AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modif ication is to extend the closing date of this solicitation from 8 January 2019 to 14 January 2019 and update Attachment J.5 Questions and Answ ers.

1. CONTRACT ID CODE PAGE OF PAGES

1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017819R3006

X 9B. DATED (SEE ITEM 11)

20-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jan-2019

CODE

NSWC, DAHLGREN DIVISION

CHARLENE LOWE, CONTRACT SPECIALIST

17632 DAHLGREN ROAD , SUITE 104

DAHLGREN VA 22448-5110

N00178 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0017819R3006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 08-Jan-2019 01:00 PM to 14-Jan-2019 10:00 AM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

PROPOSAL PREPARATION REQUIREMENTS/INSTRUCTIONS FOR SUBMISSION

L.1 INSTRUCTIONS FOR SUBMISSION OF OFFERS

L.1.1 Proposals must be submitted electronically, via email in order to be officially submitted for award. Sub-contractor cost proposals are to be submitted directly to the Government via email. Sub-contractors cost proposals are to consist of the Sub-contractors’ unsanitized cost proposal spreadsheet and supporting cost narrative. Sub-contractors or Consultants not possessing a DUNS number and CAGE code shall transmit their unsanitized cost proposal in an appropriately password protected manner to their respective Prime Contractor for inclusion within the Prime Contractor's proposal submission package submitting their password protected cost proposals through the Prime Contractor in this manner shall ensure that the applicable passwords are communicated via email to the Contract Specialist at Charlene.lowe@navy.mil and Contracting Officer at Dana.Phillips@navy.mil..

L.1.2 Offerors must comply with the instructions for format and content for the proposals; proposals that do not comply may be considered non-responsive and may render the Offeror ineligible for award. Proposals shall be limited to the content requested.

L.1.3 In order to maximize efficiency and minimize the time for proposal evaluation, it is required that Offerors submit their proposals in accordance with the format and content specified. The electronic proposal shall be prepared so that if an evaluator prints the proposal, it meets the following format requirements:

(a) Submissions shall be clearly legible and on 8.5 X 11 inch paper.

(b) All files shall be compatible with Microsoft Office Suite.

(c) Adobe (.pdf) files are allowable for documents containing original signatures.

(d) Cost proposal shall contain spreadsheets in Microsoft Excel software, with all file names with the file extension “.xlxs”.

(e) All spreadsheets provided SHALL INCLUDE ALL CALCULATIONS IN THE CELLS (i.e. show formulas).

REVIEWERS MUST BE ABLE TO RECOGNIZE WHAT CELLS ARE INVOLVED IN CALCULATING

RESULTS.

(f) The spreadsheets shall be formatted for printing on 8.5 x 11 inch paper (NOT legal sized paper) (Landscape format is permissable).

(g) The spreadsheets shall be formatted such that row and column headings appear on each printed page.

L.2 SUBMISSION OF QUESTIONS BY POTENTIAL OFFERORS

mailto:Charlene.lowe@navy.mil

It is the offeror's responsibility to bring to the attention of the Contracting Officer at the earliest possible time, but prior to the closing date, any ambiguities, discrepancies, inconsistencies, or conflicts between the Statement of Work (SOW) and other solicitation documents attached hereto or incorporated by reference. All questions are requested in writing by 14 days after the solicitation is issued.

L.3 ORGANIZATION AND MINIMUM CONTENT OF THE PROPOSAL

In order to facilitate evaluation, it is desired that the Proposal be structured into the following components.

L.3.1 VOLUME I: SOLICITATION, OFFER AND AWARD DOCUMENTS (SF 33 - RFP)- one Electronic Copy

L.3.1.2 This document, which may be used as part of the contract award document, shall be fully executed and returned as a separate document from the technical proposal and cost proposals. Complete the fill-ins in Section(s) K, complete all Representations and Certifications in Section K, and ensure that an authorized person signs the offer in Block 17 of Page 1. This document shall not be embellished with any covers or binding.

L.3.1.3 Offerors are encouraged not to take exceptions to this solicitation, however, any exceptions taken to the specifications, or terms and conditions of this solicitation shall be identified in a cover letter and explained in detail in the appropriate section of the technical proposal.

L.3.2 VOLUME II: TECHNICAL PROPOSAL - One Electronic Copy

The technical proposal shall not contain any reference to cost and shall be prepared in accordance with the following guidelines and the TECHNICAL PROPOSAL specific requirements below.

The technical proposal should be written so that management and engineering oriented personnel can make a thorough evaluation and arrive at a sound determination as to whether the proposal meets the requirements of this solicitation. To this end, the proposal shall be so specific, detailed and complete as to clearly and fully demonstrate that the prospective contractor has a thorough understanding of the technical requirements contained in Section C of this solicitation. The technical proposal shall not exceed 50 pages in its discussion of management, technical, corporate experience, personnel and facilities.

Statements such as "the offeror understands", "will comply with the statement of work," "standard procedures will be employed", "well known techniques will be used" and general paraphrasing of the statement of work are considered inadequate. The technical proposal must provide details concerning what the contractor will do and how it will be done. This includes a full explanation of the techniques, disciplines, and procedures proposed to be followed.

Unnecessarily elaborate brochures or other presentations beyond that sufficient to present a complete and effective proposal are not desired and may be construed as an indication of the offeror's lack of cost consciousness. Elaborate art work, expensive paper and bindings, or expensive visual and other presentation aids are neither necessary nor desired.

In the event any portion of the technical proposal is written by anyone who is not a bona fide employee of the firm submitting the proposal, a certificate to this effect shall be furnished. It must be signed by a responsible officer of the offeror and shall show the author's name, employment capacity, the name of the person's firm, the relationship of that firm to the offeror's, and the portion of the technical proposal he/she wrote.

Technical information previously submitted, if any, may not be considered by the Government; hence, any such information should not be relied upon or incorporated in the technical proposal by reference.

Address the specific requirements of L.3.2.1, L.3.2.2, L.3.2.3, and L.3.2.4 Factor & Sub-Factors listed below which will be evaluated in accordance with Section M of the Solicitation.

Factor 1: Technical Understanding/Capability/Approach

Sub-Factor 1: Scenario Sub-Factor 2: Statement of Work (SOW) Factor 2: Past Performance Factor 3: Management Approach Factor 4: Cost

L.3.2.1 MANDATORY REQUIREMENTS

Offerors shall clearly demonstrate how they meet the mandatory requirements. Offerors must meet the following mandatory requirements at time of proposal submission. In addition, the mandatory requirements shall be maintained throughout the life of the Contract. The mandatory requirements are as follows:

Requirement 1: The Fiber Optic Quality Assurance/Supervisor and Fiber Optic Installer labor categories must meet the personnel proficiency requirements as defined in Requirement 1306 of MIL-STD-1678-1D and MIL-STD-2042.

Requirement 2: Personnel Security Clearance: All personnel must possess a minimum SECRET level security clearance.

Requirement 3: Facility Security Clearance - The Prime contractor’s facility(s) shall be cleared at the SECRET level for processing and storage/safeguarding and shall be capable of storing Naval Nuclear Propulsion Information.

L.3.2.2 FACTOR 1: TECHNCIAL UNDERSTANDING/CAPABILITY/APPROACH

Offerors shall demonstrate their technical understanding of the scenario and the SOW as well as their technical approach and capability to accomplish tasking under the SOW.

SUB-FACTOR 1.1: SCENARIO

Offerors shall explain the process it would go through to accomplish this tasking. As a minimum, this shall include:

assumptions, decomposition of the scenario into process steps, process step description(s), identification of additional information needed from the Government; task staffing, and task flow/interfaces, risk, risk reduction processes, or other related processes to define and execute the scenario.

Offerors should feel free to address other aspects of scenario execution to convey the depth and breadth of their technical understanding and approach.

Scenario: Fiber Optic Link Repair

The Offeror is tasked to perform the following fiber optic repair tasking in accordance with MIL-STD-2042C and NAVSEA Standard Item 009-123 onboard a Naval Vessel that possesses a Blown Optical Fiber Cable Plant with fusion spliced interconnections:

Task 1: Disconnect and Remove broken blown optical fiber from a damaged 7-tube trunk cable.

Task 2: Remove and replace the damaged 7-tube trunk cable.

Task 3: Install new blown optical fiber

Task 4: Reestablish the previous fusion spliced interconnections

SUB-FACTOR 1.2: STATEMENT OF WORK (SOW)

The Offeror shall demonstrate its technical approach, specific knowledge, capability, and relevant experience (Prime and Sub-contractor) to perform the tasks listed in Section C.4 of the Statement of Work.

The Offeror shall address its approach to managing the technical efforts relating to the elements described in the SOW and their inter-relationship and geographic location of execution.

L.3.2.3 FACTOR 2: PAST PERFORMANCE

Offerors shall provide a minimum of two (2) past performance references for the Prime Contractor that reflects recent relevant experience performed within the last three (3) years that demonstrate the ability to handle the scope and breadth of the proposed contract. Offerors shall provide a minimum of one (1) past performance reference for each major Sub-contractor shall be provided which reflects recent relevant experience performed within the last three (3) years. Include the following items:

(a) Contract/Task Order number

(b) Contract type (e.g. CPFF-term; CPIF-completion; FFP, etc.)

(c) Program name

(d) Total contract value. If performed as a Subcontractor, also include the estimated value of support provided.

(e) Brief description of work performed and how the work is relevant to this task. Bullet format is preferred for this information.

(f) Valid names and telephone numbers and e-mails for the Procuring Contracting Officer (PCO) and Contracting Officer’s Representative (COR).

The Government may also use other information such as Award Fee data and CPARS/PPIRS data available from Government sources to evaluate an Offeror’s past performance. The Government reserves the right to limit or expand the number of references it decides to contact and to contact references other than those provided by the Offeror.

L.3.2.4 FACTOR 3: MANAGEMENT APPROACH

The Offeror shall demonstrate its approach and ability to effectively manage all efforts under this contract. This shall include the areas listed below. However, Offerors are strongly encouraged to address other aspects of their proposed management approach, which they consider will convey their management expertise.

(a) The Offeror shall identify by name the Contractor’s Technical and Contracting points of contact.

(b) The Offeror shall define its organizational structure, and the location and visibility of this effort within the corporate organization.

(c) The Offeror shall define the technical, management, and contracting lines of communication and show the relative position of the proposed points of contact in the Offeror's organization.

(d) The Offeror shall demonstrate its understanding of and ability to comply with the contracats business management aspects such as CDRL reporting, risks and risk mitigation, and invoicing.

L.3.3 VOLUME III: FACTOR 4 COST PROPOSAL

There are three (3) separate and distinct parts to the Cost Proposal.

(1) The Contractor shall include in their proposal Section B, with the following values for the CLINs: CLIN

0001: $5,752,632 CLIN 0002: $836,686 CLIN 0003: $1,895,425

(2)The Contractor shall include the costs assoicated with Delivery Order 0001 (L.3.3.1.1)by following the instructions in L.3.3., L.3.3.1.1., L.3.3.2., L.3.3.3., L3.3.4., and L36.

(3)The Contractor shall include the costs assoicated with the Request for Proposal (L.3.3.1.2) by following the instructions in L.3.3., L.3.3.1.1., L.3.3.2., L.3.3.3., L.3.3.4., and L36.

(a)No technical information shall be submitted as part of the Cost Proposal. The requirements of this Section apply equally to the Offeror and any proposed Sub-contractors regardless of subcontract type. Specifically, all Sub-contractors are required to submit un-sanitized proposals showing unburdened labor rates, all indirect rates, and must include all calculations in the cells (i.e. show formulas). Reviewers must be able to recognize what cells are involved in calculating results.

(b)It is the responsibility of the responsibility of the Prime Contractor to ensure that all Sub-contractors provide information at this same level of detail regardless of the subcontract pricing arrangement.

(c)If Subcontractors do not comply, this will be viewed as indicative of the Prime Contractor’s inability to control Subcontractor performance and could impact the Management Approach Factor evaluation result. The cost data shall be organized as follows. All pages shall be numbered and a table of contents provided.

(d) Provide the information requested in L.3.3.5.

L.3.3.1 COST SUMMARY

(a) Provide a cost summary for Deliver Order 0001 and the Request for Proposal in the format of Attachment J.3.

The cost proposal shall contain spreadsheets in Microsoft Excel with all file names with the file extension “.xls”;

spreadsheets provided shall include all calculations in the cells; and the proposal shall reflect whole dollars only for every cell except hourly rate.

(b) The spreadsheets shall be formatted for printing on 8.5 x 11- inch paper (NOT legal sized paper) (Landscape format is permissible)

(c) The spreadsheets shall be formatted such that row and column headings appear on each printed page.

(d) Subcontractors shall also follow the format provided in Attachment J.3 as well as the above instructions.

However, Subcontractors need not show unused rows in their spreadsheets submitted for Government review/analysis.

(e) “DELETED”

(f) All pages shall be numbered and a Table of Contents provided. No ZIP files, no foldout pages.

L.3.3.1.1 DELIVERY ORDER 0001

DELIVERY ORDER 0001 will be completion type.

The Offeror will provide a proposal for Delivery Order 0001 in accordance with Section L.3.3., L.3.3.1.1., L.3.3.2, L.3.3.3., L.3.3.4., and L36. Delivery Order 0001 will require attendance, meeting minutes, and additional proposed information for the request for quote. The Offeror shall provide the Level of Effort required fro Delivery Order 0001 by updating the 5252.216-9122 Level of Effort clause.

Within 15 business days after award of the contract the Contractor will hold a meeting with the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) fiber optic section engineers for the purpose of establishing initial contact between the Contractor and the NSWCDD fiber optic section engineers. The meeting will be held in Dahlgren, VA at a location To Be Determined by the Government unless the Offeror is over four hours from NSWCDD, then it is encouraged to schedule a Telecon or Video Telecon.

The Contractor shall provide a summary report from the meeting that includes but is not limited to the following:

(a) Meeting Minutes

(b) A written description of information the contractor desires to be included in future repair delivery orders. This information will assist NSWCDD in providing more complete task descriptions and facilitate a smoother bidding process on future repair delivery orders.

(c) An example template of the typical types of information the contractor would normally provide when bidding a repair job. This will help familiarize NSWCDD with the information coming from the contractor and facilitate a smoother review process on future repair delivery orders.

L.3.3.1.2 REQUEST FOR PROPOSAL

In addition to the proposal provided for Delivery Order 0001, the Offeror shall provide a Request for Proposal in order to be used for evaluation purposes. The Request for Proposal will be evaluated per M.4.5. The Request for Proposal hours, travel, and material costs listed below are associated with the scenario in L.3.3.2.2 (Sub- Factor 1.1).

The work will be performed in Norfolk, VA.

(a)The contract type is CPFF (Term).

(b) The LOE and Labor categeries are listed below. The Period of Performance shall be for 1 week starting on April 18, 2019.

Labor Category Hours Fiber Optic Installer 56 Fiber Optic Supervisor/QA 40 Project Manager 2

(c)Travel and Material. The Offerer shall use $1,964 for travel and $10,000 for materials and shall burden material in accordance with the Offeror approved accounting practices. Notes: The Travel and Material CLINs are cost only.

(d)Fixed Fee – The offeror shall propose fixed fee.

(e)The Offeror shall provide costs and supporting cost information in accordance with Section L.3.3., L.3.3.1.1., L.3.3.2., L.3.3.3., L.3.3.4., and L36.

L.3.3.2 LABOR RATES

The Cost Proposal shall reflect actual labor rates expected to be expended (delivered) in performing the proposed Delivery Order 0001 (L.3.3.1.1) and Request for Proposal (L.3.3.1.2); e.g., actual hourly rates for each labor category if such rates will be the basis for billing under the resultant contract, and not a composite rate of individuals within a labor classification or labor category. The Cost Proposal shall contain a table which shows the following for each labor category:

(1) Current (as of the date of proposal submission) actual hourly rate (based on a 40 hour work week) and note the effective date of the rate (Month/Year);

(2) Current decremented hourly rate (if UT/TTA is proposed or will be delivered);

(3) Provide copies of current payroll records to support proposed base hourly rates. In the case of a contingent hire, provide a copy of an accepted offer letter that identifies the agreed-to salary amount. Identify the labor escalation rate, if applicable, used for pricing purposes and rationale supporting the use of that rate.

(4) If you are proposing “TBD” or vacant positions, please provide written rationale for proposed hourly rates.

L.3.3.3 OTHER DIRECT COSTS

Travel – If travel is proposed, origin of travel, number of travelers, trip duration, and cost (separately show costs for, rental car, etc).

L.3.3.4 INDIRECT COSTS

(1) For each separate indirect cost pool reflected in your proposal (e.g., fringe benefits, overhead, G&A, etc.) clearly identify the rates used for proposal calculation.

(2) If DCAA has approved your indirect rates for bidding purposes (Forward Pricing Rate Agreement), please provide copies of the applicable DCAA correspondence or a copy of the Agreement.

(3) Please provide a complete description of each indirect cost pool and a listing of the types of costs that are charged to each pool. Identify the base to which the indirect cost rate is applied (for example, if the indirect pool is “Labor Overhead” and the indirect rate is applied to total direct labor cost, identify the base for the “Labor Overhead” pool as “Total Direct Labor Cost”). If DCAA has not approved your indirect rates, provide a complete explanation of how the proposed indirect rate was calculated. Indirect rates (and the methodology for computing those rates) that have not been approved by DCAA may require review by DCAA or by the NSWCDD Cost/Price Analyst prior to contract award.

(4) Provide a three-year history of actuals incurred for each proposed indirect rate. This history shall include the Offeror's most recently completed fiscal year and the three previous fiscal periods. Note whether the actuals have been audited by DCAA. Provide a detailed explanation for rate fluctuations from one year to the next of 10% or greater. For example, an increase of a 30% fringe rate to 33% is a 10% increase.

(5) Facilities Capital Cost of Money

The Offeror shall provide a completed DD Form 1861 - Contract Facilities Capital Cost of Money, if this element is to be proposed. This data shall be specifically identified in the cost proposal.

(6) Fixed-Fee

Offerors shall state their proposed fixed fee rate and the specific base to which it has been applied. If the proposal reflects a multiple fee rate structure (e.g, a lower fee rate applied to Sub-contract costs), each rate and the applicable base shall be explicitly identified. Although none is planned at this time, Offerors are reminded of the requirements of FAR 45.302-3(c) which provides that no fee shall be allowed on the cost of facilities when purchased for the account of the Government under other than a facilities contract.

L.3.3.5 OVERALL PROJECT

(1) Identify your cognizant DCAA and ACO (DCMC) offices. Provide the name of a point of contact for each and provide current phone numbers.

(2) Your accounting system must be approved by DCAA for cost type contracts. Please indicate whether or not your accounting system has been approved. If it has not, contact your cognizant DCAA as soon as possible to arrange for this review; this can add as much as 8-12 weeks to the contract award process.

(3) Identify your fiscal year if other than the calendar year.

(End of Summary of Changes)

L.3.2.2 FACTOR 1: TECHNCIAL UNDERSTANDING/CAPABILITY/APPROACH
Offerors shall demonstrate their technical understanding of the scenario and the SOW as well as their technical approach and capability to accomplish tasking under the SOW.