This is a Statement of Work (SOW) for a naval dining facility upgrade project at Naval Base Coronado and Naval Air Station North Island. The contract requires custom design and installation of digital prints, murals, and decorative elements across multiple locations in two galley facilities, including wall emblems, mixed-media murals with integrated lighting, floating walls, and custom vinyl graphics. The project involves creating themed designs for various areas such as kitchen walls, bar rooms, conference rooms, and entryways, with specific requirements for materials like IJ 35C matte laminate, 3D vinyl installations, and LED lighting.
The contract (Solicitation Number N00244-25-Q-S086) is issued by the Department of the Navy Naval Supply Systems Command, with a performance period from 01 August 2025 to 31 October 2025. The contractor must complete the entire project within 90 days after contract award, with the first 30 days dedicated to design phase and the remaining 30-60 days for installation. Work is restricted to specific hours (Monday-Friday, 0730-1700, avoiding meal times) and requires contractor personnel to manage site preparation, dust containment, daily cleanup, and obtain necessary base security passes. The total project scope includes precise measurements and specifications for wall treatments at both NAB and NASNI galley locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions.docx | DOCX document | |
| 04 TECHNICAL EXHIBITS.xlsx | XLSX spreadsheet | |
| N00244-25-Q-S086 Combined Synopsis Galley Upgrades .docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Naval Base Coronado NAB Galley BLGD 300 Guadalcanal Rd.
Coronado, CA 92118
Naval Air Station North Island NASNI Galley BLGD 794 South R Ave.
Coronado, CA 92118
1. GENERAL: This requirement is to provide dining facility furniture, lighting fixtures, decorative signage, and modification of interior of facility to include window, doors, walls identified at Naval Base Coronado in Naval Amphibious (NAB) & Naval Air Station North Island (NASNI) galleys.
2. SCOPE OF WORK: The contractor will provide materials, labor, supervision, installation and delivery of all items listed, unless noted otherwise in strict accordance with these specifications. The contractor will provide both custom design services as well as fabrication of custom mixed-media mural(s) with integrated lighting and floating walls.
3. Tasks 1: Naval Amphibious Base Galley (NAB). Contractor will provide digital prints from selected pictures on walls to be identified by the customer as outlined below:
| 3.1 | Wall Emblems crest and Digital Print to go on back of galley wall between breaks 4’ W x 4’ H (QTY 8) |
| 3.1.1 | IJ35C matte laminate Finish: Trim to size |
| 3.1.2 | Approximate measurements 4’ W x 4’ H |
3.2 NAB Galley Serving Line (Back Wall) 3 Open Areas. Design and Fabricate Custom Mixed-Media Mural Walls with Integrated Lighting and Floating Walls in open areas of back wall in serving area 77’ W x 84" H (x2) / 36’ W x 84” H (x1) (Qty 3 pieces)
3.2.1 Print: IJ 35C matte laminate Finish: Trim to size
3.2.3 Approximate 77’ W x 84" H (x2) / 36’ W x 84” H (x1)
3.3 NAB Coronado Galley “CPO PIN” Design and Fabricate Custom Walls for CPO area 36"H x 195" W (x2) 36"H x 285" W (x2) Qty (1: 2 sides)
3.3.1 Print: IJ 35C matte laminate Finish: Trim to size
3.3.2 Approximate 36"H x 195" W x2 36"H x 285" W x2
3.3.3 Specific Location see Technical Exhibit 5
3.4 NAB Galley 3 Entrance / Exits Custom Walls Design and Fabricate Walls for 3 Entryways 155"W x 90"H (x 2) 124"W x 90"H (x 1) Qty (1: 3 entrances)
3.4.1 Print: IJ 35C matte laminate Finish: Trim to size
3.4.2. Approximate size 155"W x 90"H x 2 124"W x 90"H x 1
3.4.3 Specific Location see Technical Exhibit 6
3.5 Installation:
3.5.1 1 Installation at NAB on eight different walls to be identified by Food Service Officer.
3.5.2 Installation will be in accordance with all local and environmental requirements.
3.6 Selections:
3.6.1 Color and picture selections will be made by the Food Service Officer with no additional cost in pricing.
4. Task 2: Naval Air Station North Island Galley (NASNI). Contractor will provide digital prints from selected pictures on walls to be identified by the customer as outlined below:
| 4.1 | Digital Print 1 Kitchen Right Wall: 348”W x 107”H |
| 4.1.1 | 3D Custom Design mounted on top of preexisting tile finish, IJ 75C matte laminate finish and trim to size. |
| 4.1.2 | Approximate measurements: 348" W x 107" H \ |
| 4.1.3 Specific Location see Technical Exhibit 3 |
| 4.2 | Digital Print 1 Bar Room: 510"W x 126"H 278"W x 126"H 606"W x 126"H |
| 4.2.1 | Sports Themed design with custom logo 3D effects and lighting to create completely separate aesthetic for fast pick up items. - Area to look similar to resort bar / sports bar |
| 4.2.2 | Approximate measurements: 510"W x 126"H 278"W x 126"H 606"W x 126"H |
| 4.2.3 Specific Location see Technical Exhibit 1 |
| 4.3 | Digital Print 1 Conference Room Wall: 351”Wx114”H |
| 4.3.1 | Custom Design Entire Wall Landscape Mural with 3D effect, IJ 35C matte laminate finish and trim to size |
| 4.3.2 | Approximate measurements: 351”W x 114”H |
| 4.4 | Digital Print 1 Galley Front: 81”W x 22.5”H Qty (4 pieces) |
| 4.4.1 | Frost vinyl glass, no print dusted crystal finish |
| 4.4.2 | Approximate measurements: 81”W x 22.5”H |
| 4.4.3 Specific Location see Technical Exhibit 2 |
| 4.5 | Digital Print 1 Galley outdoor window: 72” x 72” Qty (7 pieces) |
| 4.5.1 | Custom Design Outdoor Windows, IJ white back vinyl finish |
| 4.5.2 | Approximate measurements: 72” x 72” |
| 4.6 | Digital Print 2 Galley Outdoor Door and Top Glass: 31”W x 71”H x4, 20”H x 72”W x2 Qty (2 pieces) |
| 4.7.1 | Blue Metal outdoor frame wrap and new letter material and install |
| 4.7.2 | Approximate measurements: 31”Wx71”Hx4, 20”Hx72”Wx2 |
| 4.7.3 Specific Location see Technical Exhibit 4 |
| 4.7 | Digital Print 1 Galley Slatted Wall 3D Vinyl Install: 280”x 101” |
| 4.8.1 | Installed on top of pre-existing slatted wall in 3D fashion |
| 4.8.2 | Approximate measurements: 280”x101” |
| 4.8 | Installation: |
| 4.9.1 | Installation at Naval Air Station North Island on 8 different walls to be identified by Food Service Officer. |
| 4.9.2 | Installation will be in accordance with all local and environmental requirements. |
| 4.9 | Selections: |
| 4.10.1 | Color and picture selections will be made by the Food Service Officer with no additional cost in pricing. |
Note 1: TE1 to TE4 is provided for NASNI murals location Note 2: TE5 and TE6 is provided for NAB murals location.
Note: Final product sample provided for reference (See Technical Exhibit 7)
5. ADDITIONAL REQUIREMENTS
a. The contractor shall provide consultation services to gain an understanding of specific visual references to incorporate into the mural work that are expressive of the location, culture, interest, or desired aesthetic of the client.
b. The contractor shall use a professional visual artist, design a mixed-media mural wall(s) that incorporates custom, commercial-grade wallpaper or high tach commercial grade vinyl, hand painted accents, high definition photography integration, LED lighting, wood, floating walls to create a 3 dimensional effect, and any other materials needed to enhance the overall look and feel of the space. (Consideration to the use of props, such as hanging décor, should be included and provided to further established the desired look and feel of the space.) The design should be artistic in nature and employ the use of stylization, fonts, negative and positive space, color, and texture to create a final look.
c. The contractor shall provide a visual artist’s draft using photo specific references of the space to show the full layout of elements, colors, textures, lighting, etc.
d. The contractor shall asses and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc.
e. The contractor shall fabricate floating walls that create a three dimensional effect and layered aesthetic while simultaneously integrating walls into an overall cohesive design.
f. The contractor shall install LED lighting (backlighting) integrated into floating walls that create visual interest and align with the overall look and feel of the space. The contractor shall ensure the proper wiring and wire management of all electronic elements.
g. The contractor shall fabricate and install all visual aspects of mixed-media walls, including but not limited to, custom wallpaper or vinyl, hand-done painting, wood accents, veneers, stains or other specialty finishes. The contractor shall ensure the full design extends throughout floating walls while maintaining one cohesive look.
6. CONTRACTOR RESPONSIBILITIES
a. Contractor is responsible for verifying all dimensions prior to bidding and installation.
b. The contractor will provide personnel who are certified to perform required tasks.
c. Contractor will be permitted to work inside of the Dining Facility during the following hours: Monday through Friday - 0730-1700 except during meal hours and holidays. Meal hours are: Breakfast: 0600-0730; Lunch: 1100-1230; Dinner 1600-1730. Night or weekend shift may be coordinated with Food Service Officer with no additional cost in pricing. Night shift is preferred if project involves loud noise and heavy dust to not interfere with patrons during meal hours and must be coordinated with the FSO. Exact days of work will be coordinated before commencement to ensure space availability. Coordinate with LCPO /FSO before commencing work to ensure serving line or each section is secured for work while utilizing different serving lines to serve the patrons. Immediate work area will be properly secured by the contractor and will not conflict with meals being served or dining area being utilized.
d. Contractor will provide plastic barriers to contain dust or paint.
e. Contractor is responsible for daily clean up and disposal of all generated debris/materials to proper disposal or recycle containers at the back dock.
f. Contractor is responsible to obtain necessary security pass for base access. The government will not provide escorts to and from the gate.
7. COMPLETION: This project must be fully completed within 90 days after contract award. First 30 days will be allotted for design phase, drafting, editing, and final approval of design. Once design has been approved, 30-60 days will be allotted for installation.
8. Place of performance.
Naval Air Station North Island OPS Side (NASNI), Building 678.
Naval Amphibious Base Coronado (NAB) Bldg 300
9. Point of contact:
| Primary: CSC Ulises Gutierrez, 626-407-9231, Ulises.Gutierrez2.mil@us.navy.mil. |
| Alternate: CWO3 Pearl Amoako, 619-888-4261, pearl.amoako.mil@us.navy.mil |