Attachment J.1.pdf

PDF 290 KB Posted

Attached to
MK 88 MOD 4 Gun Mount Analysis
Solicitation number
N0017824R2301
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that details data deliverables for a sole source contract between the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) and Northrop Grumman Systems Corporation (NGSC). The contract is for NGSC to provide analysis services related to the MK 88 MOD 4 Gun Mount, which houses the MK 44 MOD 3 30MM Chain Gun that NGSC manufactures. The CDRL lists three data items: a Technical Report - Study/Services Status/Analysis Report, an Engineering Change Proposal, and a Government Property Inventory Report. The first two items require initial and subsequent submissions within 30 days after completion of the analysis/assessment. The Government Property Inventory Report is required quarterly. The documents are distribution controlled and may only be shared with authorized U.S. Government agencies and contractors.

The related federal contract opportunity is a pre-solicitation notice for the MK 88 MOD 4 Gun Mount Analysis requirement. NSWCDD intends to award a cost-plus-fixed-fee contract to NGSC on a sole source basis, as they are the sole manufacturer and repairer of the MK 44 MOD 3 30MM Chain Gun and have proprietary design details. Delivery is required within 60 days after receipt of the order.

View the file

Other files

File Type Posted
SF 33-N0017824R2301.pdf PDF
Attachment J.2-QASP.pdf PDF
Attachment J.3 Cost Summary and Staffing Matrix Attachment.xls XLS spreadsheet
Attachment J.4 GFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0003 A

X - MISC

NGSC ANALYSIS SERVICES N0017824C2301 NORTHROP GRUMMAN CORPORATION DE

A001 TECHNICAL REPORT - STUDY/SERVICES STATUS/ANALYSIS REPORT

DI-MISC-80508B SOW 6.1 NSWCDD/E32

NO

A (*16) D(SEE BLK 16)

ASREQ

NA

SEE BLK 16

SEE BLK 16

TPOC1 1 1

TPOC2 1 1

SEE BLK 16

2 2 0

BLK 8: APPROVAL OF TECHNICAL CONTENT ONLY. THE

GOVERNMENT HAS 15 DAYS FROM RECEIPT TO REVIEW, COMMENT

AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 10 DAYS TO

SUBMIT REVISIONS.

BLK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO

US GOVERNMENT AGENCIES (PROPRIETARY BUSINESS

INFORMATION) (20 JANUARY 2023). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO THE NAVAL SURFACE

WARFARE CENTER, DAHLGREN DIVISION (NSWCDD), E32 BRANCH

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE

EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE

22, U.S.C., SEC. 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT

OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ. VIOLATIONS

OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATION IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5320.25.

BLKS 10, 12, 13: FIRST AND SUBSEQUENT SUBMISSIONS DUE NOT

LATER THAN 30 DAYS AFTER THE COMPLETION OF THE

ANALYSIS/ASSESSMENT.

BLK 14: ELECTRONIC MEDIA: SUBMIT DATA IN MICROSOFT (MS)

OFFICE 365APPLICATIONS (OR EARLIER) OR ADOBE PORTABLE

DOCUMENT FORMAT (PDF) ATTACHED TO ELECTRONIC MAIL (EMAIL)

NOTIFICATION TO THE TECHNICAL POINTS OF CONTACT (TPOCS)

THAT FOLLOW: SCOTT SMITH, EMAIL:

BRADFORD.S.SMITH.CIV@US.NAVY.MIL, JOSEPH EDWARDS, EMAIL:

JOSEPH.A.EDWARDS7.CIV@US.NAVY.MIL

TEMPALSKI.JANELLE.K.1271

649335

Digitally signed by

TEMPALSKI.JANELLE.K.1271649335

Date: 2024.04.16 20:58:28 -04'00'

BLASER.NATHALINE.SWINT

.1047400402

Digitally signed by

BLASER.NATHALINE.SWINT.1047400402

Date: 2024.04.16 16:39:11 -04'00'

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0003 A

X - SESS

NGSC ANALYSIS SERVICES N0017824C2301 NORTHROP GRUMMAN CORPORATION DE

A002 ENGINEERING CHANGE PROPOSAL (ECP)

DI-SESS-80639E SOW C.3.4, C.3.5.1 NSWCDD/E32

NO

A (*16) D(SEE BLK 16)

ASREQ

NA

SEE BLK 16

SEE BLK 16

TPOC1 1 1

TPOC2 1 1

SEE BLK 16

2 2 0

BLK 8: APPROVAL OF TECHNICAL CONTENT ONLY. THE

GOVERNMENT HAS 15 DAYS FROM RECEIPT TO REVIEW, COMMENT

AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 10 DAYS TO

SUBMIT REVISIONS.

BLK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO

US GOVERNMENT AGENCIES (PROPRIETARY BUSINESS

INFORMATION) (20 JANUARY 2023). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO THE NAVAL SURFACE

WARFARE CENTER, DAHLGREN DIVISION (NSWCDD), E32 BRANCH

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE

EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE

22, U.S.C., SEC. 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT

OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ. VIOLATIONS

OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATION IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5320.25.

BLKS 10, 12, 13: FIRST AND SUBSEQUENT SUBMISSION DUE NOT

LATER THAN 30 CALENDAR DAYS AFTER THE COMPLETION OF THE

ANALYSIS/ASSESSMENT.

BLK 14: ELECTRONIC MEDIA: SUBMIT DATA IN MICROSOFT (MS)

OFFICE 365 APPLICATIONS (OR EARLIER) OR ADOBE PORTABLE

DOCUMENT FORMAT (PDF) ATTACHED TO ELECTRONIC MAIL (EMAIL)

NOTIFICATION TO THE TECHNICAL POINTS OF CONTACT (TPOCS)

THAT FOLLOW: SCOTT SMITH, EMAIL:

BRADFORD.S.SMITH.CIV@US.NAVY.MIL, JOSEPH EDWARDS, EMAIL:

JOSEPH.A.EDWARDS7.CIV@US.NAVY.MIL

TEMPALSKI.JANELLE.K.1271

649335

Digitally signed by

TEMPALSKI.JANELLE.K.1271649335

Date: 2024.04.16 20:57:47 -04'00'

BLASER.NATHALINE.SWINT

.1047400402

Digitally signed by

Date: 2024.04.16 16:43:20 -04'00'

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0003 A

X - MGMT

NGSC ANALYSIS SERVICES N0017824C2301 NORTHROP GRUMMAN CORPORATION DE

A003 GOVERNMENT PROPERTY (GP) INVENTORY

REPORT

DI-MGMT-80441D SOW C.5.1 NSWCDD/E32

NO

A (*16) D(SEE BLK 16)

QRTLY

EOQ

EOQ

TPOC1 1 1

TPOC2 1 1

COR 0 1

SEE BLK 16

2 3 0

BLK 8: APPROVAL OF TECHNICAL CONTENT ONLY. THE

GOVERNMENT HAS 15 DAYS FROM RECEIPT TO REVIEW, COMMENT

AND APPROVE OR DISAPPROVE. THE CONTRACTOR HAS 10 DAYS TO

SUBMIT REVISIONS.

BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY (CTI)

(20 JANUARY 2023). OTHER REQUESTS FOR THIS DOCUMENT SHALL

BE REFERRED TO THE NAVAL SURFACE WARFARE CENTER,

DAHLGREN DIVISION (NSWCDD), E32 BRANCH

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE

EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE

22, U.S.C., SEC. 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT

OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ. VIOLATIONS

OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATION IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5320.25.

BLK 14: ELECTRONIC MEDIA: SUBMIT DATA IN MICROSOFT (MS)

OFFICE 365 APPLICATIONS (OR EARLIER) OR ADOBE PORTABLE

DOCUMENT FORMAT (PDF) ATTACHED TO ELECTRONIC MAIL (EMAIL)

NOTIFICATION TO THE TECHNICAL POINTS OF CONTACT (TPOCS)

THAT FOLLOW: SCOTT SMITH, EMAIL:

BRADFORD.S.SMITH.CIV@US.NAVY.MIL, JOSEPH EDWARDS, EMAIL:

JOSEPH.A.EDWARDS7.CIV@US.NAVY.MIL

TEMPALSKI.JANELLE.K.1271

649335

Digitally signed by

TEMPALSKI.JANELLE.K.1271649335

Date: 2024.04.16 20:57:04 -04'00'

BLASER.NATHALINE.SWINT

.1047400402

Digitally signed by

Date: 2024.04.16 16:44:10 -04'00'

File details come from the government source that posted it. Updated .