Released SF 30 Amendment 0001 - 102 Operation Support Solicitation.pdf

PDF 932 KB Posted

Attached to
102 Operations Support
Solicitation number
N0017424SN0009
Issued by

About this file

This document is an Amendment to a Solicitation for the 102 Operation Support contract at the Naval Surface Warfare Center Indian Head, Indian Head, Maryland. The Performance Work Statement outlines the contractor's requirements to furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and incidental engineering at various locations around the Naval Support Facility Indian Head. The work will be a combination of recurring and non-recurring services. Key details include:

The solicitation was amended to provide responses to pre-proposal inquiries regarding the workload requirements, quantities, work locations, and other contractual details. The proposal due date was extended from September 26, 2024 to October 17, 2024. The contract will be for recurring work, with non-recurring work ordered on an as-needed basis. Non-recurring work may consist of unit priced tasks or unit priced labor. The contractor must comply with various safety, environmental, security, and administrative requirements outlined in the Performance Work Statement.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

102 Operation Support, Naval Surface Warfare Center Indian Head, Indian Head, Maryland

Amendment 0001

See SF30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 74

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017424R0031

X 9B. DATED (SEE ITEM 11)

27-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2024

CODE

NSWC IHD C02

4081 N. JACKSON RD

BLDG 841

INDIAN HEAD MD 20640-5116

N00174 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0017424R0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following Pre-Proposal Inquiries (PPI’s) were received in response to the solicitation

Inquiry 0001

1. Elin E0001 Stump Neck: Need workload requirements to price Response: Refer to section 3.2.6 under 1700000 - Transportation: Stump Neck Support.

Inquiry 0002

2. B936 Rental of heavy equipment with operator: Quantity of 10 is that by the hour, by the day, the week?

Response: A936, B936, C936, D936, and E936 quantity is per day.

Inquiry 0003

3. B942 Digging Support: Quantity of 10 is that by the hour, the day or week?

Response: A942, B942, C942, D942, and E942 quantity is per day.

Inquiry 0004

4. B945 Furniture Assembly the workload is ambiguous as assembly could be one desk or 100 desk, this requires additional information.

Response: A945, B945, C945, D945, and E945 will be negotiated at the task order level.

Inquiry 0005

5. Page 20 of 116 Par 2.4 Will the Government provide property for Contractor provided office and area for equipment, materials and tools on base.

Response: Yes, location to be determined between IHD and Stump Neck Annex.

Inquiry 0006

6. Page 45 of 116 Par 3.2: last line states See J-1700000-03 for historical data, this is not included.

Response: 3.2 has been revised to remove the historical data reference.

Inquiry 0007

7. Page 103 of 116 Par 3.1.1.1 Please define electronically is this via e-mail, flash drive.

Response: Via e-Mail.

Iquiry 0008

8. Page 104 of 116 Par 4.1: States 8.5 X 11 paper, is a hard copy (paper) required.

Response: No.

Inquiry 0009

9. Collective Bargaining Agreement: NSWC has been provided these services by an incumbent contract under a

NAVFAC contract, the Operational Support will continue under this solicitation and should not viewed as a new solicitation. Changing the agency that solicits Operational Support does not make it “new” never contracted services. I am requesting that the collective bargaining agreement of the incumbent contract be included.

Response: The CBA that is currently included in a contract that contains similar work will be incorporated to be utilized for pricing for work being completed at NSWC IHD and Stump Neck. The SCA WD’s included in this RFP as attachments are to be utilized for pricing for all other areas where work will be completed.

Inquiry 0010

10. Page 108 of 116, Element D Safety. It appears that many of the Sections have been addressed in other elements and that Element D should only address Safety issues. Does this need to be corrected?

Response: No, this is correct.

Inquiry 0011

11. RFP Section 2.8.7: Security Requirements – will the Government sponsor the small business awardee for

Facility Security Clearance, or at a minimum, sponsor the clearances for Key Personnel and others for which clearance is required?

Response: The Government would sponsor the clearances for Key personnel and others, if required, cost not included. The Project Manager and Trainer will be required to have CAC (Common Access Cards)

The Solicitation is hereby amended to provide response to PPI 0001 – PPI 0011.

The proposal due date is changed from 26 September 2024 at 1400 EST to 17 October 2024 at 1400 EST All other terms and conditions remain unchanged.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

DESCRIPTION AND SPECIFICATION

SECTION C

SECTION TITLE

ANNEX 0100000 GENERAL INFORMATION

ANNEX 0200000 MANAGEMENT AND ADMINISTRATION

ANNEX 1700000 TRANSPORTATION

Annex 0100000 – General Information

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at various locations in and around NSWC Indian Head by means of a combination Recurring and Nonrecurring Work Contract.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 1, 2 and 17 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 17 Transportation

1.2 Project Location The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations.

NSWC Indian Head, Indian Head MD NSWC IHD Stump Neck, MD (located 12 miles from the Facility in Indian Head, MD) Bullet’s Neck, MD (located 11 miles from the Facility in

Indian Head, MD) Rum Point, MD (located 12 miles from the Facility in

Indian Head, MD) NRL Pomonkey, MD (located approximately 10 miles from the Facility in Indian Head, MD) NRL Blossom Point, MD (located approximately 25 miles from the Facility in Indian Head, MD) NSWC IHD Detachment Picatinny, Picatinny Arsenal

NJ ( Approx 280 miles from Indian Head, MD) NSWC IHD Detachment MCAAP, McAlester, OK (

Approx 1,294 miles from Indian Head, MD ) NSWC IHD Detachment Louisville, Louisville KY (

Approx 639 Miles from Indian Head, MD) NSWC IHD Detachment Rock Island – Rock Island IL (

Approx 884 miles from Indian Head, MD) NSWC IHD Detachment Ogden, Ogden UT ( Approx

2,107 miles from Indian Head, MD ) NSWC IHD Detachment Crane, Crane IN ( Approx 691

Miles from Indian Head, MD)

NSWC IHD Detachment Camp Pendleton, Camp Pendleton CA ( Approx 2,691 Miles from Indian Head, MD)

NSWC IHD Detachment Laredo, TX (Approx 1,736 Miles from Indian Head, MD)

1.3 Acquisition of

Additional Work

NSWC reserves the right to acquire additional services which will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information With the nation's capital at its heart, the NSWC Naval District Washington Region encompasses over 300 square miles, including the District of Columbia, Maryland and Virginia. NSWC Naval District Washington is the regional provider of common operating support to three Naval installations within a one-hundred-mile radius of the Pentagon.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.

1.6 Climate Patterns The climate in the Washington DC, Maryland, and Virginia (DMV) area is hot and humid during the summer months of June through August with an average high of 86 degrees and average low of 64 degrees. The winter months are cold with an average high of 45 degrees and an average low of 26 degrees during the months of November through February. Average seasonal snowfall is under a foot per year.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Surface and Warfare Center (NSWC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.

Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NSWC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements.

Specification item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 N/A

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

Annex 0200000 – Management and Administration

0200000 – Management and Administration Table of Contents

Spec Item Title

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Partnering

2.3.2.1 Informal Partnering

2.3.2.2 Contract Partnering Administration

2.3.2.3 Contract Partnering Session Attendees

2.3.3 Permits and Licenses

2.3.4 Insurance

2.3.4.1 Certificate of Insurance

2.3.4.2 Minimum Insurance Amounts

2.3.5 Protection of Government Property

2.3.6 Government Information Technology (IT) System

2.3.7 Directives, Instructions, and References

2.3.8 Invoicing Procedures

2.3.9 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 Quality Management System (QMS)

2.6.6.1 Quality Management (QM) Plan

2.6.6.2 Quality Inspection and Surveillance

2.6.6.3 Quality Inspection and Surveillance Report

2.6.7 Property Management Plan

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Control Manager (QCM)

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Licensing/Performance Examiner and Training Instructor (Key Personnel)

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDs Program

2.8.4.2 DBIDs Paper Passes

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Confined Space Program

2.9.3.3 Critical Lift Plan

2.9.3.4 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.2 Environmental Protection

2.10.2.1 ODS Requirements for Refrigerant Recycling

2.10.2.2 Non-Hazardous Waste Disposal

2.10.2.3 Hazardous Waste Disposal

2.10.2.4 Spill Prevention, Containment, and Clean-up

2.10.2.5 Hazardous Material Management

2.10.2.6 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.7 Noise Control

2.10.2.8 Asbestos Containing Material (ACM)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Bio-based Products

2.11 Disaster Preparedness

2.12 Recurring Work Procedures

2.12.1 Notification to the Government for Work Above the Recurring Work Limitations

2.12.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.13 Non-recurring Work

2.13.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.13.1.1 Acceptance and Performance

2.13.1.2 Invoicing and Receiving Payment

2.13.2 Unit Priced Labor (UPL)Work (Negotiated)

2.13.2.1 Non-recurring Preparation of Proposals

2.13.2.1.1 Labor Requirements

2.13.2.1.2 Material and Equipment Requirements

2.13.2.2 Issuance of Final Task Order

2.13.3 Non-recurring ELINS

0200000 - Management and Administration

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General Information

2.2.1 Government Regular

Working Hours The Government's regular working hours are from 0630-1530, five days per week, Monday through Friday, except observed Federal holidays.

Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage Determinations Wage Determinations are included in J-0200000-03.

2.2.3 Requirements

Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General Administrative Requirements

2.3.1 Required Conferences

and Meetings The Contractor may be required to attend administrative and coordination meetings.

2.3.2 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NSWC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.2.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.2.2 Contract Partnering

Administration

Upon award, the PCO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.2.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager Site Safety and Health Officer

2.3.3 Permits and Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.4 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.4.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days’ written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.4.2 Minimum Insurance

Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law.

2.3.5 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.6 Government

Information Technology (IT) System

Additional information about NMCI may be obtained at http://www.eds.com/nmci.

2.3.7 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.8 Invoicing Procedures Refer to Section G for invoicing instructions.

2.3.9 Forms See J-0200000-04.

2.4 Government-Furnished

Property, Materials and Services

No GFP, GFM, or GFS provided

2.4.1 Government-Furnished

Property (GFP)

No GFP provided

2.4.2 Government-Furnished

Utilities

No GFU provided

2.4.3 Government-Furnished

Materials (GFM)

No GFM provided.

2.4.4 Government-Furnished

Equipment (GFE)

No GFE provided

2.4.5 Government-Furnished

Services (GFS)

No GFS provided.

2.5 Contractor-Furnished

Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.

Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to work orders and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases, where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.

Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO and customers as soon as practicable.

2.6.6 Quality Management

System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.6.1 Quality Management

(QM) Plan

The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System (QMS)

• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work

• Documentation and records management

• Communication with government (customers)

2.6.6.2 Quality Inspection and

Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

2.6.6.3 Quality Inspection and

Surveillance Report

N/A

2.6.7 Property Management

Plan

N/A

2.6.7.1 Ticket Usage Report N/A

2.7 Personnel

Requirements The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel All Key Personnel with the exception of the Licensing/Performance Examiner and Training Instructor must be on site during all scheduled, unscheduled, re-curring and non-recurring work activities and until project completion.

In the event a Key Personnel is not on-site the Contractor must notify the Government Point of Contact and the Contracting Officer the day before for scheduled absences and no later than 7am on the day of an unscheduled absence.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality

Manager, SSHO, and Trainer and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1 Project Manager (PM)

(Key Personnel)

The Contractor shall provide a PM and designated alternate who has the full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours. Designation of the PM or the alternate PM must be submitted to the Contracting Officer for approval.

The PM must have an active Secret Security Clearance at the time of award of the contract. The PM cannot be dual hatted. This individual cannot perform the responsibilities of other positions on this contract. The PM must have at a minimum the OSHA 30 training. The PM must have at least five years of experience and must have managed within the past three years each of the following: crane operations at a minimum of 20 tons, crane inspections, experience managing scale and magazine support services, and experience managing equipment and material moves up to 30,000 lbs, experience in managing transportation operations that includes management of a dispatcher, equipment operators, safety program, experience managing a staff of a minimum of fifteen (15) personnel, and the overall daily operations that provide support services on a contract of similar size, scope and complexity.

2.7.1.2 Quality Control

Manager (Key Personnel)

The Contractor shall provide a Quality Control Manager or designated alternate shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Control Manager must report mishaps, near misses and all safety violations to the Government Point of Contact, to a senior corporate official and to the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Control Manager under this contract:

The Quality Control Manager shall have at least three years of experience within the last three years preparing and enforcing QMS programs for a transportation contract of similar size, scope and complexity. The Quality Control Manager can not be the same person as the SSHO.

The Quality Control Manager may not be dual hatted. This individual can not perform the responsibilities of other positions on this contract.

Designation of the Quality Control Manager or the alternate Quality Control Manager must be submitted to the Contracting Officer for approval.

2.7.1.3 Site Safety and Health

Officer (SSHO) (Key Personnel)

The SSHO must meet the requirements of EM 385-1-1 LATEST EDITION Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1- 1 latest edition paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs. A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office. The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract: The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs for a transportation operation contract of similar size and complexity within the past three years and possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years.

Designation of the SSHO or the alternate SSHO must be submitted to the Contracting Officer for approval.

2.7.1.4 Licensing/Performance

Examiner and Training Instructor (Key Personnel)

The Contractor shall certify and submit to the Contracting Officer the resume and certifications that demonstrate that instructors are certified and qualified to provide instruction, testing and licensing requirements in accordance with NAVFAC P-307, NAVFAC P-300, NAVSEASW023- AH-WHM-010, NAVESASW020-AF-ABK-010, COR 2.7.1.4 Federal job classifications and NAVFAC Washington Instruction 11260.1. The licensing/Performance Examiner and Training Instructor must have an active Secret Security Clearance at the time of award of the contract. The Licensing/Performance Examiner and Training Instructor shall have completed one year of satisfactory experience in administering testing and evaluations for transportation operations on a transportation contract of similar size and complexity within the past two years. The Licensing/Performance Examiner and Training Instructor cannot be dual hatted. This individual cannot perform the responsibilities of other positions on this contract. Designation of the Licensing/Performance Examiner and Training Instructor or the alternate Licensing/Performance Examiner and Training Instructor must be submitted to the Contracting Officer for approval.

2.7.1.5 Crane Operators (Key

Personnel)

See 2.9.4.3

2.7.2 Employee

Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.

2.7.2.1 Employee Certification

and Training

The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.

2.7.2.2 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.3 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner. Contract employees that fail to comply with this spec item is subject to removal from the contract and are subject to being banned from South Potomac installations by the Contracting Officer.

2.7.2.4 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

2.7.2.5 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.6 Proof of Legal

Residency

No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is furnished per Section F.

2.8 Security Requirements The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, supervisor, company, and level of security clearance.

2.8.2 Vehicles The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.

2.8.3 Passes and Badges All Contractor employees shall obtain the required employee and vehicle passes. The Contractor employees must be able to obtain Common Access Cards (CAC) in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days.

2.8.4 Access to Installation All Contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS), or by obtaining a temporary pass from the Base Pass and Identification Office. Temporary passes issued through the Base Pass and Identification Office will be furnished without charge. Immediately report instances of lost or stolen badges to the Base Pass and Identification Office The Contractor shall furnish a completed DEPARTMENT OF THE

NAVY LOCAL POPULATION ID CARD/BASE ACCESS PASS

REGISTRATION (SECNAV FORM 5512/1) form for all personnel requesting badges. Refer to J-0200000-08 for SECNAV 5512/1 form.

Refer to J-0200000-07 for DBIDS Standard Operating Procedures.

2.8.4.1 DBIDS Program Defense Biometric Identification System (DBIDS) is an enterprise identity management and perimeter installation access control solution. DBIDS increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions.

The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.

If the vendor/contractor employee passes the background screening process, the DBIDS credential that is issued to the vendor/contractor employee is valid for the term of the card. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges.

Contractors or vendors who need assistance in transitioning from NCACS to a DBIDS temporary pass to a DBIDS card can contact the installation Pass & ID office or Visitor Control Center.

1. If you currently have a Navy Commercial Access Control System (NCACS) card (used with RAPIDGate), the following is required to get a DBIDS credential:

a) Present your NCACS Card and a completed copy of the

SECNAV FORM 5512/1 to the base Visitor Control Center representative.

b) The VCC will pull up your information in the computer, ensuring all information is current and correct.

c) Once your information is validated, a temporary DBIDS credential is provided.

d) Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 90 days).

e) For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.

f) The representative will enter base access authorization.

2. If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:

a) Present a letter or official document from my government sponsoring organization that provides the purpose for your access.

b) Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c) Present a completed copy of the SECNAV 5512/1 form to obtain your background check.

Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.

2.8.4.2 DBIDS Paper Passes In the event that a visitor, vendor, or contractor employee elects not to participate in DBIDS, or is ineligible to receive a CAC, the individual will be issued DBIDS paper pass in order to access to the installation. Paper passes may be restricted to one day in duration. The maximum duration for a DBIDS paper pass is 30 days.

2.8.5 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.

2.8.6 Access Arrangements The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor.

T…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .