Questions.docx

DOCX document 15 KB Posted

Attached to
NASNI Galley Upgrade
Solicitation number
N00244-25-Q-S086
Issued by

About this file

This document is a Questions and Answers file for the NASNI Galley Upgrade solicitation (N00244-25-Q-S086) issued by the Department of the Navy Naval Supply Systems Command. The Q&A addresses specific details about the project's mural and decorative elements, including artwork selection, design consultation, and technical exhibit specifications. Key points include that the Food Service Officer will select colors and pictures at no additional cost, and the contractor must provide consultation to incorporate visual references that reflect the location's culture and aesthetic. The project involves creating custom mixed-media murals with integrated lighting and floating walls for dining facilities at Naval Base Coronado, with a performance period from August or September 2025 to October 2025. Technical exhibits outline specific areas and requirements, with Technical Exhibit 7 demonstrating sample final products featuring LED lights and 3D effects.

View the file

Other files

File Type Posted
04 TECHNICAL EXHIBITS.xlsx XLSX spreadsheet
02 REVISED NAB NBC SOW.docx DOCX document
N00244-25-Q-S086 Combined Synopsis Galley Upgrades .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. I just want to know is the picture the artwork that will be installed on all of the locations on the excel sheet attached to the solicitation information?

0. Per Statement of work 4.10.1 Color and picture selections will be made by the Food Service Officer with no additional cost in pricing. (The design and artwork will be made and presented by the Vendor to the Galley Food Service Officer/ Chiefs)

0. SOW 5a. The contractor shall provide consultation services to gain an understanding of specific visual references to incorporate into the mural work that are expressive of the location, culture, interest, or desired aesthetic of the client.

2. Also for TE1 to TE4 and TE6, TE7 are these all Decals, while for TE6 (inside the galley) are these with LED lights? or just Decals. Decals are big heavy-duty stickers.

0. Technical Exhibits 1-6 are the areas and locations of the project requirement. Technical 7 is the sample of the final products with led lights and floating walls for 3d effects (see SOW)

File details come from the government source that posted it. Updated .