This document is a Questions and Answers (Q&A) spreadsheet for Solicitation No. N00244-25-Q-S088, a small business set-aside contract for Interior Design Services at Naval Air Station Lemoore. The solicitation requires custom design services and fabrication of mixed-media murals with integrated lighting and floating walls for the facility's dining area. Key requirements include creating 3D layered wall elements, custom LED backlighting with reflective edges, and graphic design installations across four bay areas measuring 153'3" x 8'2".
The Q&A document reveals specific design flexibility, with the government allowing vendors to propose their own interpretations of wood materials, lighting configurations, and wall designs. The Food Service Officer will make final design decisions after the contractor presents a detailed proposal within 10 business days of contract award. Technical questions were to be submitted by email, with the solicitation closing on 22 August 2025. Contractors must complete representations and certifications in the System for Award Management (SAM) and coordinate base access through specific point of contact personnel at Naval Air Station Lemoore.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit-1.jpg | JPG image | |
| Exhibit-4.jpg | JPG image | |
| Exhibit-2.jpg | JPG image | |
| Exhibit-3.jpg | JPG image | |
| Attachment -QA Government Responses.xlsx | XLSX spreadsheet | |
| N00244-25-Q-S088 Combined Synopsis Galley Upgrades.pdf | ||
| SOW NAS LEMOORE.pdf | ||
| TECHNICAL EXHIBITS LEMOORE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation No. N00244-25-Q-S088 Questions and Answers Q&A | ||
| No. | Question | Government Response |
| 1 | Please confirm whether the “3D Layered, Custom Floating Wall mounted on Cinder Block in Wood” elements are to be fabricated from solid real wood or if alternative materials (such as veneers or engineered wood) are acceptable. | As long as it would be the same or better quality and it would provide the purpose of the wood which is “3D Layers” |
| 2 | Does the Government require the use of multiple wood species (e.g., Maple, Oak, Birch), or is a single species acceptable? | No specific type of wood, as long as it will provide the 3D effect |
| 3 | For the wood hexagon elements, is there an expectation that individual hexagons will vary in depth, or should all pieces be uniform in depth? | There was no requirement for hexagon elements. TE7 was provided to show an example of the final product of the requirement. The design will vary per SOW note under 3.15 The contractor shall assess and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc. |
| 4 | The term “Reflective Edge” is referenced in the SOW for LED backlighting integration. Could the Government provide a definition or description of the intended “Reflective Edge” application? | Any material that is reflective in the edge to intensify the lighting effect of the art |
| 5 | Regarding LED lighting, should the halo lighting effect be positioned specifically on the left edge of the wood elements (as depicted in the renderings), or is a different lighting configuration intended for the “Reflective Edge” detail? | The design will be recreated by the vendor and present it to the FSO per SOW note under 3.15 The contractor shall assess and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc. |
| 6 | For any “Bee” design element shown in reference images or renderings, should it be halo lit and dimensional, and if so, to what extent? | There was no requirement for bee elements. TE7 was provided to show an example of the final product of the requirement. The design will vary per SOW note under 3.15 The contractor shall assess and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc. |
| 7 | Will the facility provide 110v power in at least two locations on the wall where the 3D art installations will be mounted, or should the contractor plan to provide and install new power connections? | Vendor has to incorporate the design considering the power source |
| 8 | Could the Government provide the specific dimensions (width and height) for the wood/floating wall portions of the installations, separate from the overall mural area dimensions provided in the SOW? | The design will be recreated by the vendor and present it to the FSO per PWS 3.14 Digital Design and Engineering Services - Includes 3 Edits / Digital Scaling / Photo Realistic Mock-Up - 28 Design Hour Allotment. Presentation should include the location of the lighting and the 3D effects. |
| 9 | 3.8, 3.11, 3.13 Custom LED Backlighting Integration with Reflective Edge - can you provide the linear ft or area dimensions for the LED backlighting? | Per PWS 3.15 “Note: Presentation of all graphic design will be presented to the Food Service Officer by the contractor within seven (10) business days upon award of the contract . FSO will make the final decision for the design prior to installation”. This means the backlighting will be integrated with the design presented by the vendor |
| 10 | 3.9, 3.10, 3.12 Layered Custom Floating Wall mounted on cinder block in wood - can you provide dimensions for each of the custom floating wall units? Is there to be graphics installed on the floating wall panels or are they simply wood panels that are layered? | Per PWS 3.15 “Note: Presentation of all graphic design will be presented to the Food Service Officer by the contractor within seven (10) business days upon award of the contract . FSO will make the final decision for the design prior to installation”. This means the floating wall will be integrated with the design presented by the vendor. All dimension was provided under PWS and Technical Exhibits. |
| 11 | Can you provide an extension of 48 hours from the time the answers to the questions are provided? | The Government is unable to provide an extention. |
| 12 | TE8 in the Technical Exhibits Lemoore spreadsheet looks to be missing dimensions. Will you please provide this information? | TE8 was provided as an example of the final product of the requirement. The design could vary per PWS 3.15 |
| 13 | 3.3: Please confirm the total sizing is 153’3 in width, not qty of 4 at 153’W | Per SOW 3.3 Bays 1-4 (153’3” x8’2”) Qty:4. The dimension applies to all 4. TE3 shows only 3 pictures but it was annotated Bay 1- 4 |
| 14 | 3.7: Please confirm proper qty to be included in this. The SOW does not match the technical with qty and measurements | SOW 3.7 (5’7”x36” Entrance Doors (Qty: 4) and 6’x35” Exit Doors (Qty: 5) with a total of 9 Glass Doors |
| 15 | 3.8 (AREA 1) Custom led Backlighting Integration with Reflective Edge |
3.8.1 QTY: 1
| - | Please provide sizes of the wall | |
| - | Is power already in this location, or is the contractor supposed to incorporate a licensed electrician to run the power to the site? | |
| - | Can you send a picture of the wall without a mockup please? | Measurement provided for the required mural dimension which is 153 B186 x 8’2”. |
additional pictures were attached per request 16 3.11 (AREA 2) Custom LED backlighting integration with reflective edge.
3.11.1 QTY: 1
| - | Please provide sizes of the wall | |
| - | Is power already in this location, or is the contractor supposed to incorporate a licensed electrician to run the power to the site? | |
| - | Can you send a picture of the wall without a mockup please? | Measurement provided for the required mural dimension which is 153’6 x 8’2”. |
Power is available in each section additional pictures were attached per request 17 3.12 (AREA 3) 3D Layered. Custom Floating Wall mounted on Cinder Block in Wood
3.12.1 QTY: 4
| - | Please provide sizes of the wall | |
| - | Are there 4 walls for this display that all need this type of solution, or are there 4 pieces on the one wall? | |
| - | Can you send a picture of the wall please? | |
| - | Is there a mockup of what the desired look is like was supplied for the other wall with this solution? | Measurement provided for the required mural dimension which is 153’6 x 8’2”. |
There are 4 Bay areas of the messdeck. Two of the bay which is bay 2 and bay 3 requires trimming.
18 3.13 (AREA 3) Custom LED Backlighting Integration with Reflective Edge
3.13.1 QTY: 4
| - | Is power already in this location, or is the contractor supposed to incorporate a licensed electrician to run the power? | |
| - | Are there 4 walls for this display that all need this type of solution, or 4 pieces on the one wall? | Power outlet is available per wall |
There are 4 Bay areas of the messdeck. Two of the bay which is bay 2 and bay 3 requires trimming.
19 4.6. Contractor is responsible to obtain necessary security pass for base access. The government will not provide escorts to and from the gate.
- Will DBIDS grant access to this site, or is there another process for this access? Please provide the detailed information/process, as there is a very tight turnaround time for this project based on the SOW. POC will be PO1 LUIS ACOSTA Cell # 916-380-8885. The site is in the Operation side of Lemoore and will requires an escort Alternate POC provided CSCS Ferdinand Pasco, Cell # 858-201-9945 20 GENERAL: This requirement is to provide dining facility furniture, lighting fixtures, decorative signage, and modification of interior of facility to include window, doors, overheads, and walls identified at Naval Air Station Lemoore Galley.
| - | There is no dining facility furniture or construction scope listed in the line items for the project. Is furniture included in this scope or not included? Are new windows and new doors included in this scope, or only the graphics/visuals being outlined? | There are no requirement for furniture’s or construction. Requirements for windows and doors are only for graphics. |
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | ||
| 27 | ||
| 28 | ||
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
| 33 | ||
| 34 | ||
| 35 | ||
| 36 | ||
| 37 | ||
| 38 | ||
| 39 | ||
| 40 | ||
| 41 |