu | 6-61 | |||||
| Yes | 0028-00 | 13-03242 | 865432 | FGA08-1790-07908 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,154.50 | $0.00 | 1043.9 | Marilyn Arellano | Leslie Lee | 130503242 | Point Mugu | 65 | |||||
| 0028-01 | 13-03242 | 865432 | FGA08-1790-07908 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503242 | Point Mugu | 65 | |||||
| 0028-02 | 13-03242 | 865432 | FGA08-1790-07908 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503242 | Point Mugu | 65 | |||||
| 0028-03 | 13-03242 | 865432 | FGA08-1790-07908 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503242 | Point Mugu | 65 | |||||
| 0028-04 | 13-03242 | 865432 | FGA08-1790-07908 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Marilyn Arellano | Leslie Lee | 130503242 | Point Mugu | 65 | |||||
| Yes | 0029-00 | 13-03243 | 865433 | FGA08-1790-07906 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,154.50 | $0.00 | 230.2 | Marilyn Arellano | Leslie Lee | 130503243 | Point Mugu | 65 | |||||
| 0029-01 | 13-03243 | 865433 | FGA08-1790-07906 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503243 | Point Mugu | 65 | |||||
| 0029-02 | 13-03243 | 865433 | FGA08-1790-07906 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503243 | Point Mugu | 65 | |||||
| 0029-03 | 13-03243 | 865433 | FGA08-1790-07906 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $259.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503243 | Point Mugu | 65 | |||||
| 0029-04 | 13-03243 | 865433 | FGA08-1790-07906 | Forklift (Propane) | Doosan | G-25E-5 | 5K | UP | Point Mugu, Bldg. 65 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Marilyn Arellano | Leslie Lee | 130503243 | Point Mugu | 65 | |||||
| Yes | 0030-00 | 13-03189 | 873594 | 67295 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,064.50 | $0.00 | 427.3 | Marilyn Arellano | Leslie Lee | 130503189 | Point Mugu | 65 | |||||
| 0030-01 | 13-03189 | 873594 | 67295 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $229.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503189 | Point Mugu | 65 | |||||
| 0030-02 | 13-03189 | 873594 | 67295 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $229.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503189 | Point Mugu | 65 | |||||
| 0030-03 | 13-03189 | 873594 | 67295 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $229.00 | $0.00 | Marilyn Arellano | Leslie Lee | 130503189 | Point Mugu | 65 | |||||
| 0030-04 | 13-03189 | 873594 | 67295 | Forklift (Propane) | Toyota | 8FGU32 | 6K | NON-OP | Point Mugu, Bldg. 65 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Marilyn Arellano | Leslie Lee | 130503189 | Point Mugu | 65 | |||||
| 0031-00 | 20133398 | 875064 | K007E02395N | Forklift (Diesel) | Hyster | H250HD2 | 25K | UP | Port Hueneme, Bldg. 380 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $2,462.50 | $0.00 | 490 | Daniel Deutinger | Arthur Hill | 20133398 | Port Hueneme | 380 | ||||||
| Yes | 0031-01 | 20133398 | 875064 | K007E02395N | Forklift (Diesel) | Hyster | H250HD2 | 25K | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 10/1/25 | 46053.00 | $695.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20133398 | Port Hueneme | 380 | ||||
| 0031-02 | 20133398 | 875064 | K007E02395N | Forklift (Diesel) | Hyster | H250HD2 | 25K | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $695.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20133398 | Port Hueneme | 380 | |||||
| 0031-03 | 20133398 | 875064 | K007E02395N | Forklift (Diesel) | Hyster | H250HD2 | 25K | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $695.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20133398 | Port Hueneme | 380 | |||||
| 0031-04 | 20133398 | 875064 | K007E02395N | Forklift (Diesel) | Hyster | H250HD2 | 25K | UP | Port Hueneme, Bldg. 380 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 9/30/26 | $377.50 | $0.00 | Daniel Deutinger | Arthur Hill | 20133398 | Port Hueneme | 380 | |||||
| Yes | 0032-00 | 20124174 | 875069 | F187V24920L | Forklift (Propane) | Hyster | H60FT | 6K | 0 | Port Hueneme, Bldg. 801 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,031.50 | $0.00 | 1544 | Kevin Hamilton | Leslie Lee | 20124174 | Port Hueneme | 801 | |||||
| 0032-01 | 20124174 | 875069 | F187V24920L | Forklift (Propane) | Hyster | H60FT | 6K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20124174 | Port Hueneme | 801 | |||||
| 0032-02 | 20124174 | 875069 | F187V24920L | Forklift (Propane) | Hyster | H60FT | 6K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20124174 | Port Hueneme | 801 | |||||
| 0032-03 | 20124174 | 875069 | F187V24920L | Forklift (Propane) | Hyster | H60FT | 6K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20124174 | Port Hueneme | 801 | |||||
| Yes | 0032-04 | 20124174 | 875069 | F187V24920L | Forklift (Propane) | Hyster | H60FT | 6K | 0 | Port Hueneme, Bldg. 801 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 46295.00 | $377.50 | $0.00 | Kevin Hamilton | Leslie Lee | 20124174 | Port Hueneme | 801 | ||||
| 0033-00 | 20163107 | 875083 | G006G05065E | Forklift (Diesel) | Hyster | H155XL | 10k | UP | Port Hueneme, Bldg. 380 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,394.50 | $0.00 | 1124.7 | Daniel Deutinger | Arthur Hill | 20163107 | Port Hueneme | 380 | ||||||
| 0033-01 | 20163107 | 875083 | G006G05065E | Forklift (Diesel) | Hyster | H155XL | 10k | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $339.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20163107 | Port Hueneme | 380 | |||||
| 0033-02 | 20163107 | 875083 | G006G05065E | Forklift (Diesel) | Hyster | H155XL | 10k | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $339.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20163107 | Port Hueneme | 380 | |||||
| 0033-03 | 20163107 | 875083 | G006G05065E | Forklift (Diesel) | Hyster | H155XL | 10k | UP | Port Hueneme, Bldg. 380 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $339.00 | $0.00 | Daniel Deutinger | Arthur Hill | 20163107 | Port Hueneme | 380 | |||||
| Yes | 0033-04 | 20163107 | 875083 | G006G05065E | Forklift (Diesel) | Hyster | H155XL | 10k | UP | Port Hueneme, Bldg. 380 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 46295.00 | $377.50 | $0.00 | Daniel Deutinger | Arthur Hill | 20163107 | Port Hueneme | 380 | ||||
| 0034-00 | 20163211 | 875084 | F187V23982L | Forklift (Propane) | Hyster | S40F2 | 4k | 0 | Port Hueneme, Bldg. 800 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,031.50 | $0.00 | 2551 | Kevin Hamilton | Leslie Lee | 20163211 | Port Hueneme | 800 | ||||||
| 0034-01 | 20163211 | 875084 | F187V23982L | Forklift (Propane) | Hyster | S40F2 | 4k | 0 | Port Hueneme, Bldg. 800 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20163211 | Port Hueneme | 800 | |||||
| 0034-02 | 20163211 | 875084 | F187V23982L | Forklift (Propane) | Hyster | S40F2 | 4k | 0 | Port Hueneme, Bldg. 800 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20163211 | Port Hueneme | 800 | |||||
| 0034-03 | 20163211 | 875084 | F187V23982L | Forklift (Propane) | Hyster | S40F2 | 4k | 0 | Port Hueneme, Bldg. 800 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20163211 | Port Hueneme | 800 | |||||
| Yes | 0034-04 | 20163211 | 875084 | F187V23982L | Forklift (Propane) | Hyster | S40F2 | 4k | 0 | Port Hueneme, Bldg. 800 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 46295.00 | $377.50 | $0.00 | Kevin Hamilton | Leslie Lee | 20163211 | Port Hueneme | 800 | ||||
| 0035-00 | 20163212 | 875085 | F187V23987L | Forklift (Propane) | Hyster | S40FT | 4K | 0 | Port Hueneme, Bldg. 801 | T, A*# | 3 T Year 120 Days, 1 T Year 365 (Steam Cleaning), 1 T Year 365 (Fork Inspection) | $1,031.50 | $0.00 | 2961 | Kevin Hamilton | Leslie Lee | 20163212 | Port Hueneme | 801 | ||||||
| 0035-01 | 20163212 | 875085 | F187V23987L | Forklift (Propane) | Hyster | S40FT | 4K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 10/1/25 | 1/31/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20163212 | Port Hueneme | 801 | |||||
| 0035-02 | 20163212 | 875085 | F187V23987L | Forklift (Propane) | Hyster | S40FT | 4K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 2/1/26 | 5/31/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20163212 | Port Hueneme | 801 | |||||
| 0035-03 | 20163212 | 875085 | F187V23987L | Forklift (Propane) | Hyster | S40FT | 4K | 0 | Port Hueneme, Bldg. 801 | T | 3 T Year 120 Days | 6/1/26 | 9/30/26 | $218.00 | $0.00 | Kevin Hamilton | Leslie Lee | 20163212 | Port Hueneme | 801 | |||||
| Yes | 0035-04 | 20163212 | 875085 | F187V23987L | Forklift (Propane) | Hyster | S40FT | 4K | 0 | Port Hueneme, Bldg. 801 | A* | 1 T Year 365 (Steam Cleaning) | 6/1/26 | 46295.00 | $377.50 | $0.00 | Kevin Hamilton | Leslie Lee | 20163212 | Port Hueneme | 801 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .