This is a Quality Assurance Surveillance Plan (QASP) that establishes the Government's systematic method for monitoring contractor performance on an Optimization and Transformation (O&T) contract related to military medical readiness services.
The QASP defines performance standards across six key areas: Policy Implementation, Data & Performance Management, Force Development & Training, Process Improvement & Modernization, Task Order Administration & Reporting, and Contract Invoicing & Accuracy. For each performance element, the plan specifies performance requirements, surveillance methods, frequency of review, Acceptable Quality Levels (AQLs), and financial deductions for non-compliance. Policy deliverables must meet >95% on-time submission with factual accuracy and minimal revisions, subject to 5% monthly invoice deductions per failing deliverable. Data reports require >95% on-time submission with 100% accuracy and full data quality control compliance. Training materials and force development plans must achieve >95% on-time delivery and be deemed effective by the Contracting Officer's Technical Authority (COR-TA), with 5% deductions for rework exceeding one revision. Process improvement deliverables must meet >95% acceptance without major rework, incurring 5% monthly deductions for non-compliance. Administrative compliance and monthly progress reports require 100% on-time submission without correction, with 2% daily deductions for late reports. Contract invoicing demands 100% accuracy in financial reporting with rejected invoices withheld from payment and potential 2% administrative penalties for persistent errors. The Government reserves unconditional inspection rights including unannounced site access, IT systems review, physical security assessment, and periodic data rights verification audits. Failure to achieve satisfactory performance may result in contract termination, loss of future Government contracts, non-exercise of available options, and issuance of Contract Discrepancy Reports requiring written five-day responses from the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Solicitation Amendment N0018926QB1430001.pdf | ||
| Attachment 2. PPIF.docx | DOCX document | |
| Solicitation - N0018926QB143.pdf | ||
| Attachment 3. CAP - FFP.pdf | ||
| Attachment 1. QASP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of Optimization and
Transformation (O&T) is the timely, accurate and thorough completion of all contract/task order requirements.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s record of forecasting and controlling costs, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints. To ensure complete transparency and operational security, the Government retains unconditional inspection rights:
• Comprehensive Site Access: The Government reserves the right to conduct unannounced, on-site inspections of contractor and sub-contractor facilities where contract work is being performed.
• Scope of Inspection: Inspections may include reviews of contractor IT systems interacting with Government
Furnished Equipment (GFE), physical security measures, and personnel labor mapping.
• Data Rights Verification: Audits will periodically verify that all process documentation are being properly stored on Government servers to prevent proprietary vendor lock-in and ensure a seamless future transition to
Government insourcing.
4. Performance Measurement: The government will monitor the contractor's performance against the following standards. The COR will conduct surveillance to ensure services are delivered in accordance with the PWS and meet the Acceptable Quality Levels (AQLs). If performance is not met, the government may impose deductions for noncompliance. The government will determine deductions as need arise.
Performance
Element
Performance
Requirement
Surveillance
Method
Frequency Acceptable
Quality
Level (AQL)
Financial
Deduction (Per
Occurrence/Month)
Policy
Implementation
Draft, revise, and manage medical readiness policy documents
(e.g., accessions, 100% inspection of policy documents, drafts, and stakeholder coordination
Per
Deliverable
/ As
Assigned
>95% of policy deliverables are submitted on time, are factually accurate, and require no
5% deduction from the monthly invoice for each policy deliverable not meeting the AQL.
LIMDU,
EDIS). Ensure alignment with
DoN directives and manage stakeholder reviews and adjudication.
records by
COR-TA.
more than one major revision.
Data &
Performance
Management
Compile, organize, and format program-level readiness data to produce recurring reports (e.g., Monthly
Analytics
Report Card) and ad-hoc data products.
Maintain data quality and governance.
Monthly review of the
Analytics
Report Card and all other data products by the COR-
TA.
Monthly /
Per
Deliverable
>95% of data reports are submitted on time and are
100% accurate. All data quality controls are met.
5% deduction from the monthly invoice for each data report not meeting the
AQL.
Force
Development
& Training
Develop, update, and maintain standardized training products (e.g., Force
Development
Plan, guides, process maps) to address identified knowledge gaps across the enterprise.
COR
inspection of all training materials and the Force
Development
Plan.
Per
Deliverable
/ Annual
>95% of force development materials are submitted on time and are deemed effective and accurate by the COR-TA.
5% deduction from the associated deliverable line item for rework exceeding one revision.
Process
Improvement
Modernization
Document workflows, identify performance gaps, and execute government-
Review of process maps, briefings, and
After-Action
Reports by
COR.
As
Required /
Per
Initiative
>95% of process improvement deliverables are accepted without major rework or
5% deduction from the monthly invoice for each deliverable not meeting the
AQL.
directed process improvement initiatives.
Produce briefings and
After-Action
Reports on status and outcomes.
factual correction.
Task Order
Administration
& Reporting
Deliver accurate and complete
Monthly
Progress
Reports.
Maintain all administrative compliance, including
NDAs, GFE tracking, and onboarding requirements.
100% inspection of
Monthly
Progress
Reports and administrative records by
COR.
Monthly 100% of administrative deliverables submitted on-time and accepted without correction.
2% deduction from the monthly invoice for each business day a required report is late.
Contract
Invoicing &
Accuracy
Submit timely, mathematically sound monthly invoices that align with approved progress reports and contract labor categories.
Review & verification of monthly invoice by
COR.
Monthly 100% accuracy in financial reporting, billing, and rate matching.
Inaccurate invoices will be rejected;
payment withheld until corrected.
Persistent errors may result in a 2% administrative penalty.
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional fee, to replace or correct work that fails to meet contract requirements. To maximize the profit earned on costs incurred, the contractor is incentivized to ensure that quality products are provided in a timely manner.