2.02f Attachment III - Questions and Answers.pdf

PDF 373 KB Posted

Attached to
Eaton-Brand Name Uninterruptible Power Supply (UPS) System Replacement Federal contract opportunity
Solicitation number
N0018924Q0543
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document contains Questions and Answers related to Solicitation N0018924Q0543 for the replacement of Eaton brand Uninterruptible Power Supply (UPS) systems. The solicitation is issued by the Department of the Navy Naval Supply Systems Command. Key details include:

The existing UPS systems are located in various buildings and not all are on concrete housekeeping pads. The contractor is expected to perform a post-award site survey to verify measurements, conditions, and quantities. Load bank testing is required, and the contractor must submit certified inspection and test reports. The replacement UPS systems must be compatible with the existing battery cabinets, and the contractor is not expected to upgrade the electrical infrastructure. The solicitation does not specify a set order for the UPS replacements, but the Transmit Site Monitor and Receive Site Monitor locations must be completed during the same outage. Remote monitoring panels and emergency power off buttons are present at some locations. The government will not consider a small business set-aside for this procurement.

View the file

Other files for this federal contract opportunity

Other files attached to Eaton-Brand Name Uninterruptible Power Supply (UPS) System Replacement, newest first.
File Type Posted
Questions and Answers Received - 9.10.pdf PDF
2.02 Attachment I - BNJ (Redacted).pdf PDF
2.01a RFQ N0018924Q0543 - Released.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Received for ID# N0018924Q0543 – Eaton Brand Name UPS Replacement

1. Are the existing 9390 UPS systems on concrete housekeeping pads? If so the new Eaton 93PM is 42” deep, the existing 9390 are only 32.5”.

B344 and B310 are not on housekeeping pads. Installed on the building slab/floor.

RSM and TSM are installed on the shelter floor.

Attached are drawings of the locations.

The PWS states: “Contractors shall perform a post-award onsite survey to verify actual measurements, field conditions, locations, quantities, equipment and material information. The onsite survey is expected to be completed before any work is schedule”

2. Is load bank testing required.

I believe the answer is yes. This should be answered by the manufacture.

The PWS states: “Submit certified copies of inspection reports and test reports.

Reports shall include certification of compliance with NETA and the Manufactures instructions. Hard copies of test reports are required for the final record.”

NETA ATS 7.22.2 Emergency Systems, Uninterruptible Power Systems refers to a NOTE: There are many configurations of uninterruptible power supply installations.

Some are as simple as a static switch selecting between two highly reliable sources, while others are complex systems using a combination of rectifiers, batteries, inverters, motor/generators, static switches, and bypass switches. It is the intent of these specifications to list possible tests of the major components of the system and more specifically the system as a whole. It is important that the manufacturer’s recommended commissioning tests be performed.

3. Will these projects be installed concurrently? It states building 344 will be the first site for replacement. Is there a set order of replacement after that?

Requesting B344 as the first. There is no set order other than the PWS request the Transmit site monitor (TSM) and Receive site monitor (RSM) to be completed at the same time.

The PWS states: The contractor must schedule all work with the customer POC for each site and work must be completed to minimize facility downtime. The Contractor shall perform as much work as possible ahead of the outage to minimize down time.

Once the work has started the contractor is expected to complete the replacement process. Transmit site monitor (TSM) and Receive site monitor (RSM) UPS replacements must be completed during the same scheduled downtime outage. Please note these locations are about 90 miles apart.

4. Can you send me the diagrams of work locations(They were attached in the RFQ) I granted you access via SAM.Gov. Let me know if you’re still having issues.

5. Are there RMP’s (Remote Monitoring Panels) installed on the existing systems? If so, are they wanting replacements?

Only in building 344. The existing can be reconnected if compatible. See attached one-line and detail There are remote audible alarms connected to the existing ups alarm screen/panel that will need to be reconnected.

Battery Cell Watch is connected to the existing equipment battery box and batteries and will remain but should not affect UPS replacement

6. Are there REPO’s (Remote Emergency Power Off) buttons installed on existing system? If so how many per UPS?

Only to the MDP panel breaker shunt trip. see attached one-line drawings.

7. Are new UPS input and output feeders required or can we re-use existing?

The existing can be used unless problems are found in the wall through. This is not expected.

8. Would the Government consider using a small-business set-aside?

No.

9. Will there be access to a loading dock/forklift?

Forklifts are available on all sites.

10. Does the Government anticipate that the current electrical infrastructure will be adequate to support the UPS install, or will the contractor be required to upgrade electrical infrastructure (i.e. panel/disconnect)?

All requirements are as listed in the PWS. The Government does NOT require any electrical infrastructure upgrades. Current electrical infrastructure is adequate.

11. They are stating that the current 9390 battery cabinets are not compatible with the 93PM UPS system that is being requested. Do you know if any of the following is available so we can get an accurate quote for this opportunity? Currently there is no request for the battery cabinets and the old cabinets are not compatible so we would not be able to provide an accurate quote based on the information we currently have.

The RFQ did not specify 93PM UPS system. The RFQ specified the replacement would meet the same performance requirements as the existing equipment and would be compatible with the existing battery cabinets. The breakers and shunt trips in the battery cabinets will be replaced per the RFQ.

12. If the customer has a specific runtime requirement, we can assist with verifying the runtime that the UPS delivers at their load with insight into the following:

a. Runtime requirement (in minutes) at each location

b. Load (in W) that the UPS at each location will support

Runtime requirements should be obtained by the existing equipment per site in the

PWS.